PREPARING ROW
|
STA
|
28.000
|
$8,000.000
|
$14,000.000
|
$2,000.000
|
$5,000.000
|
$4,000.000
|
$250.000
|
$3,300.000
|
$35,000.000
|
$10,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
871.000
|
$32.000
|
$15.000
|
$10.000
|
$25.000
|
$14.000
|
$60.000
|
$33.000
|
$50.000
|
$20.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
5,740.000
|
$25.000
|
$18.000
|
$18.000
|
$20.000
|
$10.000
|
$11.000
|
$22.000
|
$20.000
|
$25.000
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
13,045.000
|
$25.000
|
$26.000
|
$27.000
|
$30.000
|
$25.000
|
$35.000
|
$33.000
|
$30.000
|
$35.000
|
|
|
EMBANK (FNL)(DC)(TY C2)
|
CY
|
801.000
|
$75.000
|
$327.000
|
$40.000
|
$50.000
|
$25.000
|
$110.000
|
$33.000
|
$40.000
|
$35.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
22,220.000
|
$3.000
|
$2.200
|
$4.000
|
$2.000
|
$2.000
|
$2.000
|
$1.078
|
$3.000
|
$1.720
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
22,220.000
|
$0.500
|
$0.400
|
$0.750
|
$0.450
|
$0.500
|
$0.900
|
$0.418
|
$0.500
|
$0.460
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
22,220.000
|
$0.500
|
$0.400
|
$0.750
|
$0.450
|
$0.500
|
$0.800
|
$0.396
|
$0.500
|
$0.450
|
|
|
VEGETATIVE WATERING
|
TGL
|
6,610.900
|
$20.000
|
$1.000
|
$0.250
|
$10.000
|
$1.000
|
$3.000
|
$17.600
|
$10.000
|
$35.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (10")
|
SY
|
2,102.000
|
$30.000
|
$35.000
|
$55.000
|
$35.000
|
$60.000
|
$31.000
|
$38.500
|
$28.000
|
$55.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
|
SY
|
7,651.000
|
$30.000
|
$36.000
|
$45.000
|
$36.000
|
$60.000
|
$37.000
|
$38.500
|
$32.000
|
$60.000
|
|
|
FL BS (RDWY DEL)(TY D GR 1-2)(FNAL POS)
|
CY
|
1,110.000
|
$100.000
|
$96.000
|
$100.000
|
$85.000
|
$85.000
|
$120.000
|
$289.300
|
$80.000
|
$125.000
|
|
|
REWORK BS MTL (TY C)(6")(ORD COMP)
|
SY
|
2,218.000
|
$3.000
|
$6.000
|
$14.000
|
$10.000
|
$25.000
|
$9.000
|
$22.000
|
$6.000
|
$20.000
|
|
|
REWORK BS MTL (TY C)(8")(ORD COMP)
|
SY
|
5,433.000
|
$3.000
|
$7.000
|
$10.000
|
$5.000
|
$25.000
|
$4.000
|
$33.000
|
$8.000
|
$20.000
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
57.220
|
$350.000
|
$360.000
|
$400.000
|
$350.000
|
$350.000
|
$450.000
|
$375.221
|
$400.000
|
$375.000
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
2,102.000
|
$10.000
|
$10.000
|
$30.000
|
$10.000
|
$15.000
|
$15.000
|
$22.000
|
$12.000
|
$15.000
|
|
|
CEMENT
|
TON
|
63.800
|
$250.000
|
$260.000
|
$350.000
|
$320.000
|
$400.000
|
$290.000
|
$254.837
|
$300.000
|
$275.000
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(6")
|
SY
|
2,218.000
|
$2.500
|
$5.000
|
$24.000
|
$10.000
|
$15.000
|
$18.000
|
$22.000
|
$10.000
|
$7.500
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(8")
|
SY
|
5,433.000
|
$3.500
|
$5.500
|
$22.000
|
$7.000
|
$15.000
|
$18.000
|
$27.500
|
$12.000
|
$7.500
|
|
|
SALV, HAUL & STKPL RCL APH PV (3")
|
SY
|
1,724.000
|
$1.000
|
$6.500
|
$15.000
|
$15.000
|
$25.000
|
$8.000
|
$4.400
|
$10.000
|
$10.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
411.000
|
$5.000
|
$24.000
|
$29.000
|
$22.000
|
$20.000
|
$16.000
|
$24.200
|
$5.000
|
$22.000
|
|
|
EMULS ASPH (PRIME)(AE-P)
|
GAL
|
1,531.000
|
$7.000
|
$28.000
|
$31.000
|
$25.000
|
$15.000
|
$14.000
|
$27.500
|
$5.000
