PREPARING ROW
|
STA
|
452.000
|
$2,800.000
|
$300.000
|
$500.000
|
$156.150
|
$267.680
|
$330.000
|
$575.000
|
$100.000
|
$1,922.580
|
$450.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
169.000
|
$20.000
|
$20.000
|
$25.000
|
$21.200
|
$20.000
|
$35.000
|
$21.000
|
$20.000
|
$13.330
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
800.000
|
$6.000
|
$5.000
|
$5.000
|
$6.750
|
$15.000
|
$9.500
|
$6.000
|
$15.000
|
$8.070
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,808.000
|
$8.000
|
$8.500
|
$10.000
|
$4.550
|
$7.760
|
$4.000
|
$3.150
|
$12.000
|
$18.010
|
$5.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
452.000
|
$300.000
|
$250.000
|
$350.000
|
$232.400
|
$202.830
|
$190.000
|
$315.000
|
$200.000
|
$850.080
|
$400.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
57,824.000
|
$12.000
|
$11.000
|
$10.000
|
$8.400
|
$7.880
|
$11.000
|
$11.000
|
$23.000
|
$29.040
|
$22.200
|
|
|
BACKFILL (TY A OR B)
|
STA
|
452.000
|
$160.000
|
$135.000
|
$100.000
|
$323.950
|
$202.830
|
$170.000
|
$105.000
|
$120.000
|
$192.260
|
$85.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
452.000
|
$200.000
|
$75.000
|
$100.000
|
$117.550
|
$202.830
|
$170.000
|
$210.000
|
$120.000
|
$192.260
|
$58.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
301,767.000
|
$0.800
|
$0.500
|
$1.000
|
$0.900
|
$0.350
|
$1.000
|
$0.500
|
$1.250
|
$0.960
|
$0.900
|
|
|
BLOCK SODDING
|
SY
|
858.000
|
$4.500
|
$5.000
|
$7.000
|
$4.550
|
$5.000
|
$5.300
|
$15.000
|
$6.000
|
$6.230
|
$4.300
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
300,909.000
|
$0.120
|
$0.090
|
$0.140
|
$0.200
|
$0.100
|
$0.140
|
$0.170
|
$0.200
|
$0.120
|
$0.190
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
300,909.000
|
$0.080
|
$0.070
|
$0.100
|
$0.100
|
$0.070
|
$0.080
|
$0.050
|
$0.150
|
$0.090
|
$0.090
|
|
|
VEGETATIVE WATERING
|
MG
|
44,892.000
|
$2.000
|
$0.010
|
$1.000
|
$1.050
|
$0.690
|
$0.010
|
$1.050
|
$10.000
|
$1.280
|
$0.010
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
19,464.000
|
$21.000
|
$24.750
|
$26.000
|
$26.000
|
$26.100
|
$27.000
|
$20.000
|
$30.000
|
$39.350
|
$30.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
140,638.000
|
$16.000
|
$17.200
|
$16.000
|
$13.800
|
$18.490
|
$18.000
|
$18.000
|
$22.000
|
$13.600
|
$27.000
|
|
|
REWORK BS MTL (TY B) (8") (ORD COMP)
|
SY
|
110,501.000
|
$3.250
|
$1.250
|
$2.500
|
$3.150
|
$2.000
|
$2.000
|
$1.050
|
$1.000
|
$1.690
|
$5.000
|
|
|
CEMENT
|
TON
|
820.000
|
$150.000
|
$149.000
|
$175.000
|
$141.850
|
$142.000
|
$175.000
|
$180.000
|
$200.000
|
$243.530
|
$200.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
155,706.000
|
$1.750
|
$1.450
|
$1.500
|
$3.800
|
$1.700
|
$2.000
|
$1.050
|
$1.100
|
$3.200
|
$5.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
28,813.000
|
$4.000
|
$2.500
|
$3.500
|
$4.250
|
$4.010
|
$3.300
|
$5.700
|
$4.000
|
$4.610
|
$3.400
|
|
|
ASPH (CRS-2P)
|
GAL
|
70,320.000
|
$3.250
|
$3.000
|
$3.000
|
$3.600
|
$4.210
|
$3.000
|
$3.570
|
$3.400
|
$4.360
|
$2.900
|
|
|
ASPH (RC-250)
|
GAL
|
12,996.000
|
$3.750
|
$3.550
|
$3.500
|
$3.600
|
$4.420
|
$3.000
|
$3.570
|
$3.700
|
$4.360
|
$3.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
372.000
|
$115.000
|
$137.000
|
$75.000
|
$128.400
|
