PREPARING ROW
|
STA
|
4.000
|
$8,800.000
|
$55,000.000
|
$8,000.000
|
$7,000.000
|
$30,000.000
|
$68,525.000
|
$25,000.000
|
$23,300.000
|
$5,000.000
|
$77,000.000
|
$20,000.000
|
|
|
PREP ROW (TREE REMOVE) (12"-24" DIA)
|
EA
|
66.000
|
$480.000
|
$535.240
|
$1,200.000
|
$600.000
|
$200.000
|
$4,531.000
|
$1,250.000
|
$489.000
|
$1,000.000
|
$2,450.000
|
$950.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
361.000
|
$42.000
|
$22.390
|
$12.000
|
$20.000
|
$12.000
|
$6.770
|
$15.000
|
$27.500
|
$25.000
|
$18.760
|
$15.000
|
|
|
RMV (18"-22") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,537.000
|
$21.000
|
$32.560
|
$14.000
|
$22.000
|
$20.000
|
$9.970
|
$5.000
|
$11.350
|
$18.000
|
$24.430
|
$28.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
401.000
|
$34.000
|
$27.470
|
$50.000
|
$26.000
|
$35.000
|
$39.130
|
$45.000
|
$13.150
|
$22.500
|
$65.360
|
$25.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
552.000
|
$76.000
|
$9.160
|
$52.000
|
$26.000
|
$50.000
|
$17.680
|
$50.000
|
$20.700
|
$18.000
|
$34.370
|
$25.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
750.000
|
$33.000
|
$9.160
|
$55.000
|
$30.000
|
$45.000
|
$21.490
|
$60.000
|
$14.200
|
$40.000
|
$64.560
|
$55.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
425.000
|
$1.100
|
$3.990
|
$10.000
|
$3.000
|
$10.000
|
$10.000
|
$5.000
|
$17.100
|
$15.000
|
$2.000
|
$4.000
|
|
|
BLOCK SODDING
|
SY
|
425.000
|
$8.300
|
$6.610
|
$7.000
|
$6.000
|
$8.000
|
$6.500
|
$6.500
|
$7.220
|
$20.000
|
$7.500
|
$10.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
213.000
|
$0.250
|
$2.040
|
$2.000
|
$5.000
|
$4.000
|
$2.000
|
$2.000
|
$2.220
|
$2.500
|
$4.000
|
$5.000
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
213.000
|
$0.200
|
$2.040
|
$2.000
|
$5.000
|
$4.000
|
$2.000
|
$2.000
|
$2.220
|
$2.500
|
$4.000
|
$5.000
|
|
|
FERTILIZER
|
AC
|
0.090
|
$1,800.000
|
$1,221.090
|
$1,300.000
|
$5,600.000
|
$6,000.000
|
$1,200.000
|
$4,500.000
|
$1,335.000
|
$22,500.000
|
$4,000.000
|
$5,000.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
11.000
|
$680.000
|
$28.830
|
$175.000
|
$600.000
|
$32.000
|
$31.840
|
$120.000
|
$60.000
|
$10.000
|
$112.200
|
$150.000
|
|
|
PROOF ROLLING
|
HR
|
4.000
|
$240.000
|
$148.400
|
$400.000
|
$400.000
|
$70.000
|
$117.860
|
$50.000
|
$90.000
|
$100.000
|
$296.710
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (6")
|
SY
|
1,915.000
|
$15.000
|
$8.720
|
$28.000
|
$21.000
|
$27.000
|
$28.640
|
$46.000
|
$24.000
|
$48.000
|
$34.280
|
$40.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
474.000
|
$8.000
|
$6.610
|
$4.500
|
$7.000
|
$7.000
|
$11.710
|
$12.650
|
$16.000
|
$30.000
|
$11.000
|
$16.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
417.000
|
$160.000
|
$188.250
|
$165.000
|
$185.000
|
$120.000
|
$168.160
|
$181.700
|
$172.000
|
$325.000
|
$158.000
|
$320.000
|
|
|
D-GR HMA TY-C SAC-B PG70-22 (EXEMPT)
|
TON
|
206.000
|
$180.000
|
$208.600
|
$230.000
|
$205.000
|
$110.000
|
$201.150
|
$217.350
|
$258.000
|
$400.000
|
$189.000
|
$350.000
|
|
|
TACK COAT
|
GAL
|
113.000
|
$5.000
|
$5.090
|
$6.000
|
$5.000
|
$3.000
|
$15.960
|
$17.250
|
$6.000
|
$25.000
|
$15.000
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
387.000
|
$81.000
|
$43.430
|
$120.000
|
$75.000
|
$65.000
|
$66.640
|
$70.000
|
$171.000
|
$275.000
|
$94.030
|
$100.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
387.000
|
$54.000
|
$8.660
|
$1.000
|
$5.000
|
$1.000
|
$9.100
|
$2.000
|
$13.500
|
$25.000
|
$2.020
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
