|
|
PREPARING ROW
|
STA
|
12.700
|
$3,000.000
|
$2,500.000
|
$11,550.000
|
$1,000.000
|
$4,000.000
|
$2,000.000
|
$5,000.000
|
$18,500.000
|
$2,500.000
|
$7,969.670
|
|
|
REMOV STAB BASE & ASPH PAV (8"-20")
|
SY
|
2,671.000
|
$6.000
|
$15.000
|
$1.000
|
$9.000
|
$9.000
|
$8.500
|
$2.500
|
$2.650
|
$8.000
|
$4.230
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,373.000
|
$11.000
|
$10.000
|
$10.000
|
$12.000
|
$15.000
|
$14.500
|
$9.410
|
$8.400
|
$15.000
|
$11.410
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
3,995.000
|
$9.000
|
$15.000
|
$12.000
|
$15.000
|
$15.000
|
$20.000
|
$21.000
|
$7.240
|
$30.000
|
$11.200
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
273.000
|
$25.000
|
$15.000
|
$38.000
|
$25.000
|
$50.000
|
$25.000
|
$45.000
|
$11.870
|
$30.000
|
$36.920
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
8,905.000
|
$2.000
|
$2.000
|
$1.050
|
$2.250
|
$1.050
|
$1.000
|
$4.650
|
$1.030
|
$1.500
|
$3.130
|
|
|
BLOCK SODDING
|
SY
|
8,905.000
|
$3.000
|
$5.000
|
$3.750
|
$4.750
|
$3.500
|
$3.500
|
$0.630
|
$3.080
|
$4.000
|
$8.370
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
8,905.000
|
$0.160
|
$0.500
|
$0.030
|
$0.250
|
$0.270
|
$0.250
|
$0.100
|
$0.210
|
$0.500
|
$0.470
|
|
|
VEGETATIVE WATERING
|
MG
|
2,650.000
|
$13.000
|
$1.000
|
$2.100
|
$7.500
|
$1.000
|
$34.000
|
$79.550
|
$26.310
|
$10.000
|
$52.420
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
4,179.000
|
$14.000
|
$20.000
|
$20.000
|
$23.000
|
$22.000
|
$22.000
|
$19.350
|
$23.900
|
$35.000
|
$17.550
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
99.000
|
$160.000
|
$250.000
|
$225.000
|
$200.000
|
$215.000
|
$250.000
|
$200.000
|
$210.260
|
$250.000
|
$307.830
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
2,452.000
|
$3.500
|
$6.000
|
$4.500
|
$20.000
|
$7.750
|
$10.000
|
$4.100
|
$8.520
|
$7.000
|
$15.750
|
|
|
LIME TRT (EXIST MATL)(11")
|
SY
|
2,078.000
|
$4.000
|
$6.000
|
$5.000
|
$25.000
|
$9.000
|
$11.000
|
$4.520
|
$10.060
|
$8.000
|
$14.500
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
1,253.000
|
$6.000
|
$15.000
|
$16.000
|
$15.000
|
$7.000
|
$17.000
|
$4.500
|
$5.850
|
$10.000
|
$6.320
|
|
|
ASPH (CRS-2P)
|
GAL
|
2,475.000
|
$6.000
|
$10.000
|
$8.500
|
$8.000
|
$6.000
|
$9.000
|
$18.000
|
$4.580
|
$10.000
|
$6.980
|
|
|
ASPH (RC-250)
|
GAL
|
357.000
|
$15.000
|
$15.000
|
$15.850
|
$18.000
|
$11.000
|
$17.000
|
$9.680
|
$7.950
|
$4.500
|
$7.280
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
31.900
|
$156.000
|
$850.000
|
$850.000
|
$800.000
|
$350.000
|
$910.000
|
$137.000
|
$676.330
|
$350.000
|
$188.040
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
2,985.000
|
$5.000
|
$10.000
|
$8.750
|
$4.500
|
$5.750
|
$9.000
|
$3.800
|
$5.340
|
$5.000
|
$6.630
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
31.900
|
$210.000
|
$650.000
|
$650.000
|
$820.000
|
$570.000
|
$695.000
|
$140.000
|
$813.630
|
$250.000
|
$191.140
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
31.900
|
$145.000
|
$500.000
|
$500.000
|
$810.000
|
$530.000
|
$535.000
|
$135.000
|
$682.690
|
$250.000
|
$197.960
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
36.400
|
$310.000
|
$800.000
|
$800.000
|
$720.000
|
$490.000
|
$855.000
|
$130.000
|
$686.500
|
$200.000
|
$252.670
|
|
|
CEM STABIL BKFL
|
CY
|
30.000
|
$178.000
|
$250.000
|
$155.000
|
$575.000
|
$175.000
|
$149.000
|
$211.350
|
$194.250
|
$300.000
|
$98.560
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,271.000
|
$22.000
|
$25.000
|
$25.000
|
$30.000
|
$25.000
|
$17.000
|
$26.990
|
$40.000
|
$55.000
|
$26.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
76.000
|
$65.000
|
$85.000
|
$150.000
|
$225.000
|
$165.000
|
$159.000
|
$139.750
|
$94.570
|
$225.000
|
$140.230
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
504.000
|
$135.000
|
$145.000
|
$200.000
|
$150.000
|
$235.000
|
$199.000
|
$204.250
|
$158.490
|
$275.000
|
$274.840
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
190.000
|
$240.000
|
$215.000
|
$300.000
|
$210.000
|
$490.000
|
$306.000
|
$252.630
|
$245.540
|
$325.000
|
$270.830
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
87.800
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$1,100.000
|
$1,400.000
|
$950.000
|
$1,451.250
|
$1,222.050
|
$1,284.000
|
$1,435.550
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
21.800
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$1,600.000