$142.650
|
$110.000
|
$128.100
|
$110.000
|
$156.370
|
$112.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
46,644.000
|
$4.500
|
$3.100
|
$3.000
|
$3.600
|
$3.840
|
$3.500
|
$3.590
|
$3.250
|
$4.380
|
$2.700
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
1,080.000
|
$110.000
|
$130.000
|
$100.000
|
$131.550
|
$160.720
|
$135.000
|
$131.250
|
$130.000
|
$160.220
|
$124.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
387.000
|
$300.000
|
$130.000
|
$75.000
|
$133.650
|
$141.610
|
$110.000
|
$133.350
|
$110.000
|
$162.780
|
$116.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
1,416.000
|
$125.000
|
$119.000
|
$75.000
|
$126.300
|
$142.170
|
$110.000
|
$126.000
|
$110.000
|
$153.810
|
$120.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
194.000
|
$157.000
|
$190.000
|
$100.000
|
$235.250
|
$150.000
|
$105.000
|
$210.000
|
$125.000
|
$192.260
|
$100.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
101.000
|
$15.000
|
$12.500
|
$25.000
|
$1.050
|
$20.000
|
$13.000
|
$21.000
|
$10.000
|
$12.820
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
957.000
|
$20.000
|
$42.000
|
$40.000
|
$15.800
|
$35.000
|
$41.000
|
$21.000
|
$32.000
|
$19.280
|
$15.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
352.000
|
$110.000
|
$105.000
|
$200.000
|
$129.400
|
$189.600
|
$105.000
|
$100.000
|
$275.000
|
$140.990
|
$110.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
20.000
|
$500.000
|
$575.000
|
$450.000
|
$588.200
|
$550.000
|
$570.000
|
$735.000
|
$500.000
|
$640.860
|
$500.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
12.000
|
$625.000
|
$625.000
|
$750.000
|
$682.300
|
$700.000
|
$640.000
|
$735.000
|
$1,100.000
|
$1,294.100
|
$580.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
672.000
|
$70.000
|
$49.000
|
$60.000
|
$48.250
|
$50.000
|
$50.000
|
$80.000
|
$90.000
|
$55.370
|
$41.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
572.000
|
$80.000
|
$104.000
|
$80.000
|
$67.050
|
$65.000
|
$110.000
|
$90.000
|
$105.000
|
$82.030
|
$57.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
208.000
|
$125.000
|
$144.000
|
$100.000
|
$91.750
|
$95.000
|
$148.000
|
$100.000
|
$130.000
|
$112.790
|
$78.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
16.000
|
$145.000
|
$190.000
|
$120.000
|
$164.700
|
$130.000
|
$195.000
|
$230.000
|
$270.000
|
$164.060
|
$140.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
12.000
|
$170.000
|
$230.000
|
$170.000
|
$211.750
|
$175.000
|
$240.000
|
$240.000
|
$375.000
|
$225.580
|
$180.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
188.000
|
$225.000
|
$255.000
|
$200.000
|
$252.900
|
$220.000
|
$260.000
|
$250.000
|
$425.000
|
$274.800
|
$215.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$3,100.000
|
$2,100.000
|
$3,000.000
|
$2,058.650
|
$3,200.000
|
$2,200.000
|
$4,000.000
|
$11,000.000
|
$3,649.700
|
$1,750.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
9.000
|
$5,300.000
|
$2,600.000
|
$4,000.000
|
$3,882.050
|
$5,000.000
|
$2,600.000
|
$5,000.000
|
$13,000.000
|
$6,179.340
|
$3,300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
4.000
|
$5,500.000
|
$3,100.000
|
$6,000.000
|
$4,823.150
|
$6,000.000
|
$3,200.000
|
$6,000.000
|
$14,000.000
|
$7,399.640
|
