|
|
PREPARING ROW
|
STA
|
148.000
|
$950.000
|
$213.000
|
$2,500.000
|
$595.000
|
$600.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
35,223.000
|
$2.000
|
$3.000
|
$1.050
|
$2.800
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
28,491.000
|
$7.500
|
$6.000
|
$13.000
|
$9.250
|
$8.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
70,612.000
|
$8.000
|
$10.000
|
$11.500
|
$15.500
|
$8.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
AC
|
33.000
|
$350.000
|
$1,450.800
|
$1,530.000
|
$1,500.000
|
$1,500.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
16.500
|
$350.000
|
$255.800
|
$270.000
|
$390.000
|
$250.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
16.500
|
$350.000
|
$311.300
|
$325.000
|
$455.000
|
$350.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,952.000
|
$25.000
|
$27.000
|
$25.000
|
$24.000
|
$18.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
44,575.000
|
$1.000
|
$1.060
|
$1.050
|
$2.050
|
$1.000
|
|
|
FL BS (COMP IN PLC)(TY A OR B GR 2)(8")
|
SY
|
49,311.000
|
$18.000
|
$19.000
|
$16.000
|
$16.000
|
$29.000
|
|
|
FL BS (RDWY DEL)(TY A OR B GR 2)IN VEH
|
CY
|
3,140.000
|
$26.000
|
$104.000
|
$42.050
|
$50.000
|
$150.000
|
|
|
REWORK BS MTL (TY B) (6") (DENS CONT)
|
SY
|
669.000
|
$12.000
|
$10.000
|
$12.250
|
$9.500
|
$18.500
|
|
|
REWORK BS MTL (TY B) (8") (DENS CONT)
|
SY
|
54,885.000
|
$8.000
|
$2.000
|
$3.650
|
$7.500
|
$2.100
|
|
|
PRIME COAT (MC-30)
|
GAL
|
20,730.000
|
$3.000
|
$7.000
|
$3.350
|
$3.850
|
$4.000
|
|
|
ASPH (AC-5)
|
GAL
|
41,454.000
|
$2.500
|
$3.000
|
$2.450
|
$3.600
|
$4.000
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
899.000
|
$100.000
|
$215.000
|
$77.500
|
$110.000
|
$120.000
|
|
|
D-GR HMA(SQ) TY-B PG70-22
|
TON
|
4,459.000
|
$95.000
|
$110.000
|
$120.000
|
$155.000
|
$140.000
|
|
|
D-GR HMA TY-D SAC-A PG 76-28
|
TON
|
13,323.000
|
$92.000
|
$130.000
|
$113.000
|
$121.060
|
$145.000
|
|
|
CL C CONC (CAP)
|
CY
|
2.000
|
$650.000
|
$460.000
|
$1,580.000
|
$1,600.000
|
$1,700.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
53.000
|
$280.000
|
$260.000
|
$335.000
|
$210.000
|
$170.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
164.000
|
$70.000
|
$69.000
|
$63.250
|
$63.000
|
$65.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
8.000
|
$600.000
|
$461.000
|
$936.000
|
$705.000
|
$750.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
13.000
|
$650.000
|
$266.000
|
$1,075.000
|
$790.000
|
$840.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)
|
LF
|
27.000
|
$980.000
|
$658.000
|
$1,170.000
|
$1,000.000
|
$1,100.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
99.000
|
$1,100.000
|
$873.000
|
$1,360.000
|
$1,300.000
|
$1,300.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
942.000
|
$65.000
|
$80.000
|
$95.000
|
$95.000
|
$100.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 3)
|
EA
|
5.000
|
$6,500.000
|
$15,025.000
|
$7,635.000
|
$5,800.000
|
$6,000.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
1.000
|
$30,000.000
|
$27,465.000
|
$55,000.000
|
$47,500.000
|
$50,000.000
|
|
|
WINGWALL (PW - 1) (HW=14 FT)
|
EA
|
2.000
|
$59,000.000
|
$55,425.000
|
$119,600.000
|
$120,000.000
|
$123,000.000
|
|
|
WINGWALL (PW - 1) (HW=16 FT)
|
EA
|
2.000
|
$70,000.000
|
$71,995.000
|
$170,750.000
|
$160,000.000
|
$175,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$17,000.000
|
$28,725.000
|
$30,000.000
|
$26,500.000
|
$28,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$25,000.000
|
$23,650.000
|
$43,750.000
|
$40,000.000
|