|
$25.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
4,642.000
|
$6.500
|
$30.000
|
$29.500
|
$27.000
|
$10.000
|
$6.000
|
$30.250
|
$5.000
|
$27.500
|
|
|
ASPH (RC-250)
|
GAL
|
714.000
|
$4.500
|
$56.000
|
$55.000
|
$51.000
|
$15.000
|
$13.000
|
$56.100
|
$5.000
|
$51.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
3,826.000
|
$5.500
|
$28.000
|
$30.000
|
$25.000
|
$15.000
|
$7.000
|
$27.500
|
$5.000
|
$25.000
|
|
|
AGGR (TY-B, GR-3)(SAC-B)
|
CY
|
48.000
|
$150.000
|
$1,200.000
|
$1,400.000
|
$1,100.000
|
$1,500.000
|
$555.000
|
$1,210.000
|
$250.000
|
$1,100.000
|
|
|
AGGR (TY-B, GR-5)(SAC-B)
|
CY
|
21.000
|
$120.000
|
$1,400.000
|
$1,500.000
|
$1,220.000
|
$1,500.000
|
$1,100.000
|
$1,342.000
|
$250.000
|
$1,220.000
|
|
|
AGGR (TY-PB, GR-4)(SAC-B)
|
CY
|
65.000
|
$150.000
|
$1,490.000
|
$1,600.000
|
$1,325.000
|
$1,000.000
|
$1,200.000
|
$1,457.500
|
$250.000
|
$1,325.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
339.000
|
$150.000
|
$266.000
|
$325.000
|
$244.000
|
$250.000
|
$270.000
|
$268.400
|
$200.000
|
$244.000
|
|
|
TACK COAT
|
GAL
|
123.000
|
$5.000
|
$1.700
|
$5.000
|
$2.000
|
$10.000
|
$12.000
|
$1.650
|
$6.000
|
$1.500
|
|
|
CEM STABIL BKFL
|
CY
|
151.000
|
$250.000
|
$273.000
|
$325.000
|
$350.000
|
$300.000
|
$350.000
|
$330.000
|
$250.000
|
$400.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,871.000
|
$10.000
|
$9.000
|
$8.000
|
$10.000
|
$5.000
|
$13.000
|
$9.900
|
$5.000
|
$15.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
8,106.000
|
$40.000
|
$33.000
|
$12.500
|
$55.000
|
$25.000
|
$75.000
|
$49.500
|
$55.000
|
$35.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
2,235.000
|
$225.000
|
$184.000
|
$275.000
|
$300.000
|
$155.000
|
$300.000
|
$108.944
|
$225.000
|
$275.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
320.000
|
$280.000
|
$216.000
|
$300.000
|
$350.000
|
$175.000
|
$420.000
|
$117.018
|
$275.000
|
$325.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
115.200
|
$1,500.000
|
$1,220.000
|
$1,400.000
|
$1,300.000
|
$2,000.000
|
$4,000.000
|
$1,705.000
|
$1,350.000
|
$3,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
101.700
|
$1,500.000
|
$1,430.000
|
$1,800.000
|
$1,550.000
|
$2,200.000
|
$4,200.000
|
$1,925.000
|
$2,000.000
|
$3,025.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
57.600
|
$2,000.000
|
$1,700.000
|
$2,000.000
|
$1,200.000
|
$2,200.000
|
$3,200.000
|
$1,925.000
|
$1,350.000
|
$4,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
16,770.000
|
$26.000
|
$31.000
|
$28.000
|
$25.000
|
$24.000
|
$48.000
|
$29.700
|
$22.000
|
$50.000
|
|
|
APPROACH SLAB
|
CY
|
277.000
|
$800.000
|
$922.000
|
$800.000
|
$800.000
|
$1,000.000
|
$1,200.000
|
$935.000
|
$1,250.000
|
$1,100.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
3,537.000
|
$127.000
|
$70.000
|
$125.000
|
$85.000
|
$120.000
|
$150.000
|
$141.900
|
$55.000
|
$200.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
1,726.020
|
$250.000
|
$214.000
|
$240.000
|
$250.000
|
$290.000
|
$240.000
|
$190.069
|
$210.000
|
$300.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
1,844.520
|
$270.000
|
$221.000
|
$240.000
|
$250.000
|
$290.000
|
$240.000
|
$190.069
|
$210.000
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
