|
|
PREPARING ROW
|
STA
|
26.500
|
$3,500.000
|
$3,500.000
|
$7,050.000
|
$1,801.000
|
$15,700.000
|
$2,500.000
|
$2,000.000
|
$1,000.000
|
$19,000.000
|
$24,783.000
|
$1,000.000
|
$21,445.000
|
$2,400.000
|
$22,000.000
|
$3,000.000
|
$3,382.930
|
|
|
REMOVING CONC (PAV)
|
SY
|
17,863.000
|
$8.000
|
$7.500
|
$6.000
|
$5.270
|
$4.200
|
$6.000
|
$6.500
|
$15.000
|
$10.000
|
$1.000
|
$7.000
|
$6.520
|
$6.000
|
$6.000
|
$10.000
|
$13.580
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
94.000
|
$25.000
|
$22.000
|
$31.000
|
$22.000
|
$21.000
|
$31.000
|
$20.000
|
$10.000
|
$15.000
|
$17.000
|
$14.250
|
$8.730
|
$10.000
|
$35.000
|
$20.000
|
$12.340
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
328.000
|
$9.000
|
$6.000
|
$17.000
|
$6.000
|
$7.350
|
$17.000
|
$7.250
|
$5.000
|
$15.000
|
$5.000
|
$8.250
|
$3.750
|
$10.000
|
$20.000
|
$10.000
|
$6.410
|
|
|
REMOVING CONC (FLUME)
|
SY
|
210.000
|
$15.000
|
$9.000
|
$29.000
|
$18.000
|
$12.600
|
$29.000
|
$20.000
|
$15.000
|
$15.000
|
$21.000
|
$12.750
|
$9.760
|
$12.000
|
$20.000
|
$15.000
|
$11.500
|
|
|
REMOVING STAB BASE & ASPH PAV (0"-10")
|
SY
|
9,967.000
|
$10.000
|
$4.750
|
$6.000
|
$3.450
|
$4.500
|
$6.000
|
$3.000
|
$5.000
|
$8.000
|
$3.500
|
$5.750
|
$1.430
|
$5.000
|
$5.000
|
$5.000
|
$5.480
|
|
|
REMOVING STAB BASE & ASPH PV(10 TO 16")
|
SY
|
1,680.000
|
$10.500
|
$8.500
|
$8.000
|
$5.800
|
$10.000
|
$8.000
|
$4.000
|
$10.000
|
$8.000
|
$6.500
|
$11.500
|
$3.940
|
$8.000
|
$5.000
|
$10.000
|
$12.880
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,675.000
|
$12.000
|
$6.000
|
$7.000
|
$8.490
|
$7.350
|
$7.000
|
$14.000
|
$15.000
|
$20.000
|
$11.000
|
$7.500
|
$5.000
|
$10.000
|
$10.000
|
$20.000
|
$10.880
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
56,105.000
|
$11.000
|
$10.000
|
$10.900
|
$9.220
|
$9.450
|
$10.900
|
$12.500
|
$10.500
|
$12.000
|
$9.000
|
$7.500
|
$10.000
|
$10.000
|
$18.000
|
$25.000
|
$6.850
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
44,373.000
|
$2.000
|
$1.670
|
$1.000
|
$1.100
|
$1.100
|
$1.900
|
$0.950
|
$3.000
|
$1.000
|
$0.970
|
$1.650
|
$1.830
|
$2.000
|
$1.340
|
$1.000
|
$0.930
|
|
|
BLOCK SODDING
|
SY
|
2,713.000
|
$4.000
|
$4.150
|
$4.500
|
$4.450
|
$3.250
|
$4.000
|
$4.000
|
$3.800
|
$4.500
|
$4.470
|
$4.900
|
$3.950
|
$4.500
|
$3.950
|
$6.000
|
$5.770
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
44,373.000
|
$0.150
|
$0.140
|
$0.120
|
$0.150
|
$1.100
|
$0.140
|
$0.170
|
$0.200
|
$0.140
|
$0.140
|
$0.150
|
$0.130
|
$0.180
|
$0.130
|
$0.200
|
$0.190
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
44,373.000
|
$0.130
|
$0.100
|
$0.120
|
$0.130
|
$0.560
|
$0.090
|
$0.150
|
$0.160
|
$0.120
|
$0.120
|
$0.130
|
$0.080
|
$0.160
|
$0.080
|
$0.100
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
7,280.000
|
$15.000
|
