|
|
OBLITERATING ABANDONED ROAD
|
STA
|
39.000
|
$2,000.000
|
$600.000
|
$500.000
|
$3,000.000
|
$2,650.770
|
$1,630.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,348.000
|
$8.000
|
$12.000
|
$10.000
|
$11.500
|
$20.000
|
$14.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
10,704.000
|
$10.000
|
$12.000
|
$10.000
|
$19.000
|
$26.500
|
$18.000
|
|
|
BLADING
|
HR
|
20.000
|
$350.000
|
$30.000
|
$75.000
|
$395.000
|
$600.000
|
$200.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
3.600
|
$1,500.000
|
$600.000
|
$1,000.000
|
$565.000
|
$565.000
|
$515.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
1.800
|
$1,100.000
|
$400.000
|
$750.000
|
$935.000
|
$935.000
|
$850.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
1.800
|
$1,200.000
|
$400.000
|
$800.000
|
$935.000
|
$935.000
|
$850.000
|
|
|
VEGETATIVE WATERING
|
MG
|
141.000
|
$45.000
|
$1.000
|
$25.000
|
$28.500
|
$85.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
550.000
|
$2.500
|
$2.000
|
$5.000
|
$1.600
|
$1.600
|
$2.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$150.000
|
$30.000
|
$75.000
|
$165.000
|
$255.000
|
$200.000
|
|
|
FL BS (CMP IN PLC)(TY B GR 3)(FNAL POS)
|
CY
|
6,122.000
|
$35.000
|
$45.000
|
$75.000
|
$65.000
|
$28.400
|
$91.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,673.000
|
$4.500
|
$6.000
|
$5.000
|
$5.300
|
$5.700
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
100.000
|
$7.000
|
$8.000
|
$20.000
|
$5.250
|
$21.800
|
$12.000
|
|
|
ASPH (AC-5)
|
GAL
|
6,944.000
|
$7.000
|
$6.000
|
$10.000
|
$4.800
|
$4.700
|
$5.000
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
145.000
|
$90.000
|
$300.000
|
$200.000
|
$230.000
|
$235.000
|
$260.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG76-28
|
TON
|
2,020.000
|
$130.000
|
$160.000
|
$125.000
|
$160.000
|
$150.000
|
$150.000
|
|
|
CEM STABIL BKFL
|
CY
|
256.000
|
$150.000
|
$220.000
|
$200.000
|
$275.000
|
$225.000
|
$210.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
170.000
|
$120.000
|
$80.000
|
$150.000
|
$140.000
|
$104.000
|
$111.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
515.000
|
$175.000
|
$160.000
|
$250.000
|
$215.000
|
$281.500
|
$180.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
74.600
|
$1,200.000
|
$1,000.000
|
$1,000.000
|
$1,100.000
|
$1,390.000
|
$1,490.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
5,750.000
|
$40.000
|
$22.000
|
$25.000
|
$28.500
|
$34.100
|
$55.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
115.800
|
$575.000
|
$600.000
|
$800.000
|
$610.000
|
$690.000
|
$752.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
746.540
|
$185.000
|
$210.000
|
$250.000
|
$235.000
|
$235.000
|
$256.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
240.000
|
$160.000
|
$100.000
|
$200.000
|
$195.000
|
$150.000
|
$195.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
46.000
|
$680.000
|
$520.000
|
$750.000
|
$720.000
|
$720.000
|
$700.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
310.000
|
$150.000
|
$110.000
|
$100.000
|
$175.000
|
$150.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
102.500
|
$110.000
|
$100.000
|
$100.000
|
$110.000
|
$125.000
|
$134.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$55,000.000
|
$36,000.000
|
$50,000.000
|
$40,000.000
|
$126,000.000
|
$50,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$205,000.000
|
$200,000.000
|
$250,000.000
|
$250,000.000
|
$285,000.000
|
$290,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$6,500.000
|
$8,000.000
|
$5,000.000
|
$7,000.000
|
$15,000.000
|
$2,800.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