$4,100.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$8,300.000
|
$4,600.000
|
$7,000.000
|
$7,058.300
|
$9,000.000
|
$4,700.000
|
$7,000.000
|
$15,000.000
|
$7,356.790
|
$6,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
4.000
|
$11,000.000
|
$7,200.000
|
$10,000.000
|
$11,175.650
|
$12,000.000
|
$7,400.000
|
$8,500.000
|
$16,000.000
|
$11,742.010
|
$9,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$5,200.000
|
$3,100.000
|
$4,000.000
|
$4,705.550
|
$5,500.000
|
$3,200.000
|
$5,000.000
|
$15,000.000
|
$10,894.640
|
$4,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
2.000
|
$6,000.000
|
$3,600.000
|
$11,000.000
|
$5,881.900
|
$7,000.000
|
$3,600.000
|
$9,500.000
|
$16,000.000
|
$10,670.210
|
$5,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
2.000
|
$8,350.000
|
$6,200.000
|
$8,000.000
|
$8,528.800
|
$10,000.000
|
$6,400.000
|
$7,000.000
|
$17,000.000
|
$9,824.570
|
$7,250.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$9,000.000
|
$7,700.000
|
$25,000.000
|
$14,116.600
|
$12,000.000
|
$7,900.000
|
$15,500.000
|
$18,000.000
|
$10,262.320
|
$12,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$16,000.000
|
$27,500.000
|
$30,000.000
|
$21,763.100
|
$16,000.000
|
$28,000.000
|
$12,000.000
|
$21,000.000
|
$16,972.260
|
$18,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
60.000
|
$750.000
|
$875.000
|
$700.000
|
$911.700
|
$700.000
|
$900.000
|
$700.000
|
$1,500.000
|
$1,072.800
|
$775.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,450.000
|
$925.000
|
$800.000
|
$911.700
|
$900.000
|
$950.000
|
$900.000
|
$1,700.000
|
$1,049.730
|
$775.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$1,200.000
|
$975.000
|
$1,000.000
|
$1,146.950
|
$1,000.000
|
$1,000.000
|
$950.000
|
$1,725.000
|
$1,381.950
|
$975.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,150.000
|
$2,100.000
|
$1,500.000
|
$1,294.000
|
$1,600.000
|
$2,200.000
|
$2,100.000
|
$2,400.000
|
$1,617.280
|
$1,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,300.000
|
$2,600.000
|
$2,000.000
|
$2,117.450
|
$2,600.000
|
$2,600.000
|
$2,100.000
|
$3,300.000
|
$2,733.910
|
$1,800.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
19.000
|
$2,500.000
|
$2,100.000
|
$1,500.000
|
$1,058.750
|
$1,400.000
|
$2,200.000
|
$2,100.000
|
$1,000.000
|
$3,204.310
|
$900.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,300.000
|
$875.000
|
$2,500.000
|
$941.100
|
$1,500.000
|
$900.000
|
$3,150.000
|
$1,000.000
|
$1,473.370
|
$800.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
34.000
|
$1,100.000
|
$875.000
|
$1,250.000
|
$588.200
|
$1,200.000
|
$900.000
|
$630.000
|
$1,000.000
|
$1,034.580
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
392.000
|
$15.500
|
$26.000
|
$15.000
|
$7.050
|
$15.000
|
$26.000
|
$21.000
|
$10.000
|
$15.380
|
$6.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
1.000
|
$1,035.000
|
$775.000
|
$500.000
|
$1,176.350
|
$1,500.000
|
$780.000
|
$945.000
|
$2,000.000
|
$773.670
|
$1,000.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
43.000
|
$500.000
|
$975.000
|
$250.000
|
$176.450
|
$250.000
|
$1,000.000
|
$262.500
|
$500.000
|
$543.370
|
$150.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$892,372.000
|
$780,000.000
|
$701,000.000
|
$784,338.000