$5.000
|
$3.000
|
$4.000
|
$3.500
|
$41.000
|
$0.100
|
$10.000
|
$4.000
|
$24.000
|
$26.000
|
$23.100
|
$30.000
|
$1.000
|
$22.000
|
$15.650
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2)(16")
|
SY
|
21,756.000
|
$22.000
|
$20.000
|
$22.000
|
$21.100
|
$23.500
|
$22.000
|
$21.000
|
$30.000
|
$21.000
|
$20.000
|
$18.750
|
$31.410
|
$42.000
|
$30.000
|
$27.500
|
$38.570
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
561.000
|
$150.000
|
$205.000
|
$200.000
|
$190.000
|
$175.000
|
$200.000
|
$172.000
|
$200.000
|
$195.000
|
$227.000
|
$245.000
|
$218.890
|
$200.000
|
$194.160
|
$175.000
|
$270.100
|
|
|
LIME TRT (SUBGRADE)(12")
|
SY
|
22,762.000
|
$10.000
|
$5.500
|
$4.650
|
$3.620
|
$4.000
|
$4.650
|
$3.000
|
$5.000
|
$5.500
|
$3.000
|
$3.500
|
$3.020
|
$4.000
|
$4.100
|
$8.000
|
$6.130
|
|
|
PRIME COAT (MC-30)
|
GAL
|
4,352.000
|
$5.000
|
$4.700
|
$6.000
|
$5.000
|
$4.790
|
$6.000
|
$4.250
|
$5.000
|
$4.500
|
$4.500
|
$5.250
|
$3.880
|
$5.000
|
$3.600
|
$5.000
|
$6.570
|
|
|
ASPH (CRS-2P)
|
GAL
|
5,440.000
|
$4.000
|
$3.900
|
$4.000
|
$5.650
|
$3.990
|
$4.000
|
$3.600
|
$5.000
|
$3.750
|
$3.750
|
$4.500
|
$3.340
|
$4.000
|
$3.100
|
$6.000
|
$5.480
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
4,569.000
|
$4.000
|
$4.200
|
$4.000
|
$5.650
|
$4.260
|
$4.000
|
$3.750
|
$6.000
|
$4.000
|
$4.000
|
$5.000
|
$3.780
|
$4.000
|
$3.500
|
$6.000
|
$5.840
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
207.000
|
$150.000
|
$185.000
|
$176.000
|
$168.000
|
$186.380
|
$176.000
|
$180.000
|
$180.000
|
$175.000
|
$175.000
|
$195.000
|
$129.450
|
$195.000
|
$120.000
|
$170.000
|
$255.500
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
3,399.000
|
$70.000
|
$94.000
|
$89.000
|
$105.620
|
$85.200
|
$89.000
|
$71.000
|
$110.000
|
$80.000
|
$80.000
|
$103.000
|
$113.270
|
$90.000
|
$105.000
|
$80.000
|
$116.800
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
2,267.000
|
$85.000
|
$99.000
|
$94.000
|
$108.250
|
$90.530
|
$94.000
|
$80.000
|
$115.000
|
$85.000
|
$85.000
|
$109.000
|
$124.060
|
$90.000
|
$115.000
|
$85.000
|
$124.100
|
|
|
CEM STABIL BKFL
|
CY
|
460.000
|
$120.000
|
$186.000
|
$150.000
|
$256.000
|
$168.000
|
$210.000
|
$172.000
|
$180.000
|
$160.000
|
$158.000
|
$195.000
|
$159.660
|
$180.000
|
$137.050
|
$90.000
|
$131.880
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,464.000
|
$140.000
|
$150.000
|
$140.000
|
$137.210
|
$168.000
|
$155.000
|
$160.000
|
$130.000
|
$150.000
|
$156.000
|
$140.000
|
$133.490
|
$120.000
|
$139.940
|
$175.000
|
$238.370
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
192.500
|
$1,000.000
|
$850.000
|
$850.000
|
$846.000
|
$1,000.000
|
$896.000
|
$765.000
|
$900.000
|
$1,175.000
|
$1,100.000
|
$725.000
|
$1,000.000
|
$900.000
|
$900.000
|
$1,000.000
|
$1,609.340
