PREPARING ROW
|
STA
|
36.000
|
$2,000.000
|
$3,000.000
|
$3,500.000
|
$7,500.000
|
$5,000.000
|
$2,800.000
|
$22,566.080
|
$5,000.000
|
$11,100.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
284.000
|
$40.000
|
$20.000
|
$20.000
|
$35.000
|
$25.000
|
$14.000
|
$34.670
|
$20.000
|
$29.940
|
|
|
RMV (15") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,789.000
|
$25.000
|
$10.640
|
$15.000
|
$7.500
|
$15.000
|
$13.500
|
$22.100
|
$20.000
|
$13.380
|
|
|
RMV (8"-19") TRT/UNTRT BASE & ASPH PAV
|
SY
|
71.000
|
$20.000
|
$2.750
|
$22.000
|
$15.000
|
$15.000
|
$24.000
|
$20.800
|
$15.000
|
$35.040
|
|
|
REMOVE STAB BASE AND ASPH PAV (6"-20")
|
SY
|
1,654.000
|
$10.000
|
$12.860
|
$12.500
|
$7.000
|
$15.000
|
$16.000
|
$23.790
|
$18.000
|
$19.030
|
|
|
EXCAV (ROADWAY)
|
CY
|
2,370.000
|
$20.000
|
$10.000
|
$18.500
|
$12.000
|
$10.000
|
$17.000
|
$20.340
|
$20.000
|
$23.430
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
4,252.000
|
$25.000
|
$10.000
|
$26.500
|
$18.000
|
$30.000
|
$36.000
|
$16.540
|
$30.000
|
$29.110
|
|
|
BLADING
|
STA
|
29.000
|
$350.000
|
$500.000
|
$250.000
|
$188.000
|
$350.000
|
$220.000
|
$303.390
|
$1.000
|
$167.240
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
60,400.000
|
$2.500
|
$3.000
|
$3.100
|
$1.000
|
$2.760
|
$3.000
|
$5.820
|
$2.000
|
$2.190
|
|
|
BLOCK SODDING
|
SY
|
88.000
|
$10.000
|
$13.910
|
$14.000
|
$10.000
|
$5.000
|
$8.800
|
$7.020
|
$20.000
|
$20.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
60,400.000
|
$1.750
|
$0.670
|
$0.650
|
$0.540
|
$0.250
|
$0.550
|
$0.980
|
$1.000
|
$0.750
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
30,200.000
|
$1.250
|
$0.630
|
$0.600
|
$0.540
|
$0.250
|
$0.550
|
$0.300
|
$1.000
|
$0.750
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
30,200.000
|
$1.250
|
$0.630
|
$0.650
|
$0.540
|
$0.250
|
$0.550
|
$0.300
|
$1.000
|
$0.750
|
|
|
VEGETATIVE WATERING
|
TGL
|
3,624.800
|
$20.000
|
$5.000
|
$16.000
|
$3.500
|
$10.000
|
$20.000
|
$31.710
|
$1.000
|
$50.140
|
|
|
SPRINKLING (DUST CONTROL)
|
TGL
|
60.000
|
$10.000
|
$100.000
|
$25.000
|
$3.500
|
$100.000
|
$20.000
|
$0.870
|
$1.000
|
$104.430
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
|
SY
|
2,073.000
|
$40.000
|
$76.000
|
$57.000
|
$44.000
|
$35.000
|
$58.500
|
$32.220
|
$50.000
|
$71.160
|
|
|
FL BS (CMP IN PLC)(RAP) (6")
|
SY
|
1,654.000
|
$40.000
|
$25.000
|
$30.000
|
$24.000
|
$25.000
|
$15.000
|
$28.190
|
$45.000
|
$12.860
|
|
|
CEMENT
|
TON
|
126.000
|
$260.000
|
$300.000
|
$300.000
|
$250.000
|
$350.000
|
$290.000
|
$238.380
|
$300.000
|
$391.510
|
|
|
CEMENT TRT (NEW BASE)(12")
|
SY
|
3,727.000
|
$10.000
|
$5.000
|
$4.000
|
$5.000
|
$4.000
|
$6.000
|
$2.170
|
$12.000
|
$6.210
|
|
|
CEMENT TRT (SUBGRADE)(12")
|
SY
|
3,848.000
|
$6.000
|
$5.000
|
$4.000
|
$7.000
|
$5.000
|
$5.750
|
$4.980
|
$12.000
|
$6.010
|
|
|
ASPH (RC-250)
|
TON
|
36.000
|
$1,500.000
|
$963.000
|
$1,225.000
|
$1,200.000
|
$100.000
|
$1.000
|
$2,083.710
|
$1,800.000
|
$1,000.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
GAL
|
21.300
|
$1,250.000
|
$3.750
|
$26.000
|
$10.000
|
$100.000
|
$1.000
|
$5.420
|
$2,000.000
|
$1,000.000
|
|
|
AGGR (TY E OR L, GR-5)
|
CY
|
25.000
|
$360.000
|
$1,177.000
|
$330.000
|
$750.000
|
$200.000
|
$1,000.000
|
$111.360
|
$1,000.000
