PREPARING ROW
|
STA
|
18.600
|
$9,700.000
|
$4,300.000
|
$20,875.000
|
$6,000.000
|
$5,500.000
|
$5,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-11")
|
SY
|
2,751.300
|
$7.500
|
$16.000
|
$12.650
|
$23.000
|
$1.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
414.600
|
$35.000
|
$25.000
|
$27.600
|
$45.000
|
$75.000
|
$48.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
1,219.800
|
$50.000
|
$40.000
|
$32.200
|
$40.000
|
$40.000
|
$50.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
257.900
|
$60.000
|
$40.000
|
$32.200
|
$25.000
|
$100.000
|
$78.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
4,211.000
|
$6.500
|
$4.500
|
$4.600
|
$6.000
|
$6.000
|
$10.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
4,211.000
|
$0.500
|
$1.500
|
$1.150
|
$0.450
|
$2.500
|
$1.200
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
4,211.000
|
$0.500
|
$0.500
|
$1.150
|
$0.450
|
$2.500
|
$1.200
|
|
|
VEGETATIVE WATERING
|
MG
|
1,252.800
|
$20.000
|
$1.000
|
$75.900
|
$20.000
|
$1.000
|
$10.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
3,521.700
|
$30.000
|
$40.000
|
$23.000
|
$24.000
|
$35.000
|
$38.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
704.200
|
$11.000
|
$12.000
|
$9.720
|
$8.000
|
$15.000
|
$48.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
1,103.400
|
$7.000
|
$12.000
|
$9.560
|
$7.000
|
$12.000
|
$29.000
|
|
|
ASPH (RC-250)
|
GAL
|
328.700
|
$15.000
|
$15.000
|
$12.220
|
$10.000
|
$21.000
|
$54.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
9.400
|
$1,000.000
|
$650.000
|
$664.030
|
$500.000
|
$1,185.000
|
$2,800.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
1,760.900
|
$11.000
|
$15.000
|
$9.800
|
$15.000
|
$11.000
|
$38.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
29.300
|
$200.000
|
$800.000
|
$187.280
|
$300.000
|
$865.000
|
$2,800.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
32.200
|
$950.000
|
$800.000
|
$643.680
|
$1,000.000
|
$775.000
|
$2,800.000
|
|
|
CEM STABIL BKFL
|
CY
|
94.400
|
$253.000
|
$350.000
|
$258.750
|
$85.000
|
$369.000
|
$500.000
|
|
|
SHEET PILING (PZ - 40)
|
SF
|
3,332.000
|
$150.000
|
$90.000
|
$72.450
|
$100.000
|
$160.000
|
$135.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
921.000
|
$250.000
|
$170.000
|
$184.000
|
$435.000
|
$265.000
|
$270.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
423.000
|
$311.000
|
$230.000
|
$264.500
|
$515.000
|
$355.000
|
$600.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
72.300
|
$1,550.000
|
$2,000.000
|
$1,063.750
|
$3,200.000
|
$1,975.000
|
$1,550.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
26.500
|
$1,550.000
|
$2,500.000
|
$1,132.750
|
$2,700.000
|
$2,200.000
|
$1,950.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
17.000
|
$1,550.000
|
$2,500.000
|
$1,124.700
|
$3,100.000
|
$2,200.000
|
$2,200.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
4.900
|
$1,000.000
|
$1,000.000
|
$459.200
|
$1,900.000
|
$1,200.000
|
$2,000.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(HPC)
|
SF
|
8,580.000
|
$22.000
|
$30.000
|
$53.540
|
$23.000
|
$29.000
|
$34.500
|
|
|
APPROACH SLAB (HPC)
|
CY
|
157.500
|
$800.000
|
$1,200.000
|
$702.080
|
$1,400.000
|
$775.000
|
$850.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
255.300
|
$130.000
|
$35.000
|
$115.000
|
$90.000
|
$140.000
|
$120.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
1,630.000
|
$281.000
|
$255.000
|
$227.130
|
$240.000
|
$320.000
|
$325.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
21.500
|
$650.000
|
$800.000
|
$590.990
|
$500.000
|
$770.000
|
$850.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
778.300
|
$200.000
|
$200.000
|
$110.620
|
$190.000
|
$160.000
|
$220.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
61.700
|