480.000
|
$18.000
|
$44.770
|
$40.000
|
$85.000
|
$5.000
|
$61.490
|
$5.000
|
$96.450
|
$35.000
|
$48.170
|
$40.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,260.000
|
$330.000
|
$264.620
|
$275.000
|
$340.000
|
$370.000
|
$209.110
|
$390.000
|
$341.600
|
$305.000
|
$245.630
|
$350.000
|
|
|
CL C CONC (ABUT)
|
CY
|
79.600
|
$1,200.000
|
$1,534.020
|
$1,800.000
|
$2,100.000
|
$2,000.000
|
$905.710
|
$1,800.000
|
$1,297.000
|
$1,250.000
|
$1,800.000
|
$2,000.000
|
|
|
CL C CONC (MISC)
|
CY
|
15.000
|
$1,300.000
|
$1,427.510
|
$2,000.000
|
$1,400.000
|
$700.000
|
$729.570
|
$600.000
|
$2,068.000
|
$1,500.000
|
$1,400.000
|
$1,200.000
|
|
|
REINF CONC SLAB
|
SF
|
7,150.000
|
$23.000
|
$23.590
|
$30.000
|
$33.000
|
$28.000
|
$27.520
|
$36.000
|
$36.850
|
$33.500
|
$37.000
|
$35.000
|
|
|
APPROACH SLAB
|
CY
|
116.000
|
$2,000.000
|
$682.130
|
$755.000
|
$950.000
|
$850.000
|
$500.280
|
$950.000
|
$806.000
|
$850.000
|
$1,400.000
|
$650.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,094.500
|
$270.000
|
$208.710
|
$231.000
|
$235.000
|
$200.000
|
$228.330
|
$290.000
|
$233.500
|
$250.000
|
$245.660
|
$250.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
172.000
|
$660.000
|
$479.960
|
$620.000
|
$620.000
|
$600.000
|
$402.440
|
$500.000
|
$576.000
|
$600.000
|
$576.580
|
$500.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
182.000
|
$450.000
|
$420.530
|
$620.000
|
$600.000
|
$650.000
|
$482.040
|
$500.000
|
$671.000
|
$550.000
|
$551.330
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
14.000
|
$640.000
|
$790.380
|
$1,900.000
|
$605.000
|
$900.000
|
$483.690
|
$600.000
|
$3,067.000
|
$825.000
|
$1,211.710
|
$500.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
121.000
|
$700.000
|
$149.670
|
$258.000
|
$270.000
|
$150.000
|
$197.650
|
$180.000
|
$245.800
|
$250.000
|
$243.810
|
$250.000
|
|
|
RAIL (TY T223)
|
LF
|
355.000
|
$180.000
|
$154.870
|
$190.000
|
$180.000
|
$160.000
|
$123.410
|
$160.000
|
$198.450
|
$175.000
|
$216.530
|
$165.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
141.000
|
$230.000
|
$192.320
|
$255.000
|
$230.000
|
$250.000
|
$230.570
|
$190.000
|
$260.000
|
$225.000
|
$331.790
|
$210.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
387.000
|
$130.000
|
$82.630
|
$110.000
|
$100.000
|
$140.000
|
$131.800
|
$120.000
|
$134.700
|
$135.000
|
$118.300
|
$100.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$6,300.000
|
$13,737.260
|
$100.000
|
$5,600.000
|
$10.000
|
$1.100
|
$9,000.000
|
$5,642.000
|
$4,500.000
|
$3,676.650
|
$0.010
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$8,400.000
|
$15,772.410
|
$100.000
|
$7,550.000
|
$10.000
|
$1.100
|
$12,000.000
|
$7,081.000
|
$6,500.000
|
$5,923.940
|
$0.010
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$5,800.000
|
$11,193.330
|
$14,000.000
|
$6,700.000
|
$15,000.000
|
$4,916.490
|
$8,000.000
|
$5,106.000
|
$8,000.000
|
$5,917.730
|
$7,500.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$7,100.000
|
$15,263.630
|
$15,000.000
|
$6,050.000
|
$20,000.000
|
$6,162.760
|
$9,000.000
|
$6,356.000
|
$8,000.000
|
$5,172.770
|
$7,500.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$660.000
|
$890.380
|
$800.000
|
$650.000
|
$880.000
|
$584.920
|
$300.000
|
$750.000
|
$750.000
|
$1,441.950
|
$150.000
|
|
|
REMOV STR (PIPE)
|
LF
|
54.000
|
$44.000
|
$71.230
|
$68.000
|
$50.000
|
$65.000
|
$17.590
|
$10.000
|
$35.000
|
$100.000
|
$43.000
|
$25.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$39,000.000
|
$56,729.810
|