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
178.000
|
$1,000.000
|
$850.000
|
$850.000
|
$902.000
|
$1,000.000
|
$836.000
|
$900.000
|
$1,200.000
|
$1,350.000
|
$1,030.000
|
$765.000
|
$988.000
|
$1,000.000
|
$1,000.000
|
$1,300.000
|
$2,634.070
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
80.700
|
$1,000.000
|
$850.000
|
$850.000
|
$944.000
|
$1,000.000
|
$1,025.000
|
$1,100.000
|
$611.000
|
$1,160.000
|
$1,125.000
|
$800.000
|
$1,200.000
|
$1,000.000
|
$1,000.000
|
$3,400.000
|
$1,700.130
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
39,200.000
|
$19.000
|
$16.000
|
$14.000
|
$17.650
|
$17.000
|
$16.500
|
$19.000
|
$17.000
|
$21.000
|
$21.000
|
$17.250
|
$20.000
|
$18.000
|
$16.500
|
$20.000
|
$31.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
244.000
|
$475.000
|
$495.000
|
$400.000
|
$604.000
|
$585.000
|
$500.000
|
$475.000
|
$500.000
|
$540.000
|
$420.000
|
$475.000
|
$513.150
|
$500.000
|
$600.000
|
$600.000
|
$874.980
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
4,865.010
|
$145.000
|
$128.500
|
$120.000
|
$171.360
|
$178.500
|
$134.500
|
$136.000
|
$142.000
|
$125.000
|
$148.000
|
$127.000
|
$148.200
|
$140.000
|
$190.000
|
$125.000
|
$184.280
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
80.000
|
$450.000
|
$400.000
|
$500.000
|
$412.000
|
$420.000
|
$495.000
|
$465.000
|
$400.000
|
$500.000
|
$431.000
|
$480.000
|
$445.060
|
$450.000
|
$550.000
|
$600.000
|
$499.940
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
2,611.000
|
$115.000
|
$100.000
|
$120.000
|
$112.000
|
$150.000
|
$115.000
|
$76.000
|
$120.000
|
$130.000
|
$127.000
|
$160.000
|
$114.810
|
$100.000
|
$150.000
|
$100.000
|
$148.890
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
150.600
|
$475.000
|
$400.000
|
$500.000
|
$421.000
|
$450.000
|
$615.000
|
$450.000
|
$400.000
|
$550.000
|
$440.000
|
$515.000
|
$684.050
|
$500.000
|
$600.000
|
$600.000
|
$575.990
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
2,152.000
|
$103.000
|
$100.000
|
$80.000
|
$105.000
|
$150.000
|
$118.000
|
$125.000
|
$76.000
|
$145.000
|
$96.000
|
$74.000
|
$102.840
|
$100.000
|
$110.000
|
$125.000
|
$149.920
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
389.000
|
$85.000
|
$80.000
|
$70.000
|
$83.000
|
$52.500
|
$80.000
|
$80.000
|
$100.000
|
$100.000
|
$62.000
|
$65.000
|
$84.820
|
$100.000
|
$90.000
|
$100.000
|
$138.350
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
408.000
|
$80.000
|
$68.000
|
$85.000
|
$72.000
|
$73.500
|
$80.000
|
$80.000
|
$100.000
|
$105.000
|
$76.000
|
$87.500
|
$82.960
|
$60.000
|
$110.000
|
$100.000
|
$104.450
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$1,350.000
|
$1,000.000
|
$655.000
|
$945.000
|
$1,100.000
|
$900.000
|
$1,000.000
|
$3,500.000
|
$1,200.000
|
$785.000
|
$855.190
|
$1,000.000
|
$1,000.000
