PREPARING ROW
|
AC
|
0.300
|
$21,000.000
|
$5,000.000
|
$350,000.000
|
$20,000.000
|
$39,000.000
|
$207,000.000
|
$45,750.000
|
$65,000.000
|
$400,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
3,380.000
|
$25.000
|
$8.500
|
$5.000
|
$4.500
|
$10.450
|
$8.000
|
$20.000
|
$28.000
|
$20.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
607.000
|
$30.000
|
$5.000
|
$4.000
|
$2.900
|
$8.150
|
$4.000
|
$10.000
|
$22.000
|
$20.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,875.000
|
$11.000
|
$0.100
|
$2.500
|
$1.900
|
$2.250
|
$2.000
|
$3.000
|
$5.000
|
$20.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
50.000
|
$35.000
|
$20.000
|
$9.000
|
$25.000
|
$84.500
|
$25.000
|
$10.000
|
$35.000
|
$20.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,468.000
|
$11.000
|
$2.000
|
$2.750
|
$5.000
|
$11.000
|
$6.000
|
$5.000
|
$22.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
3,380.000
|
$6.000
|
$4.000
|
$2.500
|
$4.800
|
$4.100
|
$6.000
|
$10.000
|
$15.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
764.000
|
$15.000
|
$27.000
|
$50.000
|
$17.000
|
$21.500
|
$20.000
|
$13.000
|
$20.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,896.000
|
$15.000
|
$17.000
|
$26.000
|
$27.000
|
$25.750
|
$33.000
|
$15.500
|
$35.000
|
$30.000
|
|
|
EMBANK(FINAL)(DC)(TY E)(CSBE)
|
CY
|
1,610.000
|
$85.000
|
$46.000
|
$40.000
|
$105.000
|
$75.000
|
$70.000
|
$70.000
|
$70.000
|
$50.000
|
|
|
BLOCK SODDING
|
SY
|
4,458.000
|
$4.250
|
$4.500
|
$5.750
|
$3.750
|
$3.800
|
$4.000
|
$4.750
|
$4.400
|
$8.000
|
|
|
FERTILIZER
|
AC
|
0.920
|
$1,000.000
|
$1,600.000
|
$1,500.000
|
$1,100.000
|
$978.000
|
$1,000.000
|
$2,000.000
|
$1,000.000
|
$2,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
111.000
|
$32.000
|
$21.000
|
$10.000
|
$25.000
|
$44.000
|
$15.000
|
$45.000
|
$50.000
|
$50.000
|
|
|
LIME TRT(MIX EXST MATL & NEW BASE)(6")
|
SY
|
1,532.000
|
$21.000
|
$7.000
|
$5.500
|
$8.000
|
$10.000
|
$16.000
|
$4.500
|
$10.000
|
$12.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
31.000
|
$235.000
|
$190.000
|
$175.000
|
$185.000
|
$215.000
|
$198.000
|
$185.000
|
$230.000
|
$200.000
|
|
|
CEMENT
|
TON
|
31.000
|
$300.000
|
$135.000
|
$185.000
|
$165.000
|
$150.650
|
$200.000
|
$205.000
|
$275.000
|
$200.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
1,532.000
|
$6.000
|
$7.000
|
$4.250
|
$8.800
|
$8.000
|
$7.000
|
$30.000
|
$32.000
|
$12.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
3,064.000
|
$38.000
|
$20.000
|
$13.500
|
$21.000
|
$22.100
|
$19.000
|
$29.000
|
$35.000
|
$35.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
169.000
|
$225.000
|
$90.000
|
$120.000
|
$135.000
|
$175.000
|
$185.000
|
$210.000
|
$275.000
|
$140.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
3,064.000
|
$100.000
|
$76.000
|
$70.000
|
$98.000
|
$96.950
|
$88.000
|
$89.000
|
$74.000
|
$98.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
28.000
|
$275.000
|
$250.000
|
$309.820
|
$350.000
|
$186.000
|
$200.000
|
$570.000
|
$325.000
|
$385.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
139.000
|
$550.000
|
$475.000
|
$405.000
|
$425.000
|
$553.000
|
$515.000
|
$450.000
|
$640.000
|
$550.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
58.000
|
$560.000
|
$380.000
|
$400.000
|
$380.000
|
$489.000
|
$515.000
|
$410.000
|
$575.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
22.000
|
$630.000
|
$420.000
|
$445.000
|
$560.000
|
$827.500
|
$760.000
|
$650.000
|
$650.000
|
$500.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
452.000
|
$70.000
|
$130.000
|
$48.000
|
$79.000
|
$110.000
|
$114.000
|
$65.000
|
$165.000
|
$155.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,500.000
|
$800.000
|
$2,500.000
|
$760.000
|
$800.000
|
$1,075.000
|
$1,150.000
|
$545.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$146,070.000
