|
|
PREPARING ROW
|
STA
|
74.450
|
$3,500.000
|
$4,274.000
|
$5,000.000
|
$4,894.730
|
$3,500.000
|
$4,750.000
|
$3,100.000
|
$2,710.000
|
$922.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
433.000
|
$10.000
|
$22.580
|
$90.000
|
$26.000
|
$20.000
|
$19.000
|
$42.200
|
$50.000
|
$8.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
579.000
|
$12.000
|
$6.300
|
$25.000
|
$8.000
|
$15.000
|
$7.630
|
$19.500
|
$20.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,473.000
|
$9.000
|
$8.640
|
$10.000
|
$5.000
|
$13.000
|
$10.000
|
$3.300
|
$7.000
|
$29.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
38,073.000
|
$13.000
|
$9.930
|
$10.000
|
$13.000
|
$13.000
|
$15.000
|
$17.200
|
$17.000
|
$22.000
|
|
|
BLOCK SODDING
|
SY
|
60,976.000
|
$3.500
|
$4.600
|
$5.500
|
$4.970
|
$4.000
|
$4.970
|
$5.500
|
$5.000
|
$4.700
|
|
|
STRAW OR HAY MULCH
|
SY
|
12,805.000
|
$0.250
|
$0.250
|
$0.500
|
$0.460
|
$0.190
|
$0.460
|
$0.500
|
$0.260
|
$0.280
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
610.000
|
$0.150
|
$0.250
|
$3.000
|
$2.970
|
$3.000
|
$2.970
|
$3.300
|
$0.750
|
$0.280
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
12,195.000
|
$0.120
|
$0.300
|
$0.200
|
$0.180
|
$0.120
|
$0.180
|
$0.200
|
$0.120
|
$0.330
|
|
|
FERTILIZER
|
AC
|
15.240
|
$665.000
|
$750.000
|
$870.000
|
$866.200
|
$800.000
|
$866.200
|
$950.000
|
$1,250.000
|
$835.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,829.200
|
$18.000
|
$28.000
|
$15.000
|
$21.000
|
$30.000
|
$28.000
|
$35.000
|
$23.000
|
$31.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
14,518.000
|
$5.000
|
$3.710
|
$3.500
|
$3.000
|
$3.000
|
$2.500
|
$5.600
|
$3.000
|
$6.800
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
197.000
|
$200.000
|
$298.520
|
$300.000
|
$285.000
|
$275.000
|
$295.000
|
$280.000
|
$225.000
|
$211.000
|
|
|
CEMENT
|
TON
|
197.000
|
$200.000
|
$254.970
|
$180.000
|
$200.000
|
$210.000
|
$200.000
|
$180.000
|
$240.000
|
$194.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
14,518.000
|
$4.000
|
$2.780
|
$3.000
|
$4.000
|
$3.000
|
$2.500
|
$5.600
|
$3.000
|
$16.000
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
29,036.000
|
$17.000
|
$19.790
|
$20.000
|
$25.000
|
$23.000
|
$25.000
|
$16.900
|
$25.000
|
$18.800
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
1,644.000
|
$110.000
|
$117.270
|
$100.000
|
$114.000
|
$120.000
|
$109.000
|
$137.500
|
$150.000
|
$128.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
26,886.000
|
$70.000
|
$83.670
|
$85.000
|
$84.000
|
$99.000
|
$92.500
|
$100.000
|
$110.000
|
$109.000
|
|
|
CEM STABIL BKFL
|
CY
|
4,169.000
|
$45.000
|
$45.890
|
$50.000
|
$50.000
|
$48.000
|
$65.000
|
$53.000
|
$57.000
|
$59.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
410.000
|
$45.000
|
$45.890
|
$50.000
|
$50.000
|
$48.000
|
$65.000
|
$53.000
|
$66.000
|
$59.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
3,866.000
|
$2.500
|
$1.060
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.100
|
$6.000
|
$2.200
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
15.000
|
$110.000
|
$622.060
|
$210.000
|
$210.000
|
$220.000
|
$210.000
|
$298.000
|
$170.000
|
$301.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
10.000
|
$225.000
|
$255.000
|
$255.000
|
$255.000
|
$330.000
|
$255.000
|
$281.000
|
$260.000
|
$284.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$2,000.000
|
$2,729.270
|
$3,000.000
|
$430.000
|
$1,500.000
|
$2,325.000
|
$1,458.000
|
$1,400.000
|
$1,330.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
7.000
|
$440.000
|
$481.810
|
$800.000
|
$520.000
|
$800.000
|
$850.000
|
$676.000
|
$800.000
|
$520.030
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
