|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
50.000
|
$50.000
|
$60.000
|
$83.250
|
$100.000
|
|
|
REMOVING STAB BASE & ASPH PAV (18")
|
SY
|
4,028.000
|
$25.000
|
$9.500
|
$50.000
|
$25.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (5"-8")
|
SY
|
1,094.000
|
$20.000
|
$15.000
|
$21.150
|
$25.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
1,094.000
|
$25.000
|
$2.500
|
$11.000
|
$24.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
26.000
|
$1,500.000
|
$2,200.000
|
$2,500.000
|
$5,000.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
3.000
|
$200.000
|
$100.000
|
$400.000
|
$1,500.000
|
|
|
BACKFILL (TY A)
|
STA
|
22.000
|
$250.000
|
$440.000
|
$455.000
|
$5,000.100
|
|
|
BLADING
|
HR
|
26.000
|
$420.000
|
$160.000
|
$590.000
|
$250.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
5.000
|
$700.000
|
$1,173.000
|
$940.000
|
$1,000.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
3.000
|
$600.000
|
$1,759.550
|
$985.000
|
$1,000.000
|
|
|
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
|
SY
|
7,388.000
|
$48.000
|
$35.000
|
$41.000
|
$60.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,848.000
|
$10.000
|
$16.000
|
$8.000
|
$10.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
160.000
|
$360.000
|
$302.500
|
$440.000
|
$450.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
2.000
|
$1,500.000
|
$1,600.000
|
$2,550.000
|
$5,000.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
125.000
|
$153.000
|
$100.000
|
$100.000
|
$210.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
312.000
|
$150.000
|
$130.000
|
$150.000
|
$210.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$4,374.000
|
$3,750.000
|
$5,600.000
|
$10,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,000.000
|
$3,300.000
|
$5,400.000
|
$10,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$3,713.000
|
$2,200.000
|
$6,500.000
|
$7,500.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$950.000
|
$700.000
|
$1,800.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
227.000
|
$55.000
|
$32.000
|
$65.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$175,000.000
|
$223,107.500
|
$275,000.000
|
$343,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$14,000.000
|
$3,310.000
|
$20,000.000
|
$64,975.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
300.000
|
$7.000
|
$2.550
|
$17.500
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
300.000
|
$2.000
|
$1.100
|
$7.500
|
$5.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
50.000
|
$200.000
|
$158.000
|
$95.000
|
$150.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
402.000
|
$152.000
|
$68.000
|
$145.000
|
$150.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$1,000.000
|
$1,100.000
|
$1,670.000
|
$2,000.000
|
|
|
IN RD IL (TY ST) 50T-12-12(400W EQ)LED
|
EA
|
20.000
|
$8,700.000
|
$8,250.000
|
$7,200.000
|
$7,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
4,525.000
|
$20.000
|
$16.500
|
$25.600
|
$30.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
835.000
|
$35.000
|
$27.500
|
$35.650
|
$35.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
5,600.000
|
$2.000
|
$2.470
|
$2.400
|
$3.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
11,200.000
|
$2.200
|
$2.750
|
$2.850
|
$3.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
2.000
|
$2,000.000
|
$1,375.000
|
$1,925.000
|
$2,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$225.000
|
$412.500
|
$1,100.000
|
$1,000.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$11,000.000
|
$8,250.000
|
$9,375.000
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$1,000.000
|
$1,045.000
|
$1,045.000
|
$975.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$1,000.000
|
$1,089.000
|
$1,100.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
6.000
|
$1,200.000
|
$1,430.000
|
$1,360.000
|
$1,275.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,200.000
|
$1,650.000
|
$1,645.000
|
$1,525.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$140.000
|
$110.000
|
$250.000
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
34.000
|
$17.000
|
$27.500
|
$125.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
100.000
|
$150.000
|
$132.000
|
$170.000
|
$122.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
2,930.000
|
$0.800
|
$1.150
|
$1.200
|
$1.050
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
5,153.000
|
$0.800
|
$1.150
|
$1.200
|
$1.050
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,623.000
|
$2.000
|
$1.650
|
$1.700
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
114.000
|
$11.000
|
$16.500
|
$16.700
|
$15.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
6.000
|
$300.000
|
$330.000
|
$335.000
|
$300.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
6.000
|
$300.000
|
$440.000
|
$445.000
|
$400.000
|
|
REFL PAV MRK TY I (W)(RR XING)(090MIL)
|
EA
|
1.000
|
$200.000
|
$715.000
|
$725.000
|
$650.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
|
EA
|
142.000
|
$50.000
|
$55.000
|
$55.700
|
$50.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
4,268.000
|
$1.000
|
$1.370
|
$1.400
|
$1.250
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
2,230.000
|
$1.000
|
$1.650
|
$1.700
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
5,299.000
|
$1.000
|
$1.370
|
$1.400
|
$1.250
|
|
REFL PAV MRKR TY I-C
|
EA
|
80.000
|
$10.000
|
$11.000
|
$11.150
|
$10.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
4,440.000
|
$225.000
|
$199.200
|
$200.000
|
$245.000
|
|
|
TACK COAT
|
GAL
|
3,541.000
|
$10.000
|
$9.200
|
$9.000
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,000.000
|
$11,080.000
|
$34,000.000
|
$18,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$250.000
|
$678.000
|
$560.000
|
$550.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$150.000
|
$109.000
|
$115.000
|
$95.000
|
|
Totals: |
$2,571,556.400
|
$2,231,728.040
|
$2,759,972.050
|
$3,441,089.600
|