|
$1,000.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4) (SAC-A)
|
CY
|
99.000
|
$360.000
|
$856.000
|
$220.000
|
$350.000
|
$200.000
|
$700.000
|
$146.490
|
$950.000
|
$900.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
1,442.000
|
$180.000
|
$269.790
|
$172.000
|
$190.000
|
$350.000
|
$220.000
|
$261.660
|
$210.000
|
$209.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
357.000
|
$180.000
|
$309.260
|
$167.000
|
$220.000
|
$350.000
|
$230.000
|
$265.010
|
$270.000
|
$260.000
|
|
|
SP MIXES SP-D PG64-22 (LEVEL-UP)
|
TON
|
30.000
|
$180.000
|
$465.450
|
$260.000
|
$350.000
|
$350.000
|
$400.000
|
$261.900
|
$606.000
|
$607.000
|
|
|
SP MIXES SP-D PG64-22 (EXEMPT)
|
TON
|
89.000
|
$180.000
|
$310.300
|
$320.000
|
$750.000
|
$350.000
|
$285.000
|
$457.690
|
$340.000
|
$335.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
9,417.000
|
$8.000
|
$3.660
|
$4.000
|
$3.100
|
$17.000
|
$4.000
|
$4.180
|
$10.000
|
$8.960
|
|
|
CUT & RESTORING PAV
|
SY
|
24.000
|
$200.000
|
$150.000
|
$205.000
|
$220.000
|
$250.000
|
$175.000
|
$216.710
|
$300.000
|
$187.210
|
|
|
CEM STABIL BKFL
|
CY
|
384.000
|
$325.000
|
$260.000
|
$230.000
|
$190.000
|
$300.000
|
$290.000
|
$261.500
|
$290.000
|
$378.560
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
140.000
|
$175.000
|
$274.380
|
$185.000
|
$280.000
|
$150.000
|
$148.000
|
$207.650
|
$175.000
|
$124.540
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
420.000
|
$300.000
|
$304.450
|
$243.000
|
$270.000
|
$300.000
|
$235.000
|
$167.190
|
$240.000
|
$232.540
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
630.000
|
$380.000
|
$395.570
|
$353.000
|
$290.000
|
$600.000
|
$320.000
|
$230.360
|
$350.000
|
$342.260
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
8.000
|
$300.000
|
$778.010
|
$450.000
|
$460.000
|
$450.000
|
$445.000
|
$840.360
|
$500.000
|
$727.110
|
|
|
CL C CONC (ABUT)
|
CY
|
88.400
|
$1,300.000
|
$1,100.000
|
$1,100.000
|
$2,100.000
|
$1,163.000
|
$1,175.000
|
$1,261.510
|
$2,000.000
|
$2,041.820
|
|
|
CL C CONC (CAP)
|
CY
|
65.400
|
$1,500.000
|
$1,500.000
|
$1,300.000
|
$1,600.000
|
$1,500.000
|
$1,400.000
|
$1,805.770
|
$2,200.000
|
$2,122.040
|
|
|
CL C CONC (COLUMN)
|
CY
|
15.000
|
$2,000.000
|
$2,500.000
|
$2,050.000
|
$2,100.000
|
$1,200.000
|
$2,800.000
|
$3,454.250
|
$2,200.000
|
$2,763.630
|
|
|
REINF CONC SLAB
|
SF
|
12,420.000
|
$23.000
|
$17.780
|
$25.000
|
$34.000
|
$27.000
|
$31.000
|
$36.420
|
$30.000
|
$40.700
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
3,900.000
|
$28.000
|
$21.000
|
$17.000
|
$31.000
|
$19.000
|
$26.000
|
$75.380
|
$30.000
|
$32.790
|
|
|
APPROACH SLAB
|
CY
|
154.000
|
$830.000
|
$700.000
|
$800.000
|
$800.000
|
$750.000
|
$665.000
|
$663.480
|
$1,000.000
|
$1,014.500
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,013.540
|
$200.000
|
$237.000
|
$200.000
|
$235.000
|
$320.000
|
$245.000
|
$272.970
|
$290.000
|
$308.020
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
696.500
|
$225.000
|
$237.000
|
$200.000
|
$235.000
|
$320.000
|
$265.000
|
$215.100
|
$290.000
|
$305.240
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
742.500
|
$340.000
|
$305.000
|
$260.000
|
$275.000
|
$259.000
|
$310.000
|
$321.070
|
$300.000
|
$394.180
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