|
$1,700.000
|
$1,460.260
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$575.000
|
$185.000
|
$750.000
|
$250.000
|
$315.000
|
$575.000
|
$350.000
|
$500.000
|
$500.000
|
$587.000
|
$350.000
|
$760.050
|
$250.000
|
$450.000
|
$750.000
|
$514.230
|
|
|
REMOV STR (PIPE)
|
LF
|
115.000
|
$25.000
|
$10.000
|
$35.000
|
$8.000
|
$13.650
|
$30.000
|
$15.000
|
$50.000
|
$35.000
|
$22.000
|
$22.000
|
$17.290
|
$20.000
|
$30.000
|
$25.000
|
$20.980
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$35,000.000
|
$30,000.000
|
$30,000.000
|
$33,854.000
|
$14,700.000
|
$21,000.000
|
$40,000.000
|
$20,000.000
|
$30,000.000
|
$100,000.000
|
$26,500.000
|
$35,000.000
|
$40,000.000
|
$19,681.340
|
$110,000.000
|
$36,043.750
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
3.000
|
$50,000.000
|
$40,000.000
|
$35,000.000
|
$53,261.000
|
$25,200.000
|
$28,000.000
|
$50,000.000
|
$30,000.000
|
$40,000.000
|
$125,000.000
|
$36,750.000
|
$45,000.000
|
$65,000.000
|
$19,681.340
|
$135,000.000
|
$36,043.750
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$699,181.970
|
$747,000.000
|
$740,000.000
|
$750,000.000
|
$791,000.000
|
$693,000.000
|
$800,000.000
|
$950,000.000
|
$900,000.000
|
$850,000.000
|
$880,000.000
|
$900,000.000
|
$890,000.000
|
$831,000.000
|
$850,000.000
|
$554,419.280
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$14,000.000
|
$4,000.000
|
$10,000.000
|
$1,385.000
|
$5,250.000
|
$1,500.000
|
$2,000.000
|
$1,500.000
|
$3,400.000
|
$1,000.000
|
$1,800.000
|
$15,000.000
|
$2,400.000
|
$8,000.000
|
$2,300.000
|
$5,902.300
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
140.000
|
$26.000
|
$20.990
|
$40.000
|
$24.000
|
$23.000
|
$20.000
|
$22.500
|
$19.000
|
$30.000
|
$21.000
|
$39.000
|
$28.890
|
$25.000
|
$0.190
|
$45.000
|
$27.740
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
340.000
|
$30.000
|
$24.000
|
$50.000
|
$27.000
|
$27.000
|
$24.000
|
$26.500
|
$23.000
|
$30.000
|
$24.500
|
$44.000
|
$31.800
|
$26.000
|
$22.500
|
$50.000
|
$32.850
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
480.000
|
$8.000
|
$10.500
|
$5.000
|
$9.000
|
$8.500
|
$8.000
|
$8.000
|
$10.000
|
$2.000
|
$8.000
|
$12.000
|
$8.910
|
$12.000
|
$10.000
|
$14.000
|
$11.680
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,251.000
|
$20.000
|
$19.000
|
$20.000
|
$16.550
|
$24.000
|
$19.000
|
$15.000
|
$18.000
|
$30.000
|
$21.250
|
$34.300
|
$20.490
|
$24.000
|
$18.000
|
$40.000
|
$21.900
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,251.000
|
$9.000
|
$9.500
|
$3.000
|
$9.500
|
$9.000
|
$8.500
|
$5.000
|
$10.000
|
$2.000
|
$8.000
|
$10.200
|
$11.190
|
$12.000
|
$10.000
|
$12.000
|
$13.140
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,066.000
|
$2.500
|
$1.900
|
$3.500
|
$2.720
|
$2.000
|
$1.750
|
$4.000
|
$2.000
|
$1.650
