|
|
PREPARING ROW
|
AC
|
37.230
|
$630.000
|
$300.000
|
$202.010
|
$245.000
|
$250.000
|
$136.080
|
$197.670
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
160.000
|
$50.000
|
$50.000
|
$39.830
|
$43.000
|
$35.000
|
$74.700
|
$31.180
|
|
|
BACKFILL (TY A)
|
STA
|
1,622.270
|
$200.000
|
$150.000
|
$248.960
|
$151.000
|
$100.000
|
$84.450
|
$212.620
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
37.230
|
$540.000
|
$315.000
|
$324.830
|
$350.000
|
$350.000
|
$357.210
|
$330.750
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
11,266.000
|
$3.100
|
$2.500
|
$4.150
|
$2.600
|
$3.000
|
$3.240
|
$2.940
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
101,437.000
|
$85.000
|
$90.630
|
$79.360
|
$81.100
|
$77.800
|
$76.000
|
$85.630
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
43,664.000
|
$26.000
|
$0.850
|
$24.050
|
$17.500
|
$25.000
|
$19.780
|
$20.120
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,250.000
|
$5.000
|
$2.500
|
$4.970
|
$3.100
|
$3.600
|
$2.700
|
$5.510
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
407.000
|
$5.000
|
$2.500
|
$5.840
|
$5.600
|
$3.700
|
$2.860
|
$12.600
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
351.000
|
$5.000
|
$2.500
|
$5.970
|
$6.350
|
$3.600
|
$2.620
|
$12.600
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
380.000
|
$5.000
|
$2.500
|
$6.220
|
$6.200
|
$3.750
|
$3.160
|
$12.600
|
|
|
PLANE ASPH CONC PAV (0"- 2 1/2")
|
SY
|
27,953.000
|
$2.000
|
$2.500
|
$2.650
|
$1.600
|
$3.750
|
$3.020
|
$2.260
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
14.000
|
$200.000
|
$115.000
|
$118.590
|
$127.350
|
$150.000
|
$130.410
|
$120.750
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
48.000
|
$200.000
|
$134.000
|
$139.210
|
$149.500
|
$200.000
|
$153.090
|
$141.750
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
720.000
|
$100.000
|
$34.300
|
$36.830
|
$55.350
|
$30.000
|
$38.900
|
$37.200
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
480.000
|
$20.000
|
$29.200
|
$43.270
|
$31.000
|
$30.000
|
$33.450
|
$32.750
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
18.000
|
$200.000
|
$90.000
|
$154.680
|
$265.000
|
$300.000
|
$168.140
|
$231.950
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$7,500.000
|
$10,000.000
|
$6,702.740
|
$6,000.000
|
$7,000.000
|
$9,412.510
|
$10,140.960
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$15,000.000
|
$10,000.000
|
$10,311.910
|
$6,500.000
|
$8,000.000
|
$7,655.740
|
$7,890.710
|
|
|
SET (TY I)(S= 4 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
1.000
|
$15,000.000
|
$10,000.000
|
$12,889.880
|
$10,000.000
|
$16,500.000
|
$10,691.230
|
$12,073.710
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,500.000
|
$2,000.000
|
$1,546.790
|
$4,900.000
|
$6,000.000
|
$2,689.590
|
$2,543.680
|
|
|
REMOV STR (SET)
|
EA
|
7.000
|
$300.000
|
$210.000
|
$515.600
|
$950.000
|
$800.000
|
$981.590
|
$1,946.730
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,045,739.070
|
$350,000.000
|
$510,692.750
|
$890,000.000
|
$1,000,000.000
|
$1,174,261.580
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$6,000.000
|
$9,038.880
|
$20,282.580
|
$9,300.000
|
$22,000.000
|
$35,000.000
|
$9,490.820
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
500.000
|
$7.500
|
$4.000
|
$8.250
|
$8.550
|
$10.000
|
$7.450
|
$5.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
500.000
|
$2.400
|
$0.500
|
$2.060
|
$2.100
|
$4.000
|
$2.020
|
$1.050
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
290,000.000
|
$0.140
|
$0.200
|
$0.100
|
$0.100
|
$0.250
|
$0.110
|
$0.110
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
9,500.000
|
$25.000
|
$21.500
|
$22.170
|
$24.250
|
$21.500
|
$26.080
|
$24.150
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
25.000
|
$1,850.000
|
$1,450.000
|
$1,753.020
|
$2,000.000
|
$1,450.000
|
$2,154.600
|
$1,995.000
|
|
|
SHORT RADIUS
|
LF
|
400.000
|
$30.000
|
$22.000
|
$22.690
|
$28.000
|
$22.000
|
$30.050
|
$27.830
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
24.000
|
$1,200.000
|
$910.000
|
$938.380
|
$195.000
|
$910.000
|
$209.790
|
$194.250
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
11,050.000
|
$4.000
|
$1.750
|
$1.800
|
$2.650
|
$1.750
|
$2.840
|
$2.630
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
24.000
|
$250.000
|
$150.000
|
$154.680
|
$265.000
|
$150.000
|
$283.500
|
$262.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
25.000
|
$250.000
|
$150.000
|
$154.680
|
$265.000
|
$150.000
|
$283.500
|
$262.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
39.000
|
$2,400.000
|
$2,140.000
|
$2,206.750
|
$2,740.000
|
$2,140.000
|
$2,948.400
|
$2,730.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
35.000
|
$275.000
|
$190.000
