|
|
BACKFILL (TY A)
|
STA
|
557.000
|
$550.000
|
$268.000
|
$566.240
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
75,877.000
|
$5.000
|
$3.000
|
$4.080
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
1,824.000
|
$180.000
|
$125.000
|
$170.130
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
|
SY
|
5,573.000
|
$80.000
|
$93.500
|
$116.880
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
253,633.000
|
$2.000
|
$3.200
|
$3.440
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$724,908.980
|
$100,000.000
|
$435,650.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$5,000.000
|
$1,000.000
|
$1,724.330
|
|
|
INTERSECTIONS (ACP)
|
SY
|
3,736.000
|
$25.000
|
$23.500
|
$27.950
|
|
|
DRIVEWAYS (ACP)
|
SY
|
12,782.000
|
$25.000
|
$24.000
|
$26.140
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
22,069.000
|
$0.150
|
$0.400
|
$0.530
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
72.000
|
$20.000
|
$24.000
|
$25.290
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
66.000
|
$450.000
|
$495.000
|
$534.540
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
57.000
|
$600.000
|
$670.000
|
$724.220
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$800.000
|
$803.000
|
$879.410
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
133.000
|
$100.000
|
$64.000
|
$68.970
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
300.000
|
$0.250
|
$0.270
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
324,690.000
|
$0.200
|
$0.270
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
10,881.000
|
$0.350
|
$0.370
|
$0.570
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
696.000
|
$1.000
|
$1.000
|
$2.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
1,992.000
|
$2.000
|
$2.000
|
$4.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
96.000
|
$50.000
|
$59.000
|
$80.470
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
78.000
|
$50.000
|
$59.000
|
$80.470
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
23,640.000
|
$0.250
|
$0.270
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
228,030.000
|
$0.250
|
$0.270
|
$0.320
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,387.000
|
$1.000
|
$1.150
|
$1.030
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
232.000
|
$2.500
|
$3.000
|
$3.450
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
664.000
|
$5.000
|
$6.000
|
$6.900
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
100.000
|
$0.500
|
$0.580
|
$0.670
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
105,940.000
|
$0.450
|
$0.540
|
$0.670
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,880.000
|
$0.450
|
$0.580
|
$0.670
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
72,480.000
|
$0.500
|
$0.580
|
$0.670
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
31.000
|
$200.000
|
$212.000
|
$258.650
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
25.000
|
$230.000
|
$318.000
|
$339.120
|
|
REFL PAV MRKR TY I-C
|
EA
|
179.000
|
$4.000
|
$3.500
|
$5.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,488.000
|
$4.000
|
$3.500
|
$5.750
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
192,290.000
|
$0.020
|
$0.020
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,627.000
|
$0.040
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
232.000
|
$0.060
|
$0.020
|
$0.570
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
664.000
|
$0.200
|
$0.020
|
$1.150
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
32.000
|
$5.000
|
$5.250
|
$11.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
26.000
|
$7.000
|
$5.250
|
$11.500
|
|
|
HIGH FRICTION SURFACE COURSE
|
SY
|
33,935.000
|
$25.000
|
$23.000
|
$31.480
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
26,083.000
|
$135.000
|
$128.000
|
$130.420
|
|
|
TACK COAT
|
GAL
|
26,083.000
|
$3.000
|
$0.010
|
$4.020
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
98.000
|
$80.000
|
$350.000
|
$94.080
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
2,360.000
|
$0.450
|
$1.860
|
$1.150
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
240.000
|
$1.000
|
$5.310
|
$2.300
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
3,530.000
|
$0.500
|
$1.860
|
$1.150
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
1.000
|
$80.000
|
$276.000
|
$574.780
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
1.000
|
$250.000
|
$276.000
|
$574.580
|
|
|
TMA (STATIONARY)
|
DAY
|
35.000
|
$250.000
|
$638.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
64.000
|
$100.000
|
$86.000
|
$28.740
|
|
Totals: |
$7,973,998.780
|
$7,041,940.210
|
$8,444,203.290
|