|
$1.650
|
$2.200
|
$2.410
|
$2.000
|
$3.000
|
$2.000
|
$2.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,066.000
|
$0.750
|
$0.530
|
$0.700
|
$0.750
|
$0.550
|
$0.500
|
$0.500
|
$0.500
|
$0.250
|
$0.500
|
$0.550
|
$0.580
|
$1.000
|
$1.500
|
$0.600
|
$0.730
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,293.000
|
$100.000
|
$157.000
|
$185.000
|
$128.440
|
$100.000
|
$182.000
|
$245.000
|
$144.000
|
$90.000
|
$161.000
|
$395.000
|
$113.200
|
$260.000
|
$150.000
|
$2.500
|
$118.990
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
6,009.000
|
$40.000
|
$43.000
|
$45.000
|
$55.000
|
$21.000
|
$37.000
|
$75.000
|
$75.000
|
$60.000
|
$43.000
|
$85.000
|
$39.390
|
$70.000
|
$35.000
|
$90.000
|
$13.070
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
6,438.000
|
$10.000
|
$6.000
|
$10.000
|
$22.000
|
$8.400
|
$12.000
|
$10.000
|
$15.000
|
$10.000
|
$5.000
|
$8.000
|
$4.080
|
$16.000
|
$20.000
|
$5.000
|
$13.070
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
6,318.000
|
$10.000
|
$7.000
|
$12.000
|
$17.000
|
$6.300
|
$6.000
|
$8.500
|
$25.000
|
$5.000
|
$6.000
|
$7.250
|
$10.400
|
$16.000
|
$3.890
|
$6.000
|
$13.070
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
7,932.000
|
$0.750
|
$1.500
|
$1.800
|
$1.960
|
$0.110
|
$1.750
|
$1.600
|
$2.000
|
$1.000
|
$1.350
|
$2.450
|
$1.450
|
$1.650
|
$0.970
|
$2.000
|
$2.120
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,275.000
|
$18.000
|
$19.350
|
$20.000
|
$20.000
|
$19.820
|
$18.610
|
$22.300
|
$22.000
|
$18.750
|
$19.000
|
$24.200
|
$19.000
|
$20.000
|
$15.830
|
$25.000
|
$27.740
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,450.000
|
$1,350.000
|
$1,500.000
|
$1,660.000
|
$1,636.030
|
$1,300.000
|
$2,175.000
|
$1,385.000
|
$1,550.000
|
$1,410.000
|
$1,524.000
|
$1,410.000
|
$1,700.000
|
$1,389.020
|
$2,000.000
|
$2,058.600
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
8.000
|
$1,000.000
|
$995.000
|
$1,000.000
|
$1,025.000
|
$1,011.750
|
$950.000
|
$900.000
|
$1,200.000
|
$850.000
|
$950.000
|
$1,293.000
|
$950.000
|
$940.000
|
$900.200
|
$1,000.000
|
$1,387.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$455.000
|
$535.000
|
$600.000
|
$724.000
|
$532.500
|
$500.000
|
$900.000
|
$750.000
|
$850.000
|
$500.000
|
$770.000
|
$500.000
|
$940.000
|
$823.760
|
$1,000.000
|
$730.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
829.000
|
$3.500
|
$2.000
|
$2.000
|
$1.500
|
$1.860
|
$1.750
|
$3.200
|
$2.000
|
$3.000
|
$2.000
|
$2.200
|
$2.000
|
$3.500
|
$1.760
|
$4.000
|
$2.920
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,275.000
|
$2,650.000
|
$2,700.000
|
$2,850.000
|
$2,715.750
|
$2,550.000
|
$2,530.000
|
$2,600.000
|
$2,375.000
|
$2,400.000
|
$2,783.000
|
$2,400.000
|
$2,500.000
|
$2,242.950
|
$3,000.000
|