87.000
|
$300.000
|
$492.890
|
$520.000
|
$500.000
|
$460.000
|
$600.000
|
$475.000
|
$530.000
|
$998.940
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
219.000
|
$700.000
|
$594.570
|
$550.000
|
$500.000
|
$570.000
|
$600.000
|
$496.000
|
$530.000
|
$670.420
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
30.000
|
$90.000
|
$208.490
|
$225.000
|
$130.000
|
$160.000
|
$150.000
|
$164.000
|
$93.000
|
$111.780
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,368.000
|
$105.000
|
$88.840
|
$80.000
|
$95.000
|
$85.000
|
$150.000
|
$91.000
|
$100.000
|
$117.570
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
3,145.000
|
$135.000
|
$106.340
|
$95.000
|
$115.000
|
$105.000
|
$160.000
|
$112.000
|
$140.000
|
$139.660
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,107.000
|
$170.000
|
$137.410
|
$140.000
|
$150.000
|
$140.000
|
$170.000
|
$158.000
|
$170.000
|
$199.150
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
17.000
|
$200.000
|
$262.820
|
$380.000
|
$280.000
|
$250.000
|
$250.000
|
$361.000
|
$300.000
|
$355.100
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
7.000
|
$10,200.000
|
$8,438.420
|
$8,000.000
|
$9,200.000
|
$9,500.000
|
$10,200.000
|
$8,100.000
|
$8,700.000
|
$7,231.970
|
|
|
MANH (COMPL)(TY A)
|
EA
|
6.000
|
$8,000.000
|
$6,458.280
|
$6,000.000
|
$6,500.000
|
$6,500.000
|
$9,700.000
|
$10,300.000
|
$6,600.000
|
$6,116.870
|
|
|
INLET (COMPL)(CURB)(TY C)
|
EA
|
33.000
|
$6,000.000
|
$5,943.700
|
$5,500.000
|
$6,200.000
|
$6,000.000
|
$8,825.000
|
$10,800.000
|
$5,500.000
|
$3,614.910
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
1.000
|
$65,000.000
|
$43,135.420
|
$35,000.000
|
$42,000.000
|
$35,000.000
|
$50,000.000
|
$81,370.000
|
$58,000.000
|
$40,741.760
|
|
|
INLET (COMPL)(EXT TY C)
|
EA
|
23.000
|
$2,500.000
|
$1,566.910
|
$1,800.000
|
$2,000.000
|
$2,000.000
|
$1,825.000
|
$2,668.000
|
$1,200.000
|
$3,614.910
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$12,000.000
|
$16,548.380
|
$25,000.000
|
$16,000.000
|
$20,000.000
|
$40,250.000
|
$34,500.000
|
$22,000.000
|
$23,503.610
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,400.000
|
$1,585.670
|
$1,800.000
|
$950.000
|
$1,500.000
|
$1,900.000
|
$1,901.000
|
$1,300.000
|
$3,638.420
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,800.000
|
$1,709.890
|
$2,250.000
|
$1,800.000
|
$1,700.000
|
$2,500.000
|
$3,918.000
|
$1,800.000
|
$3,638.420
|
|
|
SET (TY II) (DES 3) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,100.000
|
$1,597.810
|
$6,750.000
|
$1,700.000
|
$1,900.000
|
$2,400.000
|
$3,832.000
|
$1,700.000
|
$4,751.370
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$400.000
|
$440.290
|
$5,000.000
|
$350.000
|
$3,000.000
|
$975.000
|
$553.000
|
$600.000
|
$1,134.890
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,400.000
|
$2,073.080
|
$3,000.000
|
$2,000.000
|
$5,000.000
|
$5,000.000
|
$880.000
|
$5,000.000
|
$2,269.780
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$670,000.000
|
$740,000.000
|
$770,000.000
|
$780,000.000
|
$425,000.000
|
$45,000.000
|
$860,000.000
|
$640,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$3,791.450
|
$5,000.000
|
$2,200.000
|
$6,000.000
|
$5,600.000
|
$1,825.000
|
$4,000.000
|
$1,706.510
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
351.000
|
$40.000
|
$36.790
|
$36.800
|
$36.790
|
$37.000
|
$36.790
|
$41.000
|
$31.000
|
$31.760
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
351.000
|
$12.000
|
$11.810
|
$11.800
|
$11.810
|
$12.000
|
$11.810
|
$13.000
|
$10.000
|
$9.120
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$30.000
|
$38.500
|
$38.500
|
$38.500
|
$40.000
|
$38.500
|
$42.000
|