|
$195.930
|
$265.000
|
$190.000
|
$283.500
|
$262.500
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
326.000
|
$27.000
|
$30.000
|
$24.750
|
$25.300
|
$25.000
|
$27.220
|
$25.200
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
84.000
|
$700.000
|
$4,400.000
|
$732.150
|
$748.000
|
$245.000
|
$805.140
|
$745.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
19.000
|
$860.000
|
$520.000
|
$809.480
|
$825.000
|
$250.000
|
$890.190
|
$824.250
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$900.000
|
$655.000
|
$943.540
|
$965.000
|
$390.000
|
$1,037.610
|
$960.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
10.000
|
$1,100.000
|
$805.000
|
$1,072.440
|
$1,095.000
|
$425.000
|
$1,179.360
|
$1,092.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,200.000
|
$795.000
|
$1,082.750
|
$1,100.000
|
$425.000
|
$1,190.700
|
$1,102.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
128.000
|
$110.000
|
$70.000
|
$103.120
|
$105.000
|
$35.000
|
$113.400
|
$105.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,910.000
|
$6.000
|
$5.000
|
$5.160
|
$5.250
|
$10.000
|
$5.670
|
$5.250
|
|
|
REMOVE LRSA
|
EA
|
6.000
|
$550.000
|
$600.000
|
$876.510
|
$896.000
|
$1,150.000
|
$963.900
|
$892.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
252.000
|
$150.000
|
$55.000
|
$56.720
|
$142.250
|
$55.000
|
$153.090
|
$141.750
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
23.000
|
$20.000
|
$18.000
|
$18.560
|
$19.000
|
$18.000
|
$20.410
|
$18.900
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
113.000
|
$25.000
|
$17.000
|
$17.530
|
$19.000
|
$17.000
|
$20.410
|
$18.900
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
8.000
|
$25.000
|
$19.000
|
$19.590
|
$19.000
|
$19.000
|
$20.410
|
$18.900
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
220.000
|
$125.000
|
$57.000
|
$58.780
|
$142.250
|
$57.000
|
$153.090
|
$141.750
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
23.000
|
$20.000
|
$17.000
|
$17.530
|
$19.000
|
$17.000
|
$20.410
|
$18.900
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
49.000
|
$25.000
|
$18.000
|
$18.560
|
$19.000
|
$18.000
|
$20.410
|
$18.900
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
196.000
|
$120.000
|
$58.000
|
$59.810
|
$142.250
|
$58.000
|
$153.090
|
$141.750
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
984.000
|
$12.000
|
$1.000
|
$1.030
|
$10.550
|
$1.000
|
$11.340
|
$10.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
113.000
|
$30.000
|
$19.500
|
$20.110
|
$38.000
|
$19.500
|
$40.820
|
$37.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$30.000
|
$20.000
|
$20.620
|
$38.000
|
$20.000
|
$40.820
|
$37.800
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
49.000
|
$25.000
|
$19.000
|
$19.590
|
$38.000
|
$19.000
|
$40.820
|
$37.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,050.000
|
$0.250
|
$1.000
|
$1.030
|
$1.050
|
$1.000
|
$1.130
|
$1.050
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
6,160.000
|
$0.250
|
$1.000
|
$1.030
|
$1.050
|
$1.000
|
$1.130
|
$1.050
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,050.000
|
$0.250
|
$1.000
|
$1.030
|
$1.050
|
$1.000
|
$1.130
|
$1.050
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,282.000
|
$0.900
|
$0.500
|
$1.030
|
$1.050
|
$1.000
|
$1.700
|
$0.810
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
10,705.000
|
$0.650
|
$0.520
|
$0.540
|
$0.550
|
$0.520
|
$0.590
|
$0.550
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
255.000
|
$2.000
|
$2.500
|
$2.580
|
$2.630
|
$2.500
|
$2.840
|
$2.630
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
867.000
|
$7.000
|
$5.000
|
$5.160
|
$5.270
|
$5.000
|
$5.670
|
$5.250
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
2.000
|
$115.000
|
$95.000
|
$97.960
|
$100.000
|
$95.000
|
$107.730
|
$99.750
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
700.000
|
$30.000
|
$12.000
|
$12.370
|
$12.640
|
$12.000
|
$13.610
|
$12.600
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
40,862.000
|
$0.370
|
$0.260
|
$0.270
|
$0.270
|
$0.260
|
$0.290
|
$0.270
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
167,684.000
|
$0.370
|
$0.260
|
$0.270
|
$0.270
|
$0.260
|
$0.290
|
$0.270
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
165,657.000
|
$0.370
|
$0.260
|
$0.270
|
$0.270
|
$0.260
|
$0.290
|
$0.270
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,048.000
|
$2.500
|
$3.000
|
$3.090
|
$3.160
|
$3.000
|
$3.400
|
$3.150
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$12,000.000
|
$30,000.000
|
$41,247.620
|
$12,000.000
|
$20,000.000
|
$16,895.960
|
$37,606.470
|
|
Totals: |
$12,476,002.930
|
$11,242,986.200
|
$11,284,176.072
|
$11,347,786.750
|
$11,366,231.730
|
$11,404,353.588
|
$11,408,328.484
|