PREPARING ROW
|
STA
|
71.000
|
$5,000.000
|
$2,040.000
|
$100.000
|
$116.720
|
$1,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
780.000
|
$45.000
|
$9.150
|
$16.000
|
$3.510
|
$55.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,556.000
|
$10.000
|
$62.710
|
$6.250
|
$16.440
|
$45.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
85.000
|
$18.500
|
$56.000
|
$13.250
|
$36.290
|
$40.000
|
|
|
BACKFILL (TY A)
|
STA
|
745.000
|
$210.000
|
$660.000
|
$800.000
|
$763.720
|
$700.000
|
|
|
BLOCK SODDING
|
SY
|
21,355.000
|
$4.800
|
$4.400
|
$4.900
|
$6.740
|
$4.000
|
|
|
FERTILIZER
|
AC
|
4.400
|
$1,150.000
|
$850.000
|
$1,000.000
|
$1,405.750
|
$1,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
530.000
|
$21.750
|
$84.000
|
$20.600
|
$35.100
|
$40.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
4,274.000
|
$6.500
|
$11.750
|
$22.500
|
$9.040
|
$15.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
30.000
|
$220.000
|
$304.500
|
$431.000
|
$340.890
|
$500.000
|
|
|
CEMENT
|
TON
|
30.000
|
$320.000
|
$324.500
|
$247.000
|
$392.860
|
$500.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
4,274.000
|
$4.000
|
$6.500
|
$14.000
|
$9.040
|
$15.000
|
|
|
ASPHALT STAB BASE (GR 2)(PG 64)
|
TON
|
4,654.000
|
$127.800
|
$106.850
|
$106.000
|
$96.560
|
$120.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (4 TO 6")
|
SY
|
780.000
|
$15.000
|
$8.000
|
$90.000
|
$17.560
|
$16.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
99,432.000
|
$4.250
|
$4.400
|
$4.900
|
$4.910
|
$4.500
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
2,390.000
|
$135.000
|
$173.650
|
$150.150
|
$185.660
|
$190.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
15,296.000
|
$40.000
|
$65.310
|
$70.000
|
$74.000
|
$40.000
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
4,397.000
|
$6.750
|
$6.850
|
$9.500
|
$3.880
|
$4.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
335,822.000
|
$3.000
|
$3.170
|
$2.350
|
$2.630
|
$3.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,162,857.250
|
$409,000.000
|
$565,000.000
|
$562,695.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$6,000.000
|
$1,021.670
|
$30,000.000
|
$29,859.900
|
$4,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,253.000
|
$2.500
|
$2.550
|
$3.760
|
$3.920
|
$2.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,253.000
|
$0.500
|
$1.100
|
$0.830
|
$1.170
|
$1.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
7,586.000
|
$50.000
|
$23.650
|
$20.000
|
$22.720
|
$35.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
17,508.000
|
$35.000
|
$20.000
|
$20.250
|
$21.410
|
$35.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
5.000
|
$265.000
|
$305.000
|
$305.000
|
$357.290
|
$375.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
144.000
|
$35.000
|
$24.500
|
$24.500
|
$28.700
|
$27.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
82.600
|
$30.000
|
$45.000
|
$42.000
|
$52.720
|
$28.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
84.000
|
$700.000
|
$430.000
|
$430.000
|
$503.730
|
$475.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
63.000
|
$800.000
|
$600.000
|
$600.000
|
$702.870
|
$720.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$800.000
|
$695.000
|
$695.000
|
$814.160
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
2.000
|
$2,100.000
|
$1,075.000
|
$1,075.000
|
$1,259.310
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
12.000
|
$1,000.000
|
$805.000
|
$805.000
|
$943.020
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$1,025.000
|
$1,100.000
|
$1,100.000
|
$1,288.600
|
$1,400.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
146.000
|
$105.000
|
$60.000
|
$60.000
|
$70.290
|
$100.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
1.000
|
$150.000
|
$45.000
|
$45.000
|
$52.720
|
$150.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
5,433.000
|
$0.300
|
$0.290
|
$0.290
|
$0.340
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
451,995.000
|
$0.300
|
$0.290
|
$0.290
|
$0.340
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
31,167.000
|
$0.500
|
$0.330
|
$0.330
|
$0.390
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
1,230.000
|
$3.000
|
$2.000
|
$2.000
|
$2.340
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
3,798.000
|
$3.000
|
$4.000
|
$4.000
|
$4.690
|
$4.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
198.000
|
$80.000
|
$85.000
|
$85.000
|
$99.570
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
180.000
|
$83.000
|
$85.000
|
$85.000
|
$99.570
|
$85.000
|
|
|
WK ZN PV MK NON-REM (Y)(4")BKN W/MRKR
|
LF
|
37,383.000
|
$1.500
|
$0.550
|
$0.550
|
$0.640
|
$0.550
|
|
|
WK ZN PV MK NON-REM (Y)(4")SLD W/MRKR
|
LF
|
366,483.000
|
$1.500
|
$0.550
|
$0.550
|
$0.640
|
$0.550
|
|
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
|
LF
|
409.000
|
$2.000
|
$1.250
|
$1.250
|
$1.460
|
$1.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
10,389.000
|
$1.200
|
$0.950
|
$0.950
|
$1.110
|
$0.950
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,266.000
|
$7.000
|
$6.000
|
$6.000
|
$7.030
|
$6.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
11,050.000
|
$5.900
|
$6.000
|
$6.000
|
$7.030
|
$6.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
8,805.000
|
$0.160
|
$0.250
|
$0.250
|
$0.290
|
$0.250
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,811.000
|
$0.600
|
$0.590
|
$0.590
|
$0.690
|
$0.590
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
150,665.000
|
$0.500
|
$0.500
|
$0.500
|
$0.590
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
12,461.000
|
$0.500
|
$0.500
|
$0.500
|
$0.590
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
122,161.000
|
$0.500
|
$0.500
|
$0.500
|
$0.590
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
66.000
|
$225.000
|
$220.000
|
$220.000
|
$257.720
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
60.000
|
$250.000
|
$250.000
|
$250.000
|
$292.860
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
533.000
|
$5.000
|
$5.000
|
$5.000
|
$5.860
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4,141.000
|
$4.500
|
$5.000
|
$5.000
|
$5.860
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
294,092.000
|
$0.050
|
$0.050
|
$0.050
|
$0.060
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
10,798.000
|
$0.150
|
$0.100
|
$0.100
|
$0.120
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
12,316.000
|
$1.000
|
$1.000
|
$1.000
|
$1.170
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
66.000
|
$22.000
|
$10.000
|
$10.000
|
$11.710
|
$10.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
60.000
|
$20.000
|
$10.000
|
$10.000
|
$11.710
|
$10.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
34,201.000
|
$107.000
|
$125.000
|
$134.000
|
$126.000
|
$155.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
936.000
|
$140.000
|
$144.080
|
$180.000
|
$178.560
|
$155.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
110.000
|
$130.000
|
$115.000
|
$169.000
|
$95.870
|
$100.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
722.000
|
$1.250
|
$10.500
|
$10.000
|
$11.710
|
$10.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
|
LF
|
90.000
|
$1.000
|
$10.500
|
$10.000
|
$11.710
|
$10.000
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$250.000
|
$406.000
|
$228.000
|
$301.860
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
56.000
|
$75.000
|
$83.000
|
$58.000
|
$29.290
|
$50.000
|
|
Totals: |
$11,121,060.100
|
$10,866,955.640
|
$11,286,697.690
|
$11,288,518.162
|
$12,193,971.640
|