$92,000.000
|
$80,000.000
|
$120,000.000
|
$25,115.060
|
$80,000.000
|
$67,975.000
|
$50,000.000
|
$135,000.000
|
$350,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$251,206.640
|
$240,000.000
|
$220,000.000
|
$250,000.000
|
$270,000.000
|
$270,196.000
|
$255,000.000
|
$269,000.000
|
$250,000.000
|
$300,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$10,000.000
|
$5,306.650
|
$2,900.000
|
$1,700.000
|
$3,500.000
|
$3,424.030
|
$2,000.000
|
$4,000.000
|
$2,000.000
|
$3,494.150
|
$3,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$14,754.840
|
$9,000.000
|
$14,500.000
|
$12,000.000
|
$17,646.310
|
$2,500.000
|
$15,000.000
|
$15,000.000
|
$17,984.470
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$570.000
|
$223.870
|
$167.000
|
$260.000
|
$300.000
|
$77.750
|
$240.000
|
$550.000
|
$250.000
|
$468.600
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$57.000
|
$101.760
|
$34.000
|
$120.000
|
$85.000
|
$453.960
|
$600.000
|
$90.000
|
$90.000
|
$82.070
|
$100.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
123.000
|
$70.000
|
$76.320
|
$82.000
|
$120.000
|
$35.000
|
$75.000
|
$75.000
|
$83.300
|
$50.000
|
$32.000
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
123.000
|
$7.800
|
$20.350
|
$22.000
|
$40.000
|
$5.000
|
$20.000
|
$20.000
|
$20.000
|
$10.000
|
$15.000
|
$10.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
245.000
|
$6.400
|
$6.110
|
$3.000
|
$15.000
|
$12.000
|
$6.000
|
$6.000
|
$6.700
|
$12.000
|
$5.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,080.000
|
$3.700
|
$5.600
|
$6.000
|
$8.000
|
$3.500
|
$5.500
|
$5.500
|
$6.000
|
$3.750
|
$2.500
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,080.000
|
$1.700
|
$1.530
|
$1.700
|
$3.000
|
$0.500
|
$1.500
|
$1.500
|
$1.700
|
$1.500
|
$1.000
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
187.000
|
$130.000
|
$175.020
|
$55.000
|
$250.000
|
$170.000
|
$199.920
|
$148.350
|
$240.640
|
$250.000
|
$193.370
|
$225.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
960.000
|
$130.000
|
$22.050
|
$90.000
|
$72.000
|
$80.000
|
$104.180
|
$25.000
|
$36.500
|
$100.000
|
$16.640
|
$100.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
840.000
|
$36.000
|
$11.870
|
$13.000
|
$13.000
|
$6.000
|
$27.080
|
$7.500
|
$9.400
|
$27.000
|
$13.500
|
$25.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
960.000
|
$15.000
|
$22.050
|
$21.000
|
$13.000
|
$12.000
|
$16.270
|
$20.000
|
$18.900
|
$35.000
|
$15.500
|
$15.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
95.000
|
$25.000
|
$129.230
|
$140.000
|
$130.000
|
$140.000
|
$128.390
|
$54.050
|
$87.250
|
$225.000
|
$142.100
|
$85.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$50.000
|
$36.510
|
$38.000
|
$36.000
|
$36.000
|
$36.500
|
$36.000
|
$41.000
|
$40.000
|
$36.500
|
$38.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,400.000
|
$2,335.330
|
$2,500.000
|
$2,300.000
|
$2,300.000
|
$2,850.000
|
$2,295.000
|
$3,446.000
|
$2,500.000
|
$2,850.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$1,512.120
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$1,650.000
|
$1,486.000
|
$1,833.000
|
$2,250.000
|
$1,650.000
|
$1,800.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,100.000
|
$789.640
|
$1,500.000
|
$800.000
|
$800.000
|
$1,100.000
|
$776.000
|
$1,225.000
|
$1,800.000
|
$1,100.000
|
$1,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,300.000
|
$3,331.540
|
$3,400.000
|
$3,300.000
|
$3,300.000
|
$3,375.000
|
$3,274.000
|
$3,750.000
|
$4,000.000
|
$3,375.000
|