$3,504.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$260.000
|
$265.000
|
$300.000
|
$250.000
|
$266.250
|
$250.000
|
$240.000
|
$200.000
|
$225.000
|
$200.000
|
$220.000
|
$200.000
|
$250.000
|
$502.900
|
$300.000
|
$292.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$2,150.000
|
$1,335.000
|
$1,500.000
|
$1,125.000
|
$1,575.000
|
$1,200.000
|
$2,250.000
|
$2,000.000
|
$2,000.000
|
$1,025.000
|
$2,750.000
|
$1,375.000
|
$3,000.000
|
$2,000.000
|
$1,500.000
|
$1,496.500
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$975.000
|
$689.000
|
$1,000.000
|
$802.000
|
$1,050.000
|
$1,000.000
|
$850.000
|
$1,500.000
|
$1,000.000
|
$725.000
|
$1,100.000
|
$695.000
|
$1,200.000
|
$800.000
|
$800.000
|
$1,058.500
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,500.000
|
$7,800.000
|
$11,000.000
|
$4,925.000
|
$11,550.000
|
$6,500.000
|
$8,750.000
|
$9,500.000
|
$10,000.000
|
$7,249.000
|
$10,000.000
|
$7,875.000
|
$10,000.000
|
$7,500.000
|
$9,000.000
|
$10,583.540
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
9.000
|
$510.000
|
$516.000
|
$500.000
|
$507.000
|
$522.920
|
$475.000
|
$480.000
|
$800.000
|
$450.000
|
$491.000
|
$850.000
|
$450.000
|
$500.000
|
$491.000
|
$650.000
|
$716.860
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
4.000
|
$570.000
|
$842.500
|
$600.000
|
$860.000
|
$846.680
|
$580.000
|
$585.000
|
$960.000
|
$550.000
|
$795.000
|
$1,050.000
|
$550.000
|
$600.000
|
$795.000
|
$750.000
|
$1,160.700
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$600.000
|
$669.990
|
$600.000
|
$722.000
|
$676.280
|
$580.000
|
$585.000
|
$900.000
|
$550.000
|
$635.000
|
$965.000
|
$550.000
|
$600.000
|
$635.000
|
$750.000
|
$927.100
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$770.000
|
$700.000
|
$820.000
|
$1,065.000
|
$1,011.750
|
$820.000
|
$825.000
|
$1,190.000
|
$775.000
|
$950.000
|
$1,300.000
|
$775.000
|
$900.000
|
$950.000
|
$1,000.000
|
$1,387.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
|
EA
|
14.000
|
$25.000
|
$20.000
|
$11.000
|
$17.000
|
$24.500
|
$23.000
|
$11.000
|
$20.000
|
$10.000
|
$15.000
|
$11.000
|
$20.000
|
$12.000
|
$15.000
|
$20.000
|
$29.200
|
|
|
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
|
EA
|
12.000
|
$70.000
|
$52.000
|
$60.000
|
$49.000
|
$48.990
|
$46.000
|
$59.000
|
$40.000
|
$55.000
|
$45.000
|
$60.500
|
$45.000
|
$60.000
|
$45.000
|
$80.000
|
$54.750
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 (BR)
|
EA
|
13.000
|
$20.000
|
$20.500
|
$11.000
|
$17.000
|
$24.500
|
$23.000
|
$11.000
|
$25.000
|
$10.000
|
$15.000
|
$11.000
|
$20.000
|
$12.000
|
$15.000
|
$20.000
|
$29.200
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
2.000
|
$65.000
|
$78.000
|
$60.000
|
$49.000
|
$51.120
|
$48.000
|
$59.000
|
$45.000
|
$55.000
|
$45.000
|
$60.500
|
$55.000
|
$60.000
|
$45.000
|
$80.000