|
$105,000.000
|
$114,000.000
|
$77,500.000
|
$127,000.000
|
$135,000.000
|
$140,000.000
|
$140,000.000
|
$170,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$10,000.000
|
$5,300.000
|
$20,000.000
|
$1,000.000
|
$5,860.000
|
$3,000.000
|
$5,000.000
|
$2,000.000
|
$8,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
130.000
|
$32.000
|
$30.000
|
$19.830
|
$52.000
|
$38.000
|
$27.000
|
$35.000
|
$30.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
130.000
|
$9.500
|
$20.000
|
$7.790
|
$5.000
|
$6.000
|
$8.000
|
$10.000
|
$8.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,417.000
|
$4.250
|
$3.000
|
$2.330
|
$5.000
|
$3.500
|
$4.000
|
$4.500
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,417.000
|
$2.000
|
$1.000
|
$0.640
|
$1.200
|
$0.600
|
$3.000
|
$1.000
|
$1.650
|
$2.000
|
|
|
CONC CURB (DOWEL)(SLOTTED)
|
LF
|
467.000
|
$9.000
|
$6.000
|
$14.250
|
$17.000
|
$17.000
|
$7.700
|
$8.000
|
$40.000
|
$40.000
|
|
|
CONC CURB (DOWEL) (TY II)
|
LF
|
1,502.000
|
$9.000
|
$4.000
|
$13.500
|
$11.500
|
$11.150
|
$6.700
|
$7.500
|
$10.000
|
$35.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
70.000
|
$200.000
|
$65.000
|
$70.000
|
$100.000
|
$122.000
|
$122.000
|
$80.000
|
$140.000
|
$125.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
249.000
|
$40.000
|
$16.000
|
$15.250
|
$32.000
|
$21.800
|
$20.000
|
$35.000
|
$22.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,900.000
|
$1,700.000
|
$1,675.000
|
$1,850.000
|
$1,887.000
|
$2,500.000
|
$2,500.000
|
$1,900.000
|
$1,850.000
|
|
|
MTL W-BEAM GD FEN (NESTED)(TIM POST)
|
LF
|
50.000
|
$60.000
|
$23.000
|
$21.000
|
$51.000
|
$29.500
|
$23.000
|
$30.000
|
$28.000
|
$50.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,418.000
|
$4.000
|
$1.700
|
$1.500
|
$4.750
|
$2.350
|
$6.000
|
$10.000
|
$4.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$350.000
|
$280.000
|
$250.000
|
$180.000
|
$88.500
|
$5.000
|
$500.000
|
$195.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$4,000.000
|
$2,600.000
|
$2,385.000
|
$3,000.000
|
$2,754.000
|
$3,000.000
|
$2,500.000
|
$3,000.000
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$600.000
|
$170.000
|
$150.000
|
$300.000
|
$177.000
|
$230.000
|
$1,500.000
|
$300.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$27,000.000
|
$30,000.000
|
$22,500.000
|
$26,000.000
|
$27,115.000
|
$26,000.000
|
$1,950.000
|
$28,000.000
|
$25,000.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
235.000
|
$12.000
|
$6.500
|
$8.760
|
$10.000
|
$12.650
|
$12.000
|
$13.000
|
$9.250
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
50.000
|
$30.000
|
$16.000
|
$11.160
|
$13.000
|
$14.150
|
$13.400
|
$15.000
|
$12.000
|
$40.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
10.000
|
$14.000
|
$8.500
|
$14.820
|
$17.000
|
$14.750
|
$14.000
|
$15.000
|
$16.000
|
$18.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
190.000
|
$2.000
|
$1.200
|
$1.480
|
$1.750
|
$1.270
|
$1.200
|
$2.000
|
$1.600
|
$3.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
90.000
|
$2.000
|
$1.800
|
$1.820
|
$2.100
|
$1.550
|
$1.500
|
$2.000
|
$2.100
|
$3.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
180.000
|
$2.000
|
$1.900
|
$1.890
|
$2.150
|
$1.750
|
$1.650
|
$2.000
|
$2.200
|
$3.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
450.000
|
$3.500
|
$2.200
|
$2.150
|
$2.500
|
$2.400
|
$2.250
|
$2.750
|
$2.350
|
$3.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
5.000
|
$1,200.000
|
$1,300.000
|
$812.300
|
$1,000.000
|
$728.000
|
$690.000
|
$4,750.000
|
$850.000
|
$1,200.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$5,325.000
|
$4,500.000
|
$4,219.260
|
$5,100.000
|
$4,028.000
|
$3,800.000
|
$4,100.000
|
$4,500.000
|
$6,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