|
$741,706.000
|
$630,000.000
|
$722,000.000
|
$860,000.000
|
$1,121,507.220
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$10,000.000
|
$10,000.000
|
$3,000.000
|
$7,180.700
|
$7,200.000
|
$12,000.000
|
$25,200.000
|
$8,000.000
|
$12,817.230
|
$35,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,240.000
|
$31.000
|
$31.000
|
$25.000
|
$29.500
|
$27.000
|
$32.000
|
$26.250
|
$20.000
|
$32.290
|
$28.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,240.000
|
$8.800
|
$10.000
|
$5.000
|
$6.300
|
$6.000
|
$6.500
|
$13.130
|
$5.000
|
$9.620
|
$6.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
225.000
|
$23.000
|
$13.000
|
$15.000
|
$26.300
|
$20.000
|
$5.000
|
$10.500
|
$20.000
|
$23.810
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
225.000
|
$6.000
|
$3.000
|
$3.000
|
$10.500
|
$5.000
|
$1.000
|
$5.250
|
$5.000
|
$8.120
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,425.000
|
$3.000
|
$4.000
|
$3.000
|
$2.550
|
$2.000
|
$2.300
|
$1.580
|
$2.500
|
$2.640
|
$2.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,425.000
|
$0.630
|
$0.600
|
$0.500
|
$0.550
|
$0.500
|
$1.000
|
$0.160
|
$1.250
|
$0.820
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
500.000
|
$3.000
|
$6.500
|
$5.000
|
$4.200
|
$4.000
|
$3.900
|
$3.100
|
$6.500
|
$4.410
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
500.000
|
$0.850
|
$0.600
|
$1.000
|
$1.050
|
$0.500
|
$1.000
|
$1.050
|
$2.250
|
$1.280
|
$2.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,391.000
|
$44.000
|
$38.000
|
$35.000
|
$27.050
|
$44.770
|
$41.000
|
$45.000
|
$32.000
|
$29.480
|
$48.600
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,387.000
|
$26.000
|
$25.000
|
$25.000
|
$18.850
|
$31.050
|
$23.000
|
$33.000
|
$11.000
|
$20.510
|
$39.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
169.000
|
$125.000
|
$140.000
|
$125.000
|
$94.100
|
$121.000
|
$125.000
|
$157.500
|
$130.000
|
$97.600
|
$80.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
7,118.000
|
$0.180
|
$0.500
|
$0.500
|
$0.250
|
$0.240
|
$0.850
|
$0.250
|
$0.250
|
$0.600
|
$0.240
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
3,559.000
|
$0.180
|
$0.500
|
$0.500
|
$0.250
|
$0.240
|
$1.300
|
$0.250
|
$0.250
|
$1.540
|
$0.240
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$18.800
|
$18.500
|
$40.000
|
$24.250
|
$17.850
|
$19.000
|
$18.740
|
$24.000
|
$22.130
|
$17.850
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,265.000
|
$950.000
|
$1,500.000
|
$1,683.950
|
$925.000
|
$1,000.000
|
$971.250
|
$1,500.000
|
$1,297.100
|
$925.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,450.000
|
$2,500.000
|
$2,500.000
|
$2,473.350
|
$2,400.000
|
$2,500.000
|
$2,520.000
|
$2,400.000
|
$2,786.140
|
$2,400.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
22.000
|
$254.000
|
$220.000
|
$185.000
|
$194.700
|
$210.000
|
$220.000
|
$196.880
|
$200.000
|
$295.040
|
$185.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$280.000
|
$250.000
|
$225.000
|
$210.500
|
$240.000
|
$250.000
|
$275.630
|
$250.000
|
$316.330
|
$200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
79.000
|
$524.000
|
$460.000
|
$375.000
|
$368.400
|
$415.000
|
$440.000
|
$404.250
|
$400.000
|
$578.990
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$675.000