$700.000
|
$650.000
|
$590.990
|
$575.000
|
$750.000
|
$760.000
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
114.000
|
$170.000
|
$160.000
|
$139.150
|
$185.000
|
$230.000
|
$175.000
|
|
|
RAIL (TY T631)
|
LF
|
682.800
|
$120.000
|
$100.000
|
$86.250
|
$100.000
|
$100.000
|
$110.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
42.000
|
$230.000
|
$120.000
|
$67.850
|
$110.000
|
$140.000
|
$135.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,600.000
|
$2,600.000
|
$1,130.450
|
$1,800.000
|
$1,900.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
38.000
|
$80.000
|
$5.000
|
$46.000
|
$14.000
|
$27.000
|
$100.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$40,000.000
|
$18,000.000
|
$25,300.000
|
$35,000.000
|
$20,000.000
|
$22,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$100,000.000
|
$26,000.000
|
$45,195.000
|
$50,000.000
|
$29,000.000
|
$30,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$295,000.000
|
$382,030.680
|
$200,000.000
|
$365,000.000
|
$375,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$10,000.000
|
$16,000.000
|
$10,000.000
|
$5,000.000
|
$2,500.000
|
$2,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
561.000
|
$38.000
|
$1.000
|
$46.000
|
$31.000
|
$47.000
|
$48.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
128.000
|
$60.000
|
$1.000
|
$86.250
|
$64.000
|
$80.000
|
$90.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
689.000
|
$16.000
|
$1.000
|
$12.650
|
$15.000
|
$16.000
|
$13.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
621.000
|
$30.000
|
$1.000
|
$40.250
|
$33.000
|
$20.000
|
$42.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
621.000
|
$10.000
|
$1.000
|
$11.500
|
$10.000
|
$8.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,823.000
|
$5.000
|
$1.000
|
$4.890
|
$3.000
|
$8.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,823.000
|
$1.500
|
$1.000
|
$1.150
|
$1.000
|
$1.500
|
$1.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
750.000
|
$30.000
|
$25.000
|
$37.370
|
$60.000
|
$30.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,400.000
|
$1,600.000
|
$27.020
|
$2,200.000
|
$2,875.000
|
$1,800.000
|
|
|
MTL BEAM GD FEN TRANS (T6)
|
EA
|
12.000
|
$525.000
|
$800.000
|
$743.480
|
$900.000
|
$900.000
|
$900.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$3,500.000
|
$2,800.000
|
$4,025.000
|
$3,300.000
|
$3,500.000
|
$3,300.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
877.600
|
$30.000
|
$20.000
|
$31.210
|
$15.000
|
$27.000
|
$20.000
|
|
|
GATE (TY 1)
|
EA
|
3.000
|
$2,100.000
|
$2,000.000
|
$2,143.000
|
$1,700.000
|
$2,700.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$25.000
|
$20.000
|
$28.320
|
$20.000
|
$25.000
|
$24.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
18.000
|
$55.000
|
$20.000
|
$30.120
|
$20.000
|
$25.000
|
$24.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
16.000
|
$100.000
|
$200.000
|
$100.000
|
$45.000
|
$100.000
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
48.000
|
$55.000
|
$25.000
|
$42.610
|
$25.000
|
$30.000
|
$30.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
7,340.000
|
$0.500
|
$1.000
|
$0.580
|
$0.750
|
$0.850
|
$2.400
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,617.000
|
$1.500
|
$2.500
|
$1.780
|
$3.000
|
$2.700
|
$4.800
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,724.000
|
$1.500
|
$2.500
|
$1.780
|
$3.000
|
$2.700
|
$4.800
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
7,340.000
|
$0.500
|
$1.000
|
$0.400
|
$0.020
|
$0.850
|
$1.200
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$18,000.000
|
$35,000.000
|
$17,250.000
|
$11,000.000
|
$12,000.000
|
$18,600.000
|
|
Totals: |
$3,820,306.850
|
$3,379,522.300
|
$3,602,958.079
|
$3,647,676.300
|
$3,733,792.500
|
$4,185,505.600
|