$42,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$900.000
|
$840.000
|
$1,055.000
|
$1,100.000
|
$1,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,200.000
|
$940.000
|
$1,160.000
|
$1,200.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$2,150.000
|
$1,030.000
|
$1,265.000
|
$1,300.000
|
$1,300.000
|
|
|
SET (TY II) (DES 3) (CMP) (3: 1) (C)
|
EA
|
7.000
|
$620.000
|
$1,070.000
|
$1,320.000
|
$1,300.000
|
$1,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
$2,500.000
|
$4,164.000
|
$2,750.000
|
$2,600.000
|
$7,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
307.000
|
$15.000
|
$53.000
|
$10.550
|
$10.500
|
$11.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$599,000.000
|
$700,000.000
|
$790,000.000
|
$680,000.000
|
$350,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$3,000.000
|
$5,000.000
|
$7,250.000
|
$5,800.000
|
$7,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
880.000
|
$25.000
|
$25.000
|
$35.000
|
$42.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
880.000
|
$7.000
|
$2.710
|
$12.500
|
$16.000
|
$5.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
390.000
|
$20.000
|
$23.000
|
$38.000
|
$26.500
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
390.000
|
$5.500
|
$1.370
|
$4.500
|
$10.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
31,515.000
|
$2.000
|
$2.000
|
$3.600
|
$2.900
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
31,515.000
|
$0.600
|
$1.000
|
$2.500
|
$0.680
|
$0.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
8,987.000
|
$6.000
|
$3.000
|
$9.450
|
$5.250
|
$7.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
8,987.000
|
$1.000
|
$1.000
|
$1.450
|
$0.580
|
$1.000
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
669.000
|
$25.000
|
$10.000
|
$8.000
|
$38.500
|
$65.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,205.000
|
$25.000
|
$10.000
|
$9.300
|
$20.500
|
$55.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
51,279.000
|
$0.120
|
$1.000
|
$0.280
|
$0.140
|
$0.200
|
|
|
WIRE FENCE (TY C)
|
LF
|
15,645.000
|
$8.500
|
$10.000
|
$10.550
|
$6.300
|
$5.000
|
|
|
WIRE FENCE (WATER GAP)
|
LF
|
512.000
|
$21.000
|
$15.000
|
$15.800
|
$10.500
|
$18.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$650.000
|
$900.000
|
$585.000
|
$870.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$500.000
|
$1,000.000
|
$600.000
|
$915.000
|
$1,200.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
17.000
|
$480.000
|
$750.000
|
$475.000
|
$750.000
|
$860.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$95.000
|
$125.000
|
$145.000
|
$105.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
213.000
|
$45.000
|
$125.000
|
$130.000
|
$95.000
|
$150.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
7.000
|
$95.000
|
$125.000
|
$130.000
|
$100.000
|
$150.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
103,516.000
|
$0.350
|
$1.000
|
$0.360
|
$0.250
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,850.000
|
$0.350
|
$1.000
|
$0.360
|
$0.250
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
90,853.000
|
$0.350
|
$1.000
|
$0.360
|
$0.260
|
$0.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$7,500.000
|
$23,000.000
|
$20,000.000
|
$12,500.000
|
$5,700.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$600.000
|
$200.000
|
$435.000
|
$525.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$600.000
|
$1,000.000
|
$615.000
|
$840.000
|
$640.000
|
|
Totals: |
$6,294,119.130
|
$7,493,681.150
|
$7,971,033.660
|
$8,150,076.930
|
$8,416,154.800
|