13.200
|
$49.240
|
$23.000
|
$21.000
|
$90.000
|
$18.400
|
$55.000
|
$45.000
|
$23.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$650.000
|
$450.000
|
$385.000
|
$825.000
|
$711.000
|
$455.000
|
$350.000
|
$500.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$700.000
|
$600.000
|
$500.000
|
$930.000
|
$854.250
|
$623.000
|
$450.000
|
$625.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$1,200.000
|
$900.000
|
$890.000
|
$1,000.000
|
$1,589.000
|
$855.000
|
$550.000
|
$975.000
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$96.500
|
$60.000
|
$50.000
|
$45.000
|
$86.250
|
$143.000
|
$200.000
|
$70.000
|
$250.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
6.000
|
$60.000
|
$40.000
|
$35.000
|
$55.000
|
$40.250
|
$191.000
|
$150.000
|
$32.560
|
$250.000
|
|
REFL PAV MRK TY II (Y) (MED NOSE)
|
EA
|
2.000
|
$130.000
|
$180.000
|
$136.260
|
$400.000
|
$172.500
|
$273.000
|
$50.000
|
$165.000
|
$250.000
|
|
PREFAB PAV MRK TY B (W)(RR XING)
|
EA
|
1.000
|
$800.000
|
$530.000
|
$663.000
|
$515.000
|
$498.500
|
$762.000
|
$50.000
|
$450.000
|
$850.000
|
|
PREFAB PAV MRK TY B (MULTI)(SHIELD)
|
EA
|
3.000
|
$1,200.000
|
$2,400.000
|
$2,297.250
|
$515.000
|
$2,354.000
|
$2,200.000
|
$2,500.000
|
$2,200.000
|
$3,000.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
76.000
|
$7.000
|
$4.500
|
$6.160
|
$4.500
|
$4.600
|
$4.400
|
$7.500
|
$4.500
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
92.000
|
$7.000
|
$4.500
|
$4.390
|
$4.500
|
$4.600
|
$4.400
|
$5.500
|
$4.500
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
81.000
|
$7.000
|
$4.500
|
$5.490
|
$4.500
|
$4.600
|
$4.400
|
$6.500
|
$4.500
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
4,160.000
|
$1.250
|
$0.500
|
$0.630
|
$0.340
|
$0.550
|
$0.450
|
$1.000
|
$0.520
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$75.000
|
$4.000
|
$42.370
|
$35.000
|
$40.250
|
$82.000
|
$55.000
|
$37.000
|
$150.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$75.000
|
$4.000
|
$41.400
|
$35.000
|
$40.250
|
$82.000
|
$55.000
|
$38.000
|
$150.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
1.000
|
$75.000
|
$120.000
|
$93.000
|
$35.000
|
$115.000
|
$425.000
|
$100.000
|
$110.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
7,347.000
|
$0.200
|
$0.070
|
$0.060
|
$0.520
|
$0.010
|
$0.110
|
$0.250
|
$0.010
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,450.000
|
$0.400
|
$0.090
|
$0.080
|
$0.740
|
$0.010
|
$0.330
|
$0.250
|
$0.010
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
607.000
|
$1.310
|
$0.350
|
$0.310
|
$1.150
|
$0.010
|
$1.200
|
$0.500
|
$0.010
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
100.000
|
$1.310
|
$0.400
|
$0.330
|
$2.860
|
$0.010
|
$2.200
|
$0.500
|
$0.010
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
13.000
|
$36.000
|
$22.000
|
$12.040
|
$28.630
|
$23.000
|
$17.000
|
$20.000
|
$21.000
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
15.000
|
$36.000
|
$22.000
|
$12.040
|
$28.630
|
$23.000
|
$17.000
|
$20.000
|
$21.000
|
$35.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
1.000
|
$45.000
|
$22.000
|
$93.000
|
$28.630
|
$23.000
|
$22.000
|
$120.000
|
$21.000
|
$35.000
|
|
|
PAV SURF PREP FOR MRKS (SHIELD)
|
EA
|
3.000
|
$115.000
|
$22.000
|
$36.700
|
$28.630
|
$23.000
|
$22.000
|
$55.000
|
$21.000
|
$100.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$37,500.000
|
$40,000.000
|
$27,531.480
|
$31,000.000
|
$35,000.000
|
$34,000.000
|
$55,000.000
|
$29,000.000
|
$30,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
2.000
|
$320.000
|
$175.000
|
$171.610
|
$195.000
|
$188.000
|
$178.000
|
$250.000
|
$185.000
|
$285.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
2.000
|
$320.000
|
$175.000
|
$171.610
|
$195.000
|
$188.000
|
$178.000
|
$250.000
|
$185.000
|