$27.000
|
$23.770
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$10.000
|
$9.860
|
$9.850
|
$9.860
|
$10.000
|
$9.860
|
$11.000
|
$12.000
|
$11.880
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,392.000
|
$3.000
|
$3.530
|
$3.500
|
$5.000
|
$3.500
|
$3.530
|
$3.900
|
$4.000
|
$3.850
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,392.000
|
$1.300
|
$0.910
|
$1.000
|
$0.910
|
$1.000
|
$0.910
|
$1.000
|
$1.000
|
$2.780
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
424.000
|
$5.000
|
$5.770
|
$7.000
|
$5.770
|
$6.000
|
$5.770
|
$6.300
|
$4.000
|
$4.760
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
204.000
|
$6.000
|
$7.430
|
$9.000
|
$7.430
|
$8.000
|
$7.730
|
$8.200
|
$5.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
628.000
|
$0.900
|
$1.670
|
$2.000
|
$1.670
|
$2.000
|
$1.670
|
$1.800
|
$1.000
|
$1.080
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,680.000
|
$50.000
|
$22.550
|
$38.000
|
$18.000
|
$70.000
|
$85.000
|
$84.100
|
$12.000
|
$146.270
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,680.000
|
$8.000
|
$7.930
|
$10.000
|
$15.000
|
$15.000
|
$15.000
|
$13.400
|
$12.000
|
$15.400
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
11,892.000
|
$6.000
|
$4.070
|
$5.000
|
$3.000
|
$4.000
|
$7.500
|
$3.900
|
$8.000
|
$6.210
|
|
|
CONC CURB (DOWEL) (TY II)
|
LF
|
251.000
|
$7.000
|
$11.980
|
$9.000
|
$12.000
|
$25.000
|
$13.500
|
$10.700
|
$40.000
|
$8.400
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,165.000
|
$63.000
|
$69.180
|
$84.000
|
$80.000
|
$100.000
|
$110.000
|
$97.200
|
$130.000
|
$89.130
|
|
|
CONC SIDEWALKS (6")
|
SY
|
6,978.000
|
$78.000
|
$52.520
|
$56.000
|
$48.000
|
$75.000
|
$85.000
|
$73.200
|
$66.000
|
$187.040
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$2,000.000
|
$2,081.200
|
$3,000.000
|
$5,000.000
|
$3,500.000
|
$4,000.000
|
$1,936.000
|
$1,800.000
|
$1,556.750
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
$1,200.000
|
$1,300.000
|
$1,200.000
|
$990.000
|
$400.000
|
$1,116.030
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$24,000.000
|
$25,750.000
|
$25,750.000
|
$25,750.000
|
$27,000.000
|
$25,750.000
|
$35,000.000
|
$26,000.000
|
$26,716.890
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$2,000.000
|
$395.000
|
$395.000
|
$395.000
|
$1,500.000
|
$395.000
|
$435.000
|
$400.000
|
$439.610
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
1.000
|
$4,100.000
|
$5,900.000
|
$5,900.000
|
$5,900.000
|
$7,000.000
|
$5,900.000
|
$6,490.000
|
$6,000.000
|
$6,137.290
|
|
|
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
|
LF
|
1,675.000
|
$13.000
|
$19.750
|
$19.750
|
$19.750
|
$30.000
|
$19.750
|
$21.700
|
$20.000
|
$20.540
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
325.000
|
$10.000
|
$12.000
|
$12.000
|
$12.000
|
$16.000
|
$12.000
|
$13.200
|
$12.000
|
$12.480
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
225.000
|
$20.000
|
$29.000
|
$29.000
|
$29.000
|
$50.000
|
$29.000
|
$31.900
|
$30.000
|
$30.170
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
325.000
|
$1.500
|
$1.950
|
$1.950
|
$1.950
|
$2.300
|
$1.950
|
$2.100
|
$2.000
|
$2.030
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
650.000
|
$2.000
|
$2.100
|
$2.100
|
$2.100
|
$2.400
|
$2.100
|
$2.300
|
$2.200
|
$2.180
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$600.000
|
$600.000
|
$600.000
|
$600.000
|
$600.000
|
$600.000
|
$7,667.000
|
$750.000
|
$728.080
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$590.000
|
$1,760.000
|
$850.000
|
$850.000
|
$900.000
|
$850.000
|
$990.000
|
$920.000
|
$1,016.820
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$88.000
|
$85.000
|
$85.000
|
$85.000
|
