PREPARING ROW
|
STA
|
17.000
|
$12,000.000
|
$6,750.000
|
$14,858.000
|
$38,235.000
|
$4,000.000
|
$2,500.000
|
$30,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
312.000
|
$18.000
|
$11.080
|
$27.000
|
$6.570
|
$32.000
|
$20.000
|
$18.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,557.000
|
$7.750
|
$6.230
|
$4.700
|
$1.010
|
$24.000
|
$6.500
|
$6.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(4"-16")
|
SY
|
6,019.000
|
$5.000
|
$3.850
|
$8.000
|
$4.680
|
$9.000
|
$9.000
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,788.000
|
$15.000
|
$15.580
|
$20.000
|
$12.110
|
$24.000
|
$30.000
|
$25.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
523.000
|
$21.000
|
$15.750
|
$20.200
|
$15.130
|
$45.000
|
$40.000
|
$23.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
2,656.000
|
$15.000
|
$14.390
|
$10.000
|
$11.830
|
$35.000
|
$30.000
|
$20.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
873.000
|
$40.000
|
$31.030
|
$5.800
|
$26.860
|
$42.000
|
$40.000
|
$27.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
14,595.000
|
$1.500
|
$1.300
|
$0.650
|
$0.400
|
$1.500
|
$3.500
|
$2.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
19,835.000
|
$2.000
|
$1.620
|
$2.200
|
$1.190
|
$1.600
|
$4.500
|
$0.920
|
|
|
BLOCK SODDING
|
SY
|
14,595.000
|
$5.000
|
$5.600
|
$4.440
|
$5.160
|
$4.400
|
$5.000
|
$5.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
19,835.000
|
$0.500
|
$0.200
|
$0.210
|
$0.210
|
$0.260
|
$0.300
|
$0.250
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
28,560.000
|
$0.500
|
$0.450
|
$0.210
|
$0.210
|
$0.250
|
$0.250
|
$0.240
|
|
|
VEGETATIVE WATERING
|
MG
|
9,375.000
|
$14.000
|
$21.980
|
$4.000
|
$23.200
|
$18.000
|
$1.000
|
$10.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
132.000
|
$250.000
|
$465.000
|
$275.000
|
$273.630
|
$310.000
|
$300.000
|
$250.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
6,065.000
|
$6.000
|
$4.000
|
$7.000
|
$3.700
|
$9.000
|
$10.000
|
$5.800
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
5,484.000
|
$75.000
|
$82.000
|
$109.000
|
$107.010
|
$110.000
|
$110.000
|
$105.000
|
|
|
CEM STABIL BKFL
|
CY
|
312.000
|
$175.000
|
$136.840
|
$214.700
|
$165.800
|
$186.000
|
$325.000
|
$122.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
670.000
|
$240.000
|
$238.000
|
$274.000
|
$214.790
|
$260.000
|
$250.000
|
$275.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
96.000
|
$1,200.000
|
$1,258.920
|
$1,326.000
|
$1,300.000
|
$890.000
|
$2,000.000
|
$900.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
71.500
|
$1,200.000
|
$1,575.000
|
$1,394.000
|
$1,500.000
|
$1,365.000
|
$2,000.000
|
$1,400.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
30.600
|
$1,200.000
|
$1,500.000
|
$1,706.000
|
$1,600.000
|
$1,275.000
|
$2,000.000
|
$2,100.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
11,200.000
|
$22.000
|
$25.000
|
$30.400
|
$47.000
|
$25.000
|
$25.500
|
$28.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
168.000
|
$615.000
|
$600.000
|
$596.000
|
$590.050
|
$642.000
|
$650.000
|
$576.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,385.000
|
$230.000
|
$179.780
|
$225.700
|
$200.000
|
$182.000
|
$300.000
|
$200.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
1,155.000
|
$120.000
|
$166.750
|
$160.000
|
$145.990
|
$140.000
|
$140.000
|
$155.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
160.000
|
$550.000
|
$512.400
|
$559.000
|
$476.360
|
$500.000
|
$650.000
|
$540.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
656.000
|
$70.000
|
$62.080
|
$71.500
|
$73.640
|
$100.000
|
$90.000
|
$111.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
207.000
|
$135.000
|
$195.800
|
$268.000
|
$186.570
|
$202.000
|
$200.000
|
$197.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
59.000
|
$100.000
|
$99.000
|
$69.000
|
$182.300
|
$110.000
|
$100.000
|
$130.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,200.000
|
$2,334.750