0.350
|
$700.000
|
$2,000.000
|
$4,500.000
|
$1,800.000
|
$1,500.000
|
$4,000.000
|
$650.120
|
$1,500.000
|
$5,228.660
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
181.000
|
$235.000
|
$130.000
|
$185.000
|
$146.000
|
$180.000
|
$185.000
|
$177.700
|
$180.000
|
$301.350
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
4,265.000
|
$320.000
|
$130.000
|
$195.000
|
$146.000
|
$180.000
|
$180.000
|
$140.810
|
$175.000
|
$293.960
|
|
|
RAIL (TY T223)
|
LF
|
324.000
|
$160.000
|
$165.000
|
$100.000
|
$220.000
|
$150.000
|
$120.000
|
$309.470
|
$180.000
|
$220.760
|
|
|
RAIL (TY SSTR)
|
LF
|
604.000
|
$130.000
|
$155.000
|
$80.000
|
$145.000
|
$180.000
|
$100.000
|
$175.410
|
$120.000
|
$190.350
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
44.000
|
$250.000
|
$150.000
|
$210.000
|
$200.000
|
$180.000
|
$140.000
|
$173.370
|
$200.000
|
$273.540
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
103.000
|
$250.000
|
$150.000
|
$300.000
|
$250.000
|
$180.000
|
$260.000
|
$326.860
|
$250.000
|
$427.050
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
144.000
|
$90.000
|
$60.000
|
$75.000
|
$75.000
|
$65.000
|
$125.000
|
$90.150
|
$60.000
|
$185.390
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,500.000
|
$1,000.000
|
$1,400.000
|
$1,300.000
|
$1,000.000
|
$1,300.000
|
$1,601.900
|
$2,200.000
|
$3,199.910
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$42,000.000
|
$30,000.000
|
$21,000.000
|
$40,000.000
|
$20,000.000
|
$30,000.000
|
$40,452.050
|
$30,000.000
|
$16,645.450
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$50,000.000
|
$32,000.000
|
$93,000.000
|
$160,000.000
|
$90,000.000
|
$98,240.700
|
$150,000.000
|
$57,608.730
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$1,000.000
|
$500.000
|
$1,000.000
|
$1,600.000
|
$500.000
|
$1,800.000
|
$1,083.540
|
$500.000
|
$1,498.790
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$700,000.000
|
$400,000.000
|
$400,000.000
|
$655,000.000
|
$750,000.000
|
$650,000.000
|
$816,418.800
|
$750,000.000
|
$907,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$3,500.000
|
$792.450
|
$5,000.000
|
$15,000.000
|
$2,500.000
|
$7,500.000
|
$4,334.150
|
$12,000.000
|
$5,596.270
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$20,000.000
|
$25,000.000
|
$17,000.000
|
$12,000.000
|
$15,000.000
|
$17,500.000
|
$20,226.030
|
$30,000.000
|
$17,493.320
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$325.000
|
$250.000
|
$330.000
|
$200.000
|
$250.000
|
$200.000
|
$192.670
|
$300.000
|
$331.790
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$350.000
|
$300.000
|
$550.000
|
$300.000
|
$1,000.000
|
$200.000
|
$216.710
|
$300.000
|
$835.160
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
898.000
|
$55.000
|
$36.380
|
$40.000
|
$37.000
|
$65.000
|
$40.000
|
$47.470
|
$1.000
|
$65.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
898.000
|
$15.000
|
$13.910
|
$9.000
|
$8.000
|
$10.000
|
$8.800
|
$14.760
|
$1.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
669.000
|
$40.000
|
$10.000
|
$50.000
|
$25.000
|
$25.000
|
$32.000
|
$39.870
|
$1.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
669.000
|
$15.000
|
$1.000
|
$11.000
|
$5.000
|
$10.000
|
$11.000
|
$10.970
|
$1.000
|
