PREPARING ROW
|
STA
|
11.000
|
$1,000.000
|
$2,075.000
|
$1,000.000
|
$2,750.000
|
$10,000.000
|
$5,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (11")
|
SY
|
1,025.000
|
$10.000
|
$8.100
|
$17.000
|
$28.000
|
$25.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,871.000
|
$10.000
|
$13.100
|
$10.000
|
$18.000
|
$19.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
1,452.000
|
$15.000
|
$9.550
|
$16.000
|
$17.000
|
$20.000
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
6,729.000
|
$5.000
|
$1.800
|
$2.000
|
$4.200
|
$2.000
|
$2.000
|
|
|
BLOCK SODDING
|
SY
|
584.000
|
$10.000
|
$5.500
|
$5.500
|
$5.250
|
$5.500
|
$7.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
6,111.000
|
$0.750
|
$0.220
|
$0.220
|
$0.200
|
$0.220
|
$0.330
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
3,056.000
|
$0.500
|
$0.100
|
$0.270
|
$0.250
|
$0.250
|
$0.330
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
3,056.000
|
$0.500
|
$0.280
|
$0.270
|
$0.250
|
$0.250
|
$0.330
|
|
|
VEGETATIVE WATERING
|
MG
|
34.000
|
$50.000
|
$30.000
|
$30.000
|
$52.000
|
$22.000
|
$12.000
|
|
|
CEMENT
|
TON
|
66.000
|
$200.000
|
$175.000
|
$190.000
|
$200.000
|
$165.000
|
$200.000
|
|
|
CEMENT TREAT (EXIST MATL)(12")
|
SY
|
3,900.000
|
$10.000
|
$5.000
|
$3.500
|
$12.000
|
$7.500
|
$6.000
|
|
|
AGGR (TY PE OR PL GR 4)
|
CY
|
122.000
|
$200.000
|
$220.000
|
$190.000
|
$290.000
|
$300.000
|
$250.000
|
|
|
ASPH (AC-15P OR AC-10-2TR)
|
GAL
|
4,387.000
|
$10.000
|
$4.230
|
$3.100
|
$4.010
|
$4.500
|
$6.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
7,340.000
|
$5.000
|
$4.050
|
$3.850
|
$6.450
|
$3.500
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
44.000
|
$250.000
|
$210.000
|
$200.000
|
$225.000
|
$200.000
|
$200.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
92.000
|
$100.000
|
$101.000
|
$80.000
|
$103.000
|
$97.000
|
$100.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$1,675.000
|
$1,100.000
|
$1,300.000
|
$1,600.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$125,000.000
|
$87,000.000
|
$110,000.000
|
$70,000.000
|
$130,000.000
|
$130,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$5,000.000
|
$2,200.000
|
$2,500.000
|
$2,600.000
|
$12,000.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
88.000
|
$45.000
|
$38.000
|
$38.000
|
$36.000
|
$36.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
88.000
|
$10.000
|
$10.000
|
$10.000
|
$9.500
|
$9.000
|
$13.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$30.000
|
$35.500
|
$33.000
|
$34.000
|
$34.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$9.000
|
$10.000
|
$10.000
|
$9.500
|
$9.000
|
$13.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,564.000
|
$2.000
|
$3.100
|
$3.250
|
$3.000
|
$3.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,564.000
|
$1.000
|
$0.970
|
$1.000
|
$0.900
|
$0.900
|
$1.100
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,960.000
|
$50.000
|
$15.630
|
$75.000
|
$70.000
|
$65.000
|
$80.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
3,220.000
|
$10.000
|
$12.600
|
$1.000
|
$9.000
|
$8.000
|
$5.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,960.000
|
$5.000
|
$9.420
|
$10.000
|
$11.000
|
$12.000
|
$7.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
120.000
|
$100.000
|
$266.840
|
$162.000
|
$145.000
|
$87.000
|
$80.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
2,183.000
|
$2.000
|
$3.300
|
$1.250
|
$3.800
|
$2.500
|
$3.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$1,800.000
|
$2,100.000
|
$2,100.000
|
$2,000.000
|
$3,300.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,250.000
|
$1,000.000
|
$1,000.000
|
$950.000
|
$3,300.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$9,625.000
|
$10,000.000
|
$9,200.000
|
$13,000.000
|
$12,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$620.000
|
$850.000
|
$850.000
|
$810.000
|
$510.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$700.000
|
$855.000
|
$850.000
|
$815.000
|
$560.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
7.000
|
$365.000
|
$440.000
|
$440.000
|
$415.000
|
$270.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$150.000
|
$80.000
|
$82.000
|
$110.000
|
$100.000
|
$150.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
2.000
|
$105.000
|
$80.000
|
$82.000
|
$80.000
|
$79.000
|
$400.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
660.000
|
$2.000
|
$1.250
|
$2.200
|
$2.100
|
$1.200
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,156.000
|
$1.000
|
$1.050
|
$2.000
|
$1.600
|
$1.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,156.000
|
$1.000
|
$1.050
|
$2.000
|
$1.600
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,416.000
|
$2.000
|
$1.600
|
$1.320
|
$1.050
|
$1.600
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
620.000
|
$3.000
|
$1.110
|
$2.200
|
$2.100
|
$1.050
|
$2.200
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,136.000
|
$3.000
|
$1.100
|
$1.650
|
$1.600
|
$1.050
|
$1.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,998.000
|
$3.000
|
$1.120
|
$2.200
|
$2.100
|
$1.050
|
$2.200
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$220.000
|
$325.000
|
$264.000
|
$210.000
|
$310.000
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (U-LT ARROW)
|
EA
|
2.000
|
$250.000
|
$440.000
|
$495.000
|
$475.000
|
$420.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$330.000
|
$335.000
|
$330.000
|
$315.000
|
$320.000
|
$330.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
100.000
|
$5.000
|
$4.500
|
$5.500
|
$5.250
|
$4.300
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
6,972.000
|
$1.500
|
$0.600
|
$0.440
|
$0.450
|
$0.600
|
$0.440
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,754.000
|
$0.500
|
$0.110
|
$0.110
|
$0.100
|
$0.110
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,416.000
|
$0.500
|
$0.240
|
$0.110
|
$0.100
|
$0.210
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$20.000
|
$11.000
|
$82.500
|
$80.000
|
$10.500
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (U/LT ARROW)
|
EA
|
2.000
|
$25.000
|
$11.000
|
$110.000
|
$105.000
|
$10.500
|
$110.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$25.000
|
$11.000
|
$82.500
|
$80.000
|
$10.500
|
$100.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
3,158.000
|
$120.000
|
$107.250
|
$110.000
|
$118.000
|
$105.000
|
$115.000
|
|
|
SP MIXES SP-C PG64-22 (LEVEL-UP)
|
TON
|
395.000
|
$200.000
|
$144.540
|
$130.000
|
$190.000
|
$125.000
|
$130.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
1,207.000
|
$150.000
|
$120.950
|
$120.000
|
$122.000
|
$116.000
|
$120.000
|
|
|
TACK COAT
|
GAL
|
1,097.000
|
$10.000
|
$4.500
|
$3.200
|
$3.300
|
$6.000
|
$4.000
|
|
|
TMA (STATIONARY)
|
DAY
|
122.000
|
$150.000
|
$25.000
|
$200.000
|
$150.000
|
$200.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$50.000
|
$50.000
|
$132.000
|
$105.000
|
$75.000
|
$300.000
|
|
Totals: |
$1,353,958.250
|
$1,067,727.980
|
$1,172,255.010
|
$1,327,295.770
|
$1,372,606.820
|
$1,400,407.170
|