|
$600.000
|
$675.000
|
$526.250
|
$570.000
|
$600.000
|
$619.500
|
$700.000
|
$709.170
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
84.000
|
$70.000
|
$52.000
|
$75.000
|
$84.200
|
$50.000
|
$53.000
|
$89.250
|
$75.000
|
$101.970
|
$80.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
104.000
|
$50.000
|
$62.000
|
$40.000
|
$40.000
|
$60.000
|
$65.000
|
$47.250
|
$40.000
|
$38.450
|
$45.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
30.000
|
$21.000
|
$35.000
|
$30.000
|
$26.300
|
$33.500
|
$35.000
|
$35.180
|
$25.000
|
$31.730
|
$33.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
89,760.000
|
$0.300
|
$0.200
|
$0.250
|
$0.200
|
$0.180
|
$0.180
|
$0.200
|
$0.200
|
$0.380
|
$0.180
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,824.000
|
$2.000
|
$1.250
|
$1.000
|
$0.850
|
$0.750
|
$0.450
|
$1.550
|
$0.500
|
$1.060
|
$1.200
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
300.000
|
$6.000
|
$5.350
|
$7.000
|
$5.500
|
$5.250
|
$5.500
|
$5.870
|
$5.500
|
$7.180
|
$5.250
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,759.000
|
$0.410
|
$0.370
|
$0.500
|
$0.400
|
$0.360
|
$0.400
|
$0.400
|
$0.400
|
$0.640
|
$0.360
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,759.000
|
$0.580
|
$0.450
|
$0.500
|
$0.450
|
$0.440
|
$0.450
|
$0.490
|
$0.500
|
$1.280
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
7,518.000
|
$0.410
|
$0.350
|
$0.500
|
$0.350
|
$0.340
|
$0.400
|
$0.380
|
$0.400
|
$0.640
|
$0.340
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
83,394.000
|
$0.800
|
$0.530
|
$0.600
|
$0.550
|
$0.520
|
$0.550
|
$0.580
|
$0.550
|
$0.830
|
$0.520
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
4,980.000
|
$0.800
|
$0.530
|
$0.600
|
$0.550
|
$0.520
|
$0.550
|
$0.580
|
$0.550
|
$1.030
|
$0.520
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
54,042.000
|
$0.800
|
$0.530
|
$0.600
|
$0.550
|
$0.520
|
$0.550
|
$0.580
|
$0.550
|
$0.830
|
$0.520
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
982.000
|
$3.500
|
$3.600
|
$4.000
|
$3.700
|
$3.500
|
$3.700
|
$3.910
|
$3.750
|
$4.610
|
$3.500
|
|
|
FULL - WIDTH MOWING
|
CYC
|
4.000
|
$4,400.000
|
$3,500.000
|
$3,000.000
|
$5,000.000
|
$3,700.000
|
$4,000.000
|
$10,000.000
|
$3,000.000
|
$4,353.130
|
$6,120.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
1,218.000
|
$75.000
|
$120.000
|
$90.000
|
$147.050
|
$113.550
|
$112.000
|
$140.000
|
$116.000
|
$160.220
|
$125.000
|
|
|
TACK COAT
|
GAL
|
1,218.000
|
$3.500
|
$2.500
|
$4.000
|
$3.300
|
$3.500
|
$3.000
|
$2.750
|
$4.000
|
$3.590
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,000.000
|
$7,500.000
|
$10,000.000
|
$15,350.000
|
$15,000.000
|
$10,000.000
|
$15,000.000
|
$11,000.000
|
$7,690.340
|
$5,415.000
|
|
|
TMA (STATIONARY)
|
DAY
|
300.000
|
$200.000
|
$90.000
|
$150.000
|
$225.000
|
$100.000
|
$150.000
|
$73.500
|
$200.000
|
$179.440
|
$205.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
125.000
|
$50.000
|
$60.000
|
$50.000
|
$100.000
|
$100.000
|
$30.000
|
$73.500
|
$25.000
|
$51.270
|
$20.000
|
|
Totals: |
$9,816,088.350
|
$7,986,235.470
|
$7,987,702.760
|
$8,180,399.650
|
$8,303,750.460
|
$8,372,021.850
|
$8,594,279.010
|
$10,546,521.300
|
$11,619,297.670
|
$12,059,245.760
|