$10.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
460.000
|
$15.000
|
$10.000
|
$8.000
|
$7.000
|
$3.000
|
$6.600
|
$4.940
|
$1.000
|
$8.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,147.000
|
$5.000
|
$4.070
|
$4.250
|
$3.900
|
$4.000
|
$4.000
|
$3.960
|
$1.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,147.000
|
$1.000
|
$0.860
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
$1.200
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,337.000
|
$110.000
|
$151.720
|
$160.000
|
$150.000
|
$120.000
|
$200.000
|
$125.780
|
$235.000
|
$208.980
|
|
|
DRIVEWAYS (ACP)
|
SY
|
389.000
|
$75.000
|
$73.830
|
$365.000
|
$62.000
|
$75.000
|
$68.000
|
$79.020
|
$90.000
|
$154.190
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,012.500
|
$35.000
|
$33.160
|
$30.000
|
$26.000
|
$25.000
|
$33.000
|
$32.360
|
$30.000
|
$27.600
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,500.000
|
$1,845.750
|
$2,100.000
|
$1,800.000
|
$2,850.000
|
$1,900.000
|
$2,195.970
|
$1,800.000
|
$1,990.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,300.000
|
$1,524.750
|
$1,800.000
|
$1,700.000
|
$2,500.000
|
$1,500.000
|
$2,080.390
|
$1,600.000
|
$1,675.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,550.000
|
$8.000
|
$3.210
|
$2.250
|
$2.200
|
$3.000
|
$3.300
|
$6.360
|
$3.000
|
$3.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,200.000
|
$160.500
|
$225.000
|
$220.000
|
$2,500.000
|
$165.000
|
$248.490
|
$200.000
|
$275.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,500.000
|
$3,236.750
|
$3,500.000
|
$3,300.000
|
$3,050.000
|
$3,325.000
|
$3,814.050
|
$3,150.000
|
$3,090.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$725.000
|
$214.000
|
$225.000
|
$220.000
|
$250.000
|
$220.000
|
$288.940
|
$500.000
|
$325.000
|
|
|
WIRE FENCE (TY D)
|
LF
|
5,758.000
|
$30.000
|
$15.000
|
$35.000
|
$11.000
|
$15.000
|
$16.500
|
$16.970
|
$20.000
|
$24.500
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
3.000
|
$400.000
|
$323.140
|
$350.000
|
$340.000
|
$450.000
|
$900.000
|
$317.840
|
$1,000.000
|
$325.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
1.000
|
$400.000
|
$216.140
|
$225.000
|
$290.000
|
$350.000
|
$550.000
|
$9,193.490
|
$500.000
|
$275.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
1.000
|
$4,700.000
|
$8,511.220
|
$11,550.000
|
$12,000.000
|
$10,500.000
|
$11,500.000
|
$20.090
|
$12,000.000
|
$7,954.410
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
620.000
|
$12.000
|
$18.600
|
$18.500
|
$19.000
|
$17.000
|
$18.000
|
$2.910
|
$18.000
|
$17.380
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
620.000
|
$2.000
|
$2.700
|
$2.750
|
$3.000
|
$2.500
|
$2.750
|
$3.390
|
$3.000
|
$2.520
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,240.000
|
$2.000
|
$3.140
|
$3.000
|
$3.000
|
$2.700
|
$3.000
|
$3.390
|
$3.000
|
$2.930
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
3.000
|
$1,500.000
|
$1,372.400
|
$1,925.000
|
$2,000.000
|
$1,750.000
|
$1,900.000
|
$1,482.410
|
$2,000.000
|
$1,282.610
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$9,000.000
|
$10,304.300
|
$9,500.000
|
$9,700.000
|
$8,550.000
|
$9,400.000
|
$11,130.300
|
$10,000.000
|
$9,630.180
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$850.000
|
$1,626.400
|
$1,675.000