|
$1,320.000
|
$1,964.650
|
$2,000.000
|
$750.000
|
$2,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
34.000
|
$20.000
|
$22.140
|
$8.000
|
$42.820
|
$78.000
|
$40.000
|
$40.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$100,000.000
|
$85,100.000
|
$40,000.000
|
$20,008.650
|
$57,000.000
|
$50,000.000
|
$250,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$496,551.970
|
$700,000.000
|
$600,000.000
|
$656,681.000
|
$621,841.990
|
$705,000.000
|
$730,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$16,200.000
|
$7,627.500
|
$5,900.000
|
$7,121.100
|
$10,000.000
|
$21,000.000
|
$9,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
530.000
|
$35.000
|
$33.350
|
$29.000
|
$0.320
|
$34.000
|
$37.280
|
$29.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
65.000
|
$62.000
|
$44.850
|
$39.000
|
$56.000
|
$46.000
|
$42.600
|
$39.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
595.000
|
$11.000
|
$17.250
|
$15.000
|
$11.000
|
$18.000
|
$21.300
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,832.000
|
$20.000
|
$19.550
|
$17.000
|
$27.000
|
$20.000
|
$26.630
|
$17.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,832.000
|
$8.000
|
$13.800
|
$12.000
|
$10.000
|
$15.000
|
$13.850
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,862.000
|
$3.500
|
$2.010
|
$1.750
|
$3.000
|
$2.000
|
$1.810
|
$1.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,862.000
|
$0.600
|
$0.470
|
$0.410
|
$1.000
|
$0.500
|
$0.210
|
$0.410
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
127.000
|
$8.000
|
$5.750
|
$5.000
|
$5.000
|
$6.000
|
$3.200
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
127.000
|
$2.000
|
$1.150
|
$1.000
|
$1.000
|
$1.200
|
$1.070
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
8,353.000
|
$86.000
|
$81.000
|
$142.000
|
$126.390
|
$155.000
|
$150.000
|
$176.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
9,227.000
|
$50.000
|
$59.400
|
$21.400
|
$31.390
|
$42.000
|
$30.000
|
$35.150
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
3,231.000
|
$9.000
|
$8.680
|
$5.000
|
$6.070
|
$6.000
|
$10.000
|
$8.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
9,227.000
|
$10.000
|
$12.940
|
$9.700
|
$12.220
|
$12.000
|
$10.000
|
$10.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
121.000
|
$65.000
|
$57.960
|
$69.000
|
$96.410
|
$200.000
|
$90.000
|
$75.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
50,643.000
|
$0.200
|
$0.350
|
$0.200
|
$0.110
|
$0.600
|
$0.120
|
$0.070
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
700.000
|
$27.000
|
$29.760
|
$26.340
|
$26.150
|
$29.000
|
$25.030
|
$24.700
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,200.000
|
$2,180.400
|
$2,061.680
|
$1,923.950
|
$2,100.000
|
$2,917.980
|
$1,817.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,500.000
|
$1,518.000
|
$1,601.640
|
$1,339.460
|
$1,400.000
|
$1,224.750
|
$2,530.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
861.000
|
$2.300
|
$0.660
|
$1.310
|
$0.580
|
$1.000
|
$3.200
|
$1.100
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
2,557.000
|
$12.750
|
$25.980
|
$22.550
|
$22.610
|
$21.000
|
$31.950
|
$21.350
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
4.000
|
$3,100.000
|
$3,900.000
|
$3,886.860
|
$3,414.830
|
$3,600.000
|
$4,047.000
|
$3,225.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
2,557.000
|
$4.000
|
$1.320
|
$3.060
|
$1.060
|
$1.300
|
$1.070
|
$1.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
4.000
|
$450.000
|
$372.000
|
$1,905.190
|
$317.660
|
$350.000
|
$532.500
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,400.000
|
$3,972.000
|
$3,358.000
|
$3,494.240
|
$3,700.000
|
$3,088.500
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$250.000
|
$288.000
|
$663.000
|
$254.130
|
$270.000
|
$319.500
|
$480.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
7.000
|
$1,500.000
|
$1,560.000
|
$1,530.000
|
$1,376.520
|
$1,500.000
|
$1,500.000
