REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,800.000
|
$5.500
|
$4.600
|
$4.750
|
$8.000
|
$3.720
|
$30.000
|
|
|
BACKFILL (TY A)
|
STA
|
309.000
|
$150.000
|
$200.000
|
$140.000
|
$150.000
|
$162.000
|
$300.000
|
|
|
BLOCK SODDING
|
SY
|
9,653.000
|
$3.000
|
$3.320
|
$3.300
|
$4.000
|
$4.240
|
$4.000
|
|
|
FERTILIZER
|
AC
|
1.990
|
$800.500
|
$765.000
|
$775.000
|
$850.000
|
$924.000
|
$700.000
|
|
|
VEGETATIVE WATERING
|
MG
|
239.000
|
$20.000
|
$97.520
|
$15.000
|
$40.000
|
$21.200
|
$20.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
16,724.000
|
$80.000
|
$78.000
|
$87.850
|
$89.500
|
$96.000
|
$97.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
710.000
|
$25.000
|
$60.550
|
$35.500
|
$63.000
|
$98.000
|
$50.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
21,365.000
|
$1.200
|
$5.000
|
$1.500
|
$5.000
|
$5.330
|
$6.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
187.000
|
$500.000
|
$500.000
|
$600.000
|
$435.000
|
$542.400
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$254,238.000
|
$220,000.000
|
$210,000.000
|
$100,000.000
|
$161,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$5,000.000
|
$20,000.000
|
$650.000
|
$15,000.000
|
$1,371.000
|
$3,300.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,000.000
|
$1.000
|
$2.060
|
$2.500
|
$2.500
|
$2.440
|
$2.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,000.000
|
$1.000
|
$1.060
|
$1.000
|
$1.000
|
$0.810
|
$1.500
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,864.000
|
$25.000
|
$12.000
|
$18.500
|
$15.000
|
$26.500
|
$35.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
13,653.000
|
$25.000
|
$12.000
|
$22.000
|
$20.000
|
$16.450
|
$36.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,800.000
|
$20.000
|
$21.170
|
$21.000
|
$19.500
|
$22.550
|
$27.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,400.000
|
$3.100
|
$2.040
|
$2.150
|
$2.000
|
$2.170
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$2,500.000
|
$2,596.920
|
$2,575.000
|
$2,500.000
|
$2,766.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$250.000
|
$153.000
|
$200.000
|
$300.000
|
$163.000
|
$375.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
81.000
|
$650.000
|
$344.760
|
$350.000
|
$365.000
|
$367.000
|
$470.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
19.000
|
$800.000
|
$531.420
|
$550.000
|
$520.000
|
$566.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$80.000
|
$646.680
|
$650.000
|
$645.000
|
$690.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
102.000
|
$3.000
|
$51.000
|
$52.000
|
$40.000
|
$55.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
33.000
|
$30.000
|
$35.700
|
$36.000
|
$25.000
|
$38.000
|
$40.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
490.000
|
$0.190
|
$0.310
|
$0.350
|
$0.200
|
$0.330
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
61,903.000
|
$0.170
|
$0.100
|
$0.100
|
$0.200
|
$0.110
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,219.000
|
$0.450
|
$0.310
|
$0.350
|
$0.300
|
$0.330
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
369.000
|
$2.250
|
$1.020
|
$1.000
|
$1.000
|
$1.090
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
23.000
|
$45.000
|
$40.800
|
$45.000
|
$80.000
|
$43.500
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
23.000
|
$70.000
|
$66.300
|
$70.000
|
$50.000
|
$71.000
|
$40.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
7,400.000
|
$0.150
|
$0.200
|
$0.250
|
$0.200
|
$0.220
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
110,662.000
|
$0.150
|
$0.100
|
$0.100
|
$0.200
|
$0.110
|
$0.130
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,219.000
|
$0.450
|
$0.710
|
$0.750