$90.000
|
$85.000
|
$110.000
|
$85.000
|
$104.020
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
509.200
|
$5.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
$14.100
|
$6.000
|
$13.330
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
56.000
|
$28.000
|
$25.000
|
$25.000
|
$25.000
|
$30.000
|
$25.000
|
$33.000
|
$35.000
|
$33.380
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
56.000
|
$33.000
|
$20.000
|
$20.000
|
$20.000
|
$20.000
|
$20.000
|
$44.000
|
$10.000
|
$22.880
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
2,014.000
|
$1.500
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$0.400
|
$2.000
|
$1.560
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
1,033.000
|
$1.500
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$1.300
|
$2.000
|
$1.560
|
|
REFL PAV MRKR TY I-A
|
EA
|
21.000
|
$3.500
|
$10.000
|
$10.000
|
$10.000
|
$11.000
|
$10.000
|
$5.500
|
$10.000
|
$10.400
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
184.000
|
$4.000
|
$10.000
|
$10.000
|
$10.000
|
$11.000
|
$10.000
|
$5.200
|
$10.000
|
$6.240
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,531.000
|
$0.600
|
$0.750
|
$0.750
|
$0.750
|
$0.800
|
$0.750
|
$0.400
|
$0.800
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$55.000
|
$80.000
|
$80.000
|
$80.000
|
$80.000
|
$80.000
|
$77.000
|
$85.000
|
$67.610
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$55.000
|
$80.000
|
$80.000
|
$80.000
|
$80.000
|
$80.000
|
$110.000
|
$85.000
|
$67.610
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
7,178.000
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.160
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,227.000
|
$0.120
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.200
|
$0.210
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
428.000
|
$0.300
|
$0.500
|
$0.500
|
$0.500
|
$0.550
|
$0.500
|
$0.300
|
$0.500
|
$0.310
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$10.000
|
$22.000
|
$10.000
|
$26.010
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
826.000
|
$1.400
|
$1.250
|
$1.250
|
$1.250
|
$1.300
|
$1.250
|
$0.600
|
$1.300
|
$2.340
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
3,176.000
|
$1.000
|
$1.250
|
$1.250
|
$1.250
|
$1.300
|
$1.250
|
$0.600
|
$1.300
|
$2.340
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
491.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$1.100
|
$2.000
|
$3.170
|
|
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
|
LF
|
736.000
|
$1.500
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$1.100
|
$2.000
|
$3.170
|
|
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
|
LF
|
428.000
|
$4.000
|
$8.000
|
$8.000
|
$8.000
|
$8.000
|
$8.000
|
$3.300
|
$8.000
|
$6.240
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
3,176.000
|
$1.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$2.000
|
$0.700
|
$2.000
|
$2.760
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
2.000
|
$175.000
|
$350.000
|
$350.000
|
$350.000
|
$350.000
|
$350.000
|
$160.000
|
$350.000
|
$265.260
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$300.000
|
$185.910
|
$600.000
|
$50.000
|
$450.000
|
$300.000
|
$176.000
|
$250.000
|
$417.580
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
56.000
|
$75.000
|
$53.540
|
$300.000
|
$50.000
|
$200.000
|
$60.000
|
$71.000
|
$68.000
|
$41.750
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
1.000
|
$3,200.000
|
$3,625.000
|
$3,625.000
|
$3,625.000
|
$5,700.000
|
$3,625.000
|
$3,990.000
|
$3,700.000
|
$4,034.430
|
|
Totals: |
$7,368,740.090
|
$7,473,853.320
|
$7,729,703.650
|
$7,813,755.146
|
$8,110,890.050
|
$8,465,836.628
|
$8,832,072.520
|
$8,863,320.100
|
$10,686,324.056
|