$3,600.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$4,100.000
|
$2,696.570
|
$1,800.000
|
$2,700.000
|
$3,200.000
|
$1,250.000
|
$2,650.000
|
$2,720.000
|
$2,500.000
|
$1,250.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,100.000
|
$1,882.510
|
$900.000
|
$1,900.000
|
$2,000.000
|
$900.000
|
$1,850.000
|
$1,000.000
|
$1,000.000
|
$900.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$20,000.000
|
$26,813.100
|
$34,000.000
|
$27,000.000
|
$30,000.000
|
$28,500.000
|
$26,350.000
|
$33,000.000
|
$34,000.000
|
$28,500.000
|
$29,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$9,800.000
|
$9,412.570
|
$9,500.000
|
$9,300.000
|
$11,000.000
|
$8,500.000
|
$9,250.000
|
$10,800.000
|
$10,000.000
|
$8,500.000
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$170.000
|
$340.890
|
$375.000
|
$350.000
|
$350.000
|
$500.000
|
$335.000
|
$556.000
|
$750.000
|
$500.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$620.000
|
$639.550
|
$704.000
|
$650.000
|
$630.000
|
$750.000
|
$628.500
|
$833.000
|
$1,200.000
|
$750.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
2.000
|
$5,800.000
|
$5,589.030
|
$6,200.000
|
$5,500.000
|
$5,500.000
|
$4,800.000
|
$5,492.500
|
$5,333.000
|
$5,000.000
|
$4,800.000
|
$5,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$160.000
|
$96.670
|
$106.000
|
$100.000
|
$100.000
|
$115.000
|
$95.000
|
$128.000
|
$250.000
|
$115.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
12.000
|
$15.000
|
$12.210
|
$58.000
|
$12.000
|
$12.000
|
$25.000
|
$12.000
|
$28.000
|
$50.000
|
$25.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
5.000
|
$15.000
|
$21.370
|
$38.000
|
$22.000
|
$21.000
|
$35.000
|
$21.000
|
$39.000
|
$50.000
|
$35.000
|
$40.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
4,912.000
|
$1.000
|
$0.690
|
$0.750
|
$0.700
|
$1.200
|
$1.430
|
$0.680
|
$1.300
|
$0.850
|
$1.170
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
9,162.000
|
$1.000
|
$0.690
|
$0.750
|
$0.700
|
$1.200
|
$1.430
|
$0.680
|
$1.300
|
$0.850
|
$1.170
|
$1.500
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
2,837.000
|
$1.100
|
$0.610
|
$0.750
|
$0.600
|
$0.850
|
$0.920
|
$0.600
|
$0.830
|
$0.750
|
$0.750
|
$1.100
|
|
RE PM TY II (Y) 6" (BRK)
|
LF
|
330.000
|
$1.100
|
$1.020
|
$1.000
|
$1.000
|
$1.400
|
$0.920
|
$1.000
|
$0.830
|
$1.250
|
$0.750
|
$1.100
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
2,008.000
|
$0.960
|
$0.610
|
$0.750
|
$0.600
|
$0.850
|
$0.920
|
$0.600
|
$0.830
|
$1.250
|
$0.750
|
$1.100
|
|
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
|
LF
|
2,837.000
|
$0.710
|
$0.970
|
$1.000
|
$1.000
|
$1.350
|
$2.760
|
$0.950
|
$2.500
|
$1.250
|
$2.250
|
$3.000
|
|
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
|
LF
|
2,008.000
|
$0.710
|
$0.970
|
$1.000
|
$1.000
|
$1.350
|
$2.760
|
$0.950
|
$2.500
|
$1.250
|
$2.250
|
$3.000
|
|
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
|
LF
|
330.000
|
$0.710
|
$1.530
|
$2.000
|
$1.500
|
$3.620
|
$2.760
|
$1.500
|
$2.500
|
$2.000
|
$2.250
|
$3.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
43.000
|
$7.800
|
$7.120
|
$8.000
|
$7.000
|
$10.000
|
$7.350
|
$7.000
|
$7.000
|
$9.000
|
$6.000
|
$7.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
6,697.000
|
$0.310
|
$0.390
|
$0.420
|
$0.400
|
$0.550
|
$0.600
|
$0.380
|
$0.540
|
$0.550
|
$0.490
|
$0.700
|
|
Totals: |
$2,863,272.990
|
$2,474,861.625
|
$2,669,028.490
|
$2,745,049.100
|
$2,759,693.750
|
$2,785,095.701
|
$2,859,549.480
|
$2,860,966.430
|
$2,930,754.250
|
$3,218,275.970
|
$3,276,069.420
|