200.000
|
$55.000
|
$10.000
|
$40.000
|
$66.500
|
$42.700
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$10.000
|
$10.000
|
$10.000
|
$11.000
|
$13.500
|
$6.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
70.000
|
$45.000
|
$1.000
|
$40.000
|
$33.000
|
$52.500
|
$80.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
70.000
|
$12.000
|
$1.000
|
$10.000
|
$11.000
|
$7.650
|
$20.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
520.000
|
$10.000
|
$5.000
|
$10.000
|
$4.950
|
$10.000
|
$5.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$7,500.000
|
$5,000.000
|
$12,500.000
|
$12,500.000
|
$7,210.000
|
$5,000.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
7,910.000
|
$5.000
|
$1.400
|
$1.000
|
$0.650
|
$0.450
|
$0.550
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
3,955.000
|
$5.000
|
$2.500
|
$1.000
|
$1.000
|
$2.300
|
$1.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
525.000
|
$25.000
|
$28.000
|
$25.000
|
$29.000
|
$29.100
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$1,200.000
|
$2,000.000
|
$2,500.000
|
$2,550.000
|
$1,600.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,900.000
|
$2,900.000
|
$2,500.000
|
$3,100.000
|
$3,100.000
|
$2,200.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
500.000
|
$15.000
|
$20.000
|
$25.000
|
$11.000
|
$30.700
|
$10.000
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
60.000
|
$30.000
|
$60.000
|
$50.000
|
$44.500
|
$84.250
|
$15.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
5.000
|
$450.000
|
$500.000
|
$500.000
|
$915.000
|
$915.000
|
$510.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
30.000
|
$130.000
|
$50.000
|
$150.000
|
$150.000
|
$150.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
2.000
|
$30.000
|
$50.000
|
$50.000
|
$22.000
|
$33.250
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
10.000
|
$30.000
|
$50.000
|
$50.000
|
$22.000
|
$22.000
|
$20.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
20.000
|
$20.000
|
$10.000
|
$10.000
|
$13.500
|
$13.000
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,106.000
|
$3.500
|
$6.000
|
$6.000
|
$6.100
|
$6.100
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
2,598.000
|
$3.500
|
$4.000
|
$4.000
|
$3.900
|
$3.900
|
$3.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$15.000
|
$18.000
|
$20.000
|
$19.000
|
$19.150
|
$18.000
|
|
REFL PAV MRK TY II (BLACK) 4"(SHADOW)
|
LF
|
5,280.000
|
$0.200
|
$0.300
|
$0.350
|
$0.320
|
$0.320
|
$0.290
|
|
|
PAVEMENT SEALER 4"
|
LF
|
756.000
|
$0.500
|
$0.400
|
$0.500
|
$0.410
|
$0.410
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
8,760.000
|
$0.450
|
$0.700
|
$0.750
|
$0.660
|
$0.670
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,263.000
|
$0.450
|
$0.700
|
$0.750
|
$0.660
|
$0.670
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,497.000
|
$0.450
|
$0.700
|
$0.750
|
$0.660
|
$0.670
|
$0.600
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
408.000
|
$5.000
|
$6.000
|
$8.000
|
$6.650
|
$6.650
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
756.000
|
$1.500
|
$1.700
|
$2.000
|
$1.650
|
$1.650
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,250.000
|
$5,000.000
|
$7,500.000
|
$11,000.000
|
$27,645.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
39.000
|
$450.000
|
$190.000
|
$500.000
|
$220.000
|
$530.000
|
$1,600.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$700.000
|
$1,000.000
|
$2,500.000
|
$940.000
|
$755.000
|
$2,000.000
|
|
Totals: |
$2,189,851.400
|
$2,119,655.500
|
$2,442,605.000
|
$2,649,972.160
|
$2,889,739.090
|
$2,970,927.740
|