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
9.000
|
$1,000.000
|
$720.000
|
$1,020.000
|
$1,040.000
|
$650.000
|
$1,250.000
|
$600.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
9.000
|
$8,000.000
|
$9,600.000
|
$8,900.140
|
$8,470.890
|
$10,000.000
|
$9,500.000
|
$8,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
38.000
|
$620.000
|
$1,020.000
|
$725.000
|
$850.000
|
$870.000
|
$740.180
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
29.000
|
$750.000
|
$852.000
|
$795.000
|
$710.000
|
$725.000
|
$1,017.080
|
$710.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$1,100.000
|
$1,242.000
|
$995.000
|
$1,035.000
|
$1,060.000
|
$1,331.250
|
$1,035.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
54.000
|
$120.000
|
$60.000
|
$65.000
|
$50.000
|
$52.000
|
$106.500
|
$50.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-1EXT)
|
EA
|
1.000
|
$1,300.000
|
$1,200.000
|
$1,500.000
|
$1,000.000
|
$1,100.000
|
$1,331.250
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
16.000
|
$20.000
|
$20.400
|
$25.000
|
$17.000
|
$18.000
|
$18.640
|
$17.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
8.000
|
$55.000
|
$66.000
|
$125.000
|
$55.000
|
$58.000
|
$45.260
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
14.000
|
$27.000
|
$40.800
|
$32.680
|
$34.000
|
$35.000
|
$24.500
|
$34.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,542.000
|
$1.500
|
$1.440
|
$0.700
|
$0.700
|
$0.800
|
$1.650
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
36,377.000
|
$1.000
|
$1.440
|
$0.700
|
$0.700
|
$0.800
|
$1.280
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
44,108.000
|
$1.000
|
$1.440
|
$0.700
|
$0.700
|
$0.800
|
$1.280
|
$0.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,551.000
|
$1.500
|
$1.440
|
$0.990
|
$0.990
|
$1.200
|
$1.280
|
$0.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
34.000
|
$6.500
|
$12.000
|
$7.600
|
$7.600
|
$8.000
|
$10.650
|
$15.500
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
23.000
|
$150.000
|
$216.000
|
$195.000
|
$195.000
|
$210.000
|
$191.700
|
$138.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
23.000
|
$215.000
|
$252.000
|
$203.000
|
$203.000
|
$215.000
|
$223.650
|
$175.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
125.000
|
$40.000
|
$102.000
|
$90.000
|
$90.000
|
$100.000
|
$90.530
|
$30.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
10,024.000
|
$0.500
|
$0.660
|
$0.450
|
$0.450
|
$0.500
|
$0.590
|
$0.450
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
32,825.000
|
$0.900
|
$0.660
|
$0.450
|
$0.450
|
$0.500
|
$0.590
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
27,096.000
|
$0.900
|
$0.660
|
$0.450
|
$0.450
|
$0.500
|
$0.590
|
$0.450
|
|
REFL PAV MRKR TY I-C
|
EA
|
624.000
|
$4.500
|
$6.000
|
$5.000
|
$5.000
|
$6.000
|
$5.170
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
133,883.000
|
$0.400
|
$0.600
|
$0.380
|
$0.380
|
$0.500
|
$0.400
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,283.000
|
$1.000
|
$1.200
|
$0.770
|
$0.770
|
$0.900
|
$1.070
|
$0.380
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
117.000
|
$3.500
|
$6.000
|
$3.550
|
$3.550
|
$4.000
|
$5.330
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
64.000
|
$20.000
|
$36.000
|
$36.000
|
$36.000
|
$40.000
|
$23.430
|
$10.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$3,200.000
|
$3,474.350
|
$5,001.670
|
$4,000.000
|
$4,000.000
|
$2,500.000
|
$2,444.040
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
1,320.000
|
$130.000
|
$105.910
|
$141.000
|
$135.900
|
$150.000
|
$140.000
|
$141.000
|
|
|
TMA (STATIONARY)
|
DAY
|
105.000
|
$150.000
|
$15.000
|
$41.000
|
$291.800
|
$430.000
|
$315.000
|
$336.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
132.000
|
$45.000
|
$250.000
|
$161.000
|
$651.830
|
$1,000.000
|
$525.000
|
$80.000
|
|
Totals: |
$5,721,271.670
|
$5,998,922.590
|
$6,083,413.630
|
$6,717,294.570
|
$6,722,424.890
|
$7,036,368.910
|
$7,391,239.590
|