|
$1,220.000
|
$1,000.000
|
$1,100.000
|
$1,346.480
|
$2,000.000
|
$1,165.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
8.000
|
$810.000
|
$486.850
|
$500.000
|
$620.000
|
$700.000
|
$1,100.000
|
$676.130
|
$1,500.000
|
$585.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$185.000
|
$105.930
|
$110.000
|
$140.000
|
$100.000
|
$110.000
|
$150.250
|
$500.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
8.000
|
$57.000
|
$21.400
|
$35.000
|
$33.000
|
$35.000
|
$22.000
|
$24.850
|
$30.000
|
$21.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
14.000
|
$46.000
|
$26.750
|
$40.000
|
$36.000
|
$35.000
|
$27.500
|
$28.320
|
$30.000
|
$24.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
1.000
|
$40.000
|
$53.500
|
$100.000
|
$130.000
|
$35.000
|
$275.000
|
$144.470
|
$500.000
|
$125.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
11,496.000
|
$1.000
|
$0.810
|
$1.000
|
$0.800
|
$0.750
|
$0.820
|
$0.870
|
$2.000
|
$0.520
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
11,496.000
|
$1.000
|
$0.810
|
$1.000
|
$0.800
|
$0.750
|
$0.820
|
$0.870
|
$2.000
|
$0.520
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
144.000
|
$6.000
|
$7.490
|
$8.000
|
$7.400
|
$7.000
|
$7.700
|
$8.090
|
$15.000
|
$7.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
5,748.000
|
$2.500
|
$2.140
|
$2.250
|
$2.200
|
$2.000
|
$2.200
|
$2.310
|
$2.500
|
$1.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
575.000
|
$2.500
|
$2.680
|
$5.000
|
$1.000
|
$2.000
|
$2.200
|
$0.540
|
$4.000
|
$2.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,150.000
|
$2.500
|
$2.680
|
$5.000
|
$1.000
|
$2.000
|
$2.200
|
$0.570
|
$4.000
|
$2.500
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
16.000
|
$1.000
|
$8.560
|
$9.000
|
$8.500
|
$20.000
|
$8.800
|
$9.250
|
$15.000
|
$4.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
5,740.000
|
$1.000
|
$2.680
|
$2.750
|
$2.600
|
$2.500
|
$2.750
|
$2.890
|
$2.500
|
$1.650
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
5,740.000
|
$1.000
|
$2.680
|
$2.750
|
$2.600
|
$2.500
|
$2.750
|
$2.890
|
$2.500
|
$1.650
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
119.000
|
$1.000
|
$5.350
|
$6.000
|
$5.300
|
$5.000
|
$5.500
|
$5.780
|
$3.000
|
$1.350
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
16.000
|
$18.000
|
$21.400
|
$25.000
|
$22.000
|
$20.000
|
$22.000
|
$23.120
|
$15.000
|
$22.100
|
|
REFL PAV MRKR TY I-C
|
EA
|
1.000
|
$6.000
|
$21.400
|
$25.000
|
$22.000
|
$20.000
|
$22.000
|
$23.120
|
$50.000
|
$20.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
144.000
|
$6.000
|
$10.700
|
$12.000
|
$11.000
|
$10.000
|
$11.000
|
$11.560
|
$15.000
|
$8.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
5,748.000
|
$0.600
|
$1.070
|
$2.250
|
$0.700
|
$2.000
|
$4.400
|
$0.650
|
$2.000
|
$0.520
|
|
|
BONDING COURSE
|
GAL
|
710.000
|
$6.500
|
$8.560
|
$5.500
|
$6.000
|
$7.000
|
$7.000
|
$4.120
|
$8.000
|
$6.500
|
|
|
TEMPORARY DETOUR BRIDGE
|
EA
|
1.000
|
$300,000.000
|
$445,000.000
|
$500,000.000
|
$300,000.000
|
$200,000.000
|
$600,000.000
|
$539,305.690
|
$950,000.000
|
$1,020,000.000
|
|
Totals: |
$7,373,105.300
|
$6,230,927.105
|
$6,657,813.850
|
$6,780,150.300
|
$7,114,128.000
|
$7,372,316.440
|
$8,195,695.387
|
$8,690,667.400
|
$9,773,671.518
|