|
$58.400
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
10.000
|
$25.000
|
$21.000
|
$27.000
|
$17.000
|
$25.290
|
$23.750
|
$27.000
|
$15.000
|
$25.000
|
$15.000
|
$27.500
|
$20.000
|
$30.000
|
$15.000
|
$35.000
|
$21.900
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
12.000
|
$25.000
|
$19.990
|
$27.000
|
$17.000
|
$25.290
|
$23.750
|
$27.000
|
$15.000
|
$25.000
|
$15.000
|
$27.500
|
$20.000
|
$30.000
|
$15.000
|
$35.000
|
$21.900
|
|
|
INSTL DEL ASSM (D-SY)SZ 2(WC)GND(BI)
|
EA
|
6.000
|
$20.000
|
$56.990
|
$60.000
|
$51.000
|
$52.190
|
$49.000
|
$59.000
|
$35.000
|
$55.000
|
$46.000
|
$60.500
|
$49.000
|
$60.000
|
$46.000
|
$75.000
|
$51.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
6,056.000
|
$0.300
|
$1.050
|
$0.470
|
$1.100
|
$1.070
|
$1.000
|
$0.480
|
$0.450
|
$1.000
|
$0.450
|
$1.100
|
$0.450
|
$1.100
|
$1.000
|
$0.250
|
$0.660
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
8,295.000
|
$0.300
|
$1.050
|
$0.470
|
$1.100
|
$1.070
|
$1.000
|
$0.480
|
$0.450
|
$1.000
|
$0.450
|
$1.100
|
$0.450
|
$1.100
|
$1.000
|
$0.250
|
$0.660
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
7,623.000
|
$0.850
|
$1.050
|
$1.300
|
$1.100
|
$1.070
|
$1.000
|
$1.330
|
$1.250
|
$1.000
|
$1.250
|
$1.100
|
$1.250
|
$1.100
|
$1.000
|
$0.250
|
$1.830
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
7,416.000
|
$0.850
|
$1.050
|
$1.300
|
$1.100
|
$1.070
|
$1.000
|
$1.330
|
$1.250
|
$1.000
|
$1.250
|
$1.100
|
$1.250
|
$1.100
|
$1.000
|
$0.250
|
$1.830
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
66.000
|
$6.000
|
$6.170
|
$13.000
|
$6.600
|
$6.390
|
$6.000
|
$12.770
|
$12.000
|
$6.000
|
$12.000
|
$6.600
|
$12.000
|
$6.500
|
$6.000
|
$0.200
|
$17.520
|
|
|
PAVEMENT SEALER 4"
|
LF
|
27,944.000
|
$0.150
|
$0.130
|
$0.260
|
$0.130
|
$0.130
|
$0.120
|
$0.270
|
$0.250
|
$0.120
|
$0.250
|
$0.140
|
$0.250
|
$0.140
|
$0.120
|
$0.250
|
$0.370
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,810.000
|
$0.550
|
$1.060
|
$0.700
|
$1.100
|
$1.070
|
$1.000
|
$0.690
|
$0.650
|
$1.000
|
$0.650
|
$1.100
|
$0.650
|
$1.100
|
$1.000
|
$0.250
|
$0.950
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
13,739.000
|
$0.550
|
$1.040
|
$0.600
|
$1.100
|
$1.070
|
$1.000
|
$0.590
|
$0.550
|
$1.000
|
$0.550
|
$1.100
|
$0.550
|
$1.100
|
$1.000
|
$0.250
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
13,529.000
|
$0.550
|
$1.040
|
$0.600
|
$1.100
|
$1.070
|
$1.000
|
$0.590
|
$0.550
|
$1.000
|
$0.550
|
$1.100
|
$0.550
|
$1.100
|
$1.000
|
$0.250
|
$0.800
|
|
RE PM W/RET REQ TY II (W) 4" (BRK)
|
LF
|
240.000
|
$1.000
|
$0.780
|
$0.500
|
$0.550
|
$0.530
|
$0.500
|
$0.370
|
$0.350
|
$0.500
|
$0.350
|
$0.550
|
$0.350
|
$0.600
|
$0.500
|
$0.250
|
$0.510
|
|
RE PM W/RET REQ TY II (W) 4" (SLD)
|
LF
|
980.000
|
$1.000
|
$0.580
|
$0.400
|
$0.550
|
$0.530