$285.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
2.000
|
$320.000
|
$175.000
|
$171.610
|
$195.000
|
$188.000
|
$178.000
|
$250.000
|
$185.000
|
$285.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
2.000
|
$320.000
|
$175.000
|
$171.610
|
$195.000
|
$188.000
|
$178.000
|
$250.000
|
$185.000
|
$285.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
2.000
|
$320.000
|
$175.000
|
$171.610
|
$195.000
|
$188.000
|
$178.000
|
$250.000
|
$185.000
|
$285.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
2.000
|
$320.000
|
$175.000
|
$171.610
|
$195.000
|
$188.000
|
$178.000
|
$250.000
|
$185.000
|
$285.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
4.000
|
$120.000
|
$75.000
|
$88.810
|
$100.000
|
$179.500
|
$170.000
|
$250.000
|
$95.000
|
$150.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
585.000
|
$2.500
|
$2.300
|
$2.220
|
$2.500
|
$2.190
|
$2.100
|
$3.250
|
$2.500
|
$3.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$12,000.000
|
$10,000.000
|
$8,569.200
|
$9,800.000
|
$8,658.000
|
$8,200.000
|
$20,500.000
|
$9,000.000
|
$12,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$22,500.000
|
$11,500.000
|
$9,825.600
|
$11,000.000
|
$9,984.000
|
$9,500.000
|
$19,500.000
|
$10,200.000
|
$15,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
173.000
|
$65.000
|
$115.000
|
$90.000
|
$130.000
|
$28.750
|
$100.000
|
$200.000
|
$85.000
|
$150.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
3,651.000
|
$3.750
|
$1.000
|
$0.680
|
$0.650
|
$1.000
|
$0.680
|
$1.000
|
$0.900
|
$1.500
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
850.000
|
$4.250
|
$1.000
|
$0.700
|
$0.650
|
$1.000
|
$0.700
|
$1.000
|
$0.900
|
$1.500
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
1,285.000
|
$7.500
|
$1.600
|
$0.970
|
$0.800
|
$1.600
|
$1.100
|
$1.500
|
$1.500
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(DOT)
|
LF
|
165.000
|
$10.000
|
$2.300
|
$1.030
|
$0.800
|
$2.300
|
$2.000
|
$1.500
|
$2.100
|
$3.000
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
607.000
|
$12.000
|
$3.000
|
$2.020
|
$1.300
|
$4.600
|
$3.500
|
$2.500
|
$4.210
|
$5.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
100.000
|
$18.000
|
$10.000
|
$3.760
|
$2.800
|
$10.400
|
$6.750
|
$4.000
|
$9.200
|
$20.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
2,900.000
|
$7.000
|
$0.900
|
$0.710
|
$0.650
|
$1.000
|
$0.750
|
$1.000
|
$9.500
|
$1.500
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
13.000
|
$280.000
|
$200.000
|
$169.960
|
$450.000
|
$178.250
|
$170.000
|
$220.000
|
$170.000
|
$300.000
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
15.000
|
$330.000
|
$200.000
|
$170.240
|
$500.000
|
$212.750
|
$170.000
|
$220.000
|
$190.000
|
$300.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$8,000.000
|
$8,500.000
|
$5,736.000
|
$6,500.000
|
$6,597.000
|
$9,200.000
|
$10,120.000
|
$6,000.000
|
$8,500.000
|
|
|
GPS COMMUNICATIONS UNIT
|
EA
|
1.000
|
$1,100.000
|
$400.000
|
$355.200
|
$400.000
|
$410.000
|
$825.000
|
$1,000.000
|
$365.000
|
$5,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
42.000
|
$442.000
|
$225.000
|
$290.000
|
$360.000
|
$172.500
|
$225.000
|
$500.000
|
$200.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
72.000
|
$74.000
|
$46.000
|
$50.000
|
$42.000
|
$74.750
|
$50.000
|
$200.000
|
$60.000
|
$85.000
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
2.000
|
$845.000
|
$800.000
|
$818.400
|
$1,800.000
|
$950.000
|
$230.000
|
$550.000
|
$850.000
|
$2,500.000
|
|
|
RVDS(ADVANCE DET ONLY)(INSTALL ONLY)
|
EA
|
1.000
|
$1,170.000
|
$800.000
|
$818.400
|
$900.000
|
$950.000
|
$230.000
|
$550.000
|
$850.000
|
$2,500.000
|
|
Totals: |
$1,618,993.038
|
$1,099,712.940
|
$1,222,597.300
|
$1,255,535.100
|
$1,337,199.530
|
$1,349,524.650
|
$1,448,547.500
|
$1,588,069.070
|
$1,833,683.200
|