111.200
|
$750.000
|
$630.000
|
$750.050
|
$500.000
|
$700.000
|
$750.000
|
$880.000
|
$550.000
|
$750.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
322.000
|
$200.000
|
$132.000
|
$130.000
|
$130.000
|
$160.000
|
$130.000
|
$220.000
|
$185.000
|
$175.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
2,146.000
|
$185.000
|
$127.000
|
$130.000
|
$130.000
|
$180.000
|
$120.000
|
$231.000
|
$190.000
|
$175.000
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
5,929.000
|
$220.000
|
$127.000
|
$141.000
|
$135.000
|
$242.000
|
$120.000
|
$231.000
|
$200.000
|
$175.000
|
|
|
RIPRAP (STONE PROTECTION)(36 IN)
|
CY
|
2,761.000
|
$240.000
|
$127.000
|
$150.000
|
$140.000
|
$300.000
|
$120.000
|
$231.000
|
$250.000
|
$180.000
|
|
|
RAIL (TY T221)
|
LF
|
332.000
|
$200.000
|
$120.000
|
$165.000
|
$180.000
|
$170.000
|
$180.000
|
$209.000
|
$250.000
|
$250.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
850.000
|
$150.000
|
$125.000
|
$175.000
|
$220.000
|
$170.000
|
$240.000
|
$220.000
|
$250.000
|
$250.000
|
|
|
TYPE A JOINT
|
LF
|
413.000
|
$165.000
|
$55.000
|
$95.000
|
$180.000
|
$100.000
|
$52.000
|
$132.000
|
$100.000
|
$10.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
80.000
|
$115.000
|
$135.000
|
$100.000
|
$110.000
|
$120.000
|
$110.000
|
$143.000
|
$105.000
|
$175.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
30.000
|
$140.000
|
$175.000
|
$150.000
|
$170.000
|
$125.000
|
$225.000
|
$176.000
|
$150.000
|
$275.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,700.000
|
$2,600.000
|
$3,500.000
|
$2,690.000
|
$3,500.000
|
$1,300.000
|
$2,420.000
|
$2,500.000
|
$4,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$3,200.000
|
$5,000.000
|
$6,000.000
|
$5,870.000
|
$3,500.000
|
$2,900.000
|
$6,050.000
|
$3,000.000
|
$5,225.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$550.000
|
$1,000.000
|
$500.000
|
$500.000
|
$500.000
|
$1,600.000
|
$660.000
|
$50.000
|
$675.000
|
|
|
REMOV STR (PIPE)
|
LF
|
65.000
|
$25.000
|
$30.000
|
$20.000
|
$50.000
|
$10.000
|
$95.000
|
$30.800
|
$30.000
|
$50.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
3.000
|
$35,000.000
|
$23,000.000
|
$30,000.000
|
$50,000.000
|
$36,000.000
|
$95,000.000
|
$44,000.000
|
$50,000.000
|
$60,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$45,000.000
|
$40,000.000
|
$50,000.000
|
$50,000.000
|
$50,000.000
|
$150,000.000
|
$55,000.000
|
$250,000.000
|
$100,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$930,000.000
|
$961,038.960
|
$800,000.000
|
$400,000.000
|
$1,015,000.000
|
$1,100,000.000
|
$1,171,733.330
|
$1,000,000.000
|
$599,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
35.000
|
$6,500.000
|
$7,700.000
|
$2,000.000
|
$5,000.000
|
$2,500.000
|
$5,050.000
|
$5,500.000
|
$10,000.000
|
$6,675.000
|
|
|
TMA (STATIONARY)
|
DAY
|
4.000
|
$215.000
|
$400.000
|
$400.000
|
$1,000.000
|
$350.000
|
$450.000
|
$300.058
|
$250.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$200.000
|
$800.000
|
$150.000
|
$1,000.000
|
$350.000
|
$780.000
|
$434.126
|
$550.000
|
$895.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
709.000
|
$45.000
|
$40.000
|
$40.000
|
$45.000
|
$1.000
|
$41.000
|
$47.938
|
$30.000
|
$55.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