|
$0.500
|
$0.340
|
$0.320
|
$0.500
|
$0.320
|
$0.550
|
$0.320
|
$0.600
|
$0.500
|
$0.250
|
$0.470
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
980.000
|
$1.000
|
$0.580
|
$0.400
|
$0.550
|
$0.530
|
$0.500
|
$0.340
|
$0.320
|
$0.500
|
$0.320
|
$0.550
|
$0.320
|
$0.600
|
$0.500
|
$0.250
|
$0.470
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
34.000
|
$4.000
|
$7.000
|
$7.000
|
$5.500
|
$5.330
|
$5.000
|
$4.790
|
$4.500
|
$5.000
|
$4.500
|
$5.500
|
$4.500
|
$5.500
|
$5.000
|
$0.250
|
$6.570
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
141.000
|
$5.000
|
$5.650
|
$7.000
|
$5.500
|
$5.330
|
$5.000
|
$4.790
|
$4.500
|
$5.000
|
$4.500
|
$0.550
|
$4.500
|
$5.500
|
$5.000
|
$0.250
|
$6.570
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,135.000
|
$0.500
|
$0.530
|
$1.000
|
$0.550
|
$0.530
|
$0.500
|
$1.060
|
$1.000
|
$0.500
|
$1.000
|
$0.550
|
$1.000
|
$0.600
|
$0.500
|
$0.250
|
$1.460
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
30,144.000
|
$0.100
|
$0.090
|
$0.400
|
$0.090
|
$0.090
|
$0.080
|
$0.390
|
$0.370
|
$0.080
|
$0.370
|
$0.100
|
$0.370
|
$0.120
|
$0.080
|
$0.250
|
$0.540
|
|
|
FULL - WIDTH MOWING
|
AC
|
29.700
|
$100.000
|
$500.000
|
$140.000
|
$200.000
|
$175.000
|
$85.000
|
$125.000
|
$700.000
|
$150.000
|
$370.000
|
$200.000
|
$150.340
|
$650.000
|
$250.000
|
$150.000
|
$213.230
|
|
|
LITTER REMOVAL
|
AC
|
29.700
|
$200.000
|
$500.000
|
$80.000
|
$200.000
|
$175.000
|
$50.000
|
$100.000
|
$500.000
|
$500.000
|
$500.000
|
$65.000
|
$117.060
|
$450.000
|
$643.660
|
$75.000
|
$303.880
|
|
|
NO. OF WORKING DAYS
|
$/D
|
1,000.000
|
$573.000
|
$490.000
|
$470.000
|
$421.000
|
$299.000
|
$550.000
|
$573.000
|
$344.000
|
$360.000
|
$430.000
|
$573.000
|
$404.000
|
$570.000
|
$362.000
|
$400.000
|
$573.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$6,745.000
|
$20,000.000
|
$5,000.000
|
$10,500.000
|
$8,500.000
|
$10,500.000
|
$10,000.000
|
$9,000.000
|
$11,000.000
|
$20,000.000
|
$2,514.020
|
$10,000.000
|
$16,237.500
|
$11,000.000
|
$12,112.610
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$12,000.000
|
$17,500.000
|
$10,000.000
|
$10,000.000
|
$2,500.000
|
$21,000.000
|
$5,000.000
|
$20,000.000
|
$5,000.000
|
$12,000.000
|
$20,000.000
|
$20,000.000
|
$14,000.000
|
$5,400.000
|
$6,000.000
|
$12,871.370
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
60.000
|
$60.000
|
$25.000
|
$60.000
|
$45.000
|
$55.000
|
$25.000
|
$50.000
|
$50.000
|
$65.000
|
$140.000
|
$30.000
|
$60.000
|
$50.000
|
$75.000
|
$50.000
|
$80.230
|
|
Totals: |
$8,642,001.710
|
$7,969,999.985
|
$8,221,951.330
|
$8,244,334.614
|
$8,349,939.395
|
$8,428,924.435
|
$8,664,084.100
|
$9,018,202.880
|
$9,065,266.180
|
$9,090,402.310
|
$9,347,860.570
|
$9,407,310.232
|
$9,634,046.760
|
$9,636,800.212
|
$9,939,125.450
|
$10,441,000.000
|