|
$0.800
|
$0.760
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
399.000
|
$2.250
|
$5.100
|
$5.250
|
$0.600
|
$5.430
|
$0.350
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
380.000
|
$0.700
|
$2.040
|
$2.100
|
$1.000
|
$2.170
|
$0.350
|
|
|
PAVEMENT SEALER 6"
|
LF
|
6,616.000
|
$0.120
|
$0.100
|
$0.150
|
$0.140
|
$0.110
|
$0.100
|
|
|
PAVEMENT SEALER 8"
|
LF
|
363.000
|
$0.170
|
$0.150
|
$0.200
|
$0.250
|
$0.160
|
$0.150
|
|
|
PAVEMENT SEALER 24"
|
LF
|
151.000
|
$1.260
|
$0.510
|
$0.600
|
$0.800
|
$0.540
|
$0.240
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
9.000
|
$26.500
|
$10.200
|
$10.500
|
$25.000
|
$10.860
|
$5.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
9.000
|
$26.330
|
$10.200
|
$10.500
|
$25.000
|
$10.860
|
$7.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
380.000
|
$0.450
|
$0.510
|
$0.600
|
$0.440
|
$0.540
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
61,903.000
|
$0.550
|
$0.410
|
$0.450
|
$0.440
|
$0.430
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,040.000
|
$0.500
|
$0.410
|
$0.450
|
$0.440
|
$0.430
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
31,471.000
|
$0.500
|
$0.410
|
$0.450
|
$0.440
|
$0.430
|
$0.350
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
1,660.000
|
$0.950
|
$1.020
|
$1.100
|
$0.750
|
$1.090
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
23,860.000
|
$0.900
|
$0.660
|
$0.750
|
$0.750
|
$0.710
|
$0.750
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
27.000
|
$250.000
|
$163.200
|
$175.000
|
$275.000
|
$174.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
27.000
|
$300.000
|
$244.800
|
$250.000
|
$275.000
|
$261.000
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
85.000
|
$3.910
|
$3.060
|
$3.250
|
$4.000
|
$3.260
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,674.000
|
$3.100
|
$2.550
|
$2.750
|
$4.000
|
$2.720
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
14.000
|
$3.910
|
$3.060
|
$3.250
|
$4.000
|
$3.260
|
$8.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
308,385.000
|
$0.030
|
$0.010
|
$0.010
|
$0.020
|
$0.010
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,591.000
|
$0.050
|
$0.040
|
$0.040
|
$0.040
|
$0.040
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
949.000
|
$0.300
|
$0.100
|
$0.110
|
$0.100
|
$0.110
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
47.000
|
$15.000
|
$10.200
|
$10.500
|
$5.000
|
$10.860
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
47.000
|
$8.000
|
$10.200
|
$10.500
|
$5.000
|
$10.860
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
620.000
|
$45.000
|
$35.000
|
$75.000
|
$50.000
|
$109.000
|
$80.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
2,419.000
|
$0.500
|
$0.660
|
$0.750
|
$0.900
|
$0.710
|
$0.800
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
470.000
|
$0.750
|
$1.020
|
$1.100
|
$0.950
|
$1.090
|
$1.500
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
363.000
|
$1.000
|
$2.040
|
$2.150
|
$1.600
|
$2.170
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
151.000
|
$9.000
|
$6.120
|
$6.500
|
$9.000
|
$6.520
|
$7.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
3,257.000
|
$0.500
|
$0.660
|
$0.750
|
$0.900
|
$0.710
|
$0.800
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
470.000
|
$0.750
|
$2.040
|
$2.150
|
$1.100
|
$2.170
|
$1.500
|
|
|
TMA (STATIONARY)
|
DAY
|
4.000
|
$100.000
|
$787.780
|
$525.000
|
$223.000
|
$174.000
|
$1,500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
240.000
|
$16.000
|
$20.000
|
$35.000
|
$58.000
|
$51.400
|
$125.000
|
|
Totals: |
$2,607,384.805
|
$2,483,807.000
|
$2,623,431.180
|
$2,668,260.890
|
$2,822,056.030
|
$3,382,409.460
|