260.000
|
$80.000
|
$90.000
|
$55.000
|
$65.000
|
$1.000
|
$80.000
|
$94.897
|
$50.000
|
$143.750
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
969.000
|
$15.000
|
$12.000
|
$5.000
|
$15.000
|
$1.000
|
$13.000
|
$22.649
|
$20.000
|
$38.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,956.000
|
$35.000
|
$40.000
|
$15.000
|
$25.000
|
$1.000
|
$35.000
|
$39.369
|
$50.000
|
$45.100
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,956.000
|
$12.000
|
$12.000
|
$5.000
|
$15.000
|
$1.000
|
$10.000
|
$15.312
|
$20.000
|
$30.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,230.000
|
$4.000
|
$4.000
|
$3.500
|
$4.000
|
$1.000
|
$4.300
|
$5.489
|
$4.000
|
$3.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,230.000
|
$1.000
|
$1.200
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.760
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
440.000
|
$6.000
|
$7.000
|
$12.000
|
$10.000
|
$5.000
|
$6.500
|
$8.107
|
$10.000
|
$21.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
440.000
|
$1.500
|
$1.400
|
$6.000
|
$1.000
|
$1.000
|
$2.200
|
$2.431
|
$5.000
|
$10.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,565.000
|
$125.000
|
$115.000
|
$135.000
|
$180.000
|
$100.000
|
$110.000
|
$110.000
|
$50.000
|
$185.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
35.000
|
$5,500.000
|
$3,300.000
|
$3,000.000
|
$7,500.000
|
$4,000.000
|
$5,500.000
|
$6,285.719
|
$6,500.000
|
$3,700.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
4,560.000
|
$45.000
|
$40.000
|
$49.000
|
$75.000
|
$80.000
|
$62.000
|
$59.158
|
$100.000
|
$10.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,250.000
|
$15.000
|
$8.000
|
$50.000
|
$25.000
|
$20.000
|
$22.000
|
$18.458
|
$20.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
4,560.000
|
$15.000
|
$14.000
|
$11.000
|
$25.000
|
$35.000
|
$25.000
|
$25.454
|
$20.000
|
$5.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
240.000
|
$60.000
|
$156.000
|
$150.000
|
$70.000
|
$50.000
|
$125.000
|
$104.500
|
$50.000
|
$135.000
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
450.000
|
$0.500
|
$14.000
|
$10.000
|
$6.000
|
$30.000
|
$9.000
|
$9.350
|
$0.500
|
$17.500
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
25.000
|
$400.000
|
$230.000
|
$500.000
|
$100.000
|
$80.000
|
$900.000
|
$476.146
|
$500.000
|
$500.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,525.000
|
$26.000
|
$32.000
|
$34.000
|
$27.000
|
$30.000
|
$30.000
|
$31.350
|
$30.000
|
$31.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
13.000
|
$2,300.000
|
$2,500.000
|
$2,000.000
|
$1,850.000
|
$2,000.000
|
$2,300.000
|
$2,420.000
|
$1,850.000
|
$2,175.000
|
|
|
SHORT RADIUS (28")
|
LF
|
42.000
|
$50.000
|
$34.000
|
$150.000
|
$55.000
|
$35.000
|
$32.000
|
$33.000
|
$100.000
|
$54.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$1,300.000
|
$2,000.000
|
$2,100.000
|
$1,500.000
|
$1,300.000
|
$1,320.000
|
$1,850.000
|
$1,550.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,600.000
|
$3.500
|
$4.500
|
$5.000
|
$3.000
|
$2.000
|
$4.000
|
$4.400
|
$3.000
|
$4.250
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
16.000
|
$350.000
|
$255.000
|
$250.000
|
$2,750.000
|
$100.000
|
$270.000
|
$275.000
|
$500.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
13.000
|
$3,200.000
|
$3,000.000
|
$3,400.000
|
$3,200.000
|
$3,000.000
|
$3,100.000
|
$3,245.000
|
$3,850.000
|
$2,975.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
16.000
|
$350.000
|
$255.000
|
$500.000
|
$350.000
|
$500.000
|
$260.000
|
$275.000
|
$1,500.000
|
$350.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$1,700.000
|
$1,250.000
|
$2,000.000
|
$2,000.000
|
$2,500.000
|
$1,300.000
|
$1,320.000
|
$6,500.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$900.000
|
$900.000
|
$1,000.000
|
$2,500.000
|
$1,000.000
|
$900.000
|
$935.000
|
$2,500.000
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
11.000
|
$9,000.000
|
$9,000.000
|
$9,250.000
|
$7,500.000
|
$9,000.000
|
$8,000.000
|
$8,250.000
|
$21,000.000
|
$4,500.000
|
|
|
PIPE UNDERDRAINS (TY 7) (6")
|
LF
|
358.000
|
$40.000
|
$42.000
|
$100.000
|
$35.000
|
$40.000
|
$42.000
|
$66.000
|
$60.000
|
$75.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$290.000
|
$312.000
|
$750.000
|
$350.000
|
$2,500.000
|
$980.000
|
$341.000
|
$850.000
|
$320.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$725.000
|
$660.000
|
$1,200.000
|
$850.000
|
$2,000.000
|
$1,300.000
|
$825.000
|
$1,150.000
|
$720.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
33.000
|
$25.000
|
$42.000
|
$30.000
|
$35.000
|
$45.000
|
$45.000
|
$44.000
|
$100.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
37.000
|
$30.000
|
$46.000
|
$30.000
|
$35.000
|
$45.000
|
$48.000
|
$44.000
|
$100.000
|
$65.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
217.000
|
$5.500
|
$7.000
|
$6.000
|
$8.000
|
$10.000
|
$5.500
|
$4.785
|
$6.000
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
17,739.000
|
$1.500
|
$1.500
|
$1.500
|
$2.500
|
$2.500
|
$1.100
|
$0.924
|
$1.000
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
120.000
|
$12.000
|
$10.000
|
$15.000
|
$10.000
|
$15.000
|
$8.000
|
$6.985
|
$20.000
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
16,500.000
|
$1.000
|
$1.400
|
$1.500
|
$2.500
|
$2.500
|
$1.100
|
$0.924
|
$1.000
|
$2.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,644.000
|
$1.500
|
$1.400
|
$1.500
|
$1.000
|
$2.000
|
$4.000
|
$4.400
|
$6.000
|
$2.380
|
|
|
PAVEMENT SLER 4"
|
LF
|
10,776.000
|
$0.500
|
$0.500
|
$0.750
|
$0.500
|
$0.600
|
$0.400
|
$0.330
|
$1.000
|
$0.500
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
5,388.000
|
$1.000
|
$1.300
|
$1.500
|
$3.000
|
$3.000
|
$1.000
|
$0.869
|
$2.000
|
$3.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
5,388.000
|
$1.000
|
$1.300
|
$1.500
|
$3.000
|
$3.000
|
$1.000
|
$0.869
|
$2.000
|
$3.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
73.000
|
$5.500
|
$17.000
|
$20.000
|
$10.000
|
$15.000
|
$13.000
|
$11.000
|
$6.000
|
$10.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
23,966.000
|
$0.500
|
$1.100
|
$0.900
|
$0.700
|
$1.000
|
$0.700
|
$0.660
|
$1.000
|
$0.700
|
|
|
FULL - WIDTH MOWING
|
AC
|
1.530
|
$35.000
|
$4,000.000
|
$1,000.000
|
$5,000.000
|
$100.000
|
$6,000.000
|
$4,400.000
|
$1,000.000
|
$5,000.000
|
|
Totals: |
$10,486,886.950
|
$9,649,382.360
|
$9,894,123.785
|
$9,974,223.700
|
$11,175,914.600
|
$11,812,159.300
|
$11,932,160.828
|
$11,996,385.400
|
$12,490,378.620
|