|
$2,100.000
|
$1,400.000
|
$1,300.000
|
$2,077.780
|
$1,900.000
|
$1,537.140
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
13.200
|
$1,000.000
|
$1,200.000
|
$1,200.000
|
$1,700.000
|
$1,750.000
|
$1,800.000
|
$1,400.000
|
$1,634.660
|
$100.000
|
$1,377.250
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
3,520.000
|
$20.000
|
$20.000
|
$25.000
|
$25.000
|
$29.000
|
$28.000
|
$21.000
|
$35.000
|
$24.000
|
$29.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(HPC)
|
SF
|
6,021.000
|
$18.000
|
$14.000
|
$15.000
|
$15.000
|
$19.000
|
$17.500
|
$20.000
|
$28.000
|
$17.000
|
$26.560
|
|
|
APPROACH SLAB (HPC)
|
CY
|
174.600
|
$500.000
|
$650.000
|
$500.000
|
$550.000
|
$600.000
|
$500.000
|
$550.000
|
$519.820
|
$550.000
|
$966.190
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
801.000
|
$150.000
|
$180.000
|
$165.000
|
$165.000
|
$185.000
|
$190.000
|
$220.000
|
$158.750
|
$168.000
|
$241.810
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
534.000
|
$180.000
|
$180.000
|
$200.000
|
$155.000
|
$200.000
|
$201.000
|
$220.000
|
$169.910
|
$168.000
|
$284.580
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
635.360
|
$170.000
|
$175.000
|
$200.000
|
$170.000
|
$175.000
|
$280.000
|
$180.600
|
$176.400
|
$176.000
|
$261.550
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
2,449.000
|
$115.000
|
$90.000
|
$105.000
|
$93.000
|
$102.000
|
$93.250
|
$95.680
|
$113.390
|
$180.000
|
$227.480
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
33.000
|
$522.000
|
$450.000
|
$630.000
|
$700.000
|
$700.000
|
$650.000
|
$700.000
|
$601.140
|
$450.000
|
$666.380
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
510.000
|
$110.000
|
$100.000
|
$105.000
|
$115.000
|
$128.000
|
$125.000
|
$145.000
|
$70.750
|
$100.000
|
$188.910
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
187.000
|
$96.000
|
$100.000
|
$75.000
|
$100.000
|
$110.000
|
$80.000
|
$83.970
|
$80.540
|
$180.000
|
$163.950
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
48.000
|
$105.000
|
$100.000
|
$100.000
|
$150.000
|
$80.000
|
$85.000
|
$100.000
|
$88.710
|
$110.000
|
$121.520
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,295.000
|
$1,500.000
|
$1,000.000
|
$1,200.000
|
$1,385.000
|
$1,085.000
|
$1,900.000
|
$1,099.380
|
$950.000
|
$2,192.060
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,265.000
|
$1,600.000
|
$1,250.000
|
$1,500.000
|
$1,500.000
|
$1,250.000
|
$2,300.000
|
$1,668.670
|
$1,200.000
|
$2,245.310
|
|
|
REMOV STR (PIPE)
|
LF
|
37.000
|
$32.000
|
$20.000
|
$25.000
|
$35.000
|
$17.000
|
$30.000
|
$91.000
|
$51.210
|
$50.000
|
$23.690
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$20,000.000
|
$30,000.000
|
$16,500.000
|
$25,000.000
|
$30,000.000
|
$14,861.720
|
$59,125.000
|
$60,000.000
|
$75,000.000
|
$27,864.730
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$217,648.000
|
$245,000.000
|
$275,000.000
|
$100,000.000
|
$280,000.000
|
$137,387.760
|
$100,000.000
|
$297,690.000
|
$200,000.000
|
$820,295.710
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$1,500.000
|
$2,500.000
|
$6,300.000
|
$10,000.000
|
$1,500.000
|
$3,500.000
|
$1,126.050
|
$1,837.630
|
$5,000.000
|
$13,203.940
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
135.000
|
$32.000
|
$1.000
|
$27.500
|
$35.000
|
$34.000
|
$35.000
|
$45.000
|
$32.740
|
$35.000
|
$90.890
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
135.000
|
$11.000
|
$1.000
|
$12.500
|
$7.000
|
$15.000
|
$13.000
|
$30.420
|
$12.260
|
$10.000
|
$30.140
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
968.000
|
$20.000
|
$1.000
|
$5.250
|
$15.000
|
$12.450
|
$34.000
|
$15.000
|
$31.570
|
$30.000
|
$76.170
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
968.000
|
$7.000
|
$1.000
|
$2.100
|
$3.000
|
$2.480
|
$8.550
|
$3.000
|
$8.000
|
$5.000
|
$22.280
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,010.000
|
$2.000
|
$1.000
|
$2.100
|
$2.500
|
$5.000
|
$2.900
|
$2.690
|
$2.700
|
$3.000
|
$7.410
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,010.000
|
$0.650
|
$1.000
|
$0.210
|
$1.000
|
$0.800
|
$0.700
|
$0.540
|
$0.640
|
$1.000
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
854.000
|
$80.000
|
$65.000
|
$65.000
|
$100.000
|
$95.000
|
$68.000
|
$67.850
|
$93.150
|
$81.000
|
$92.220
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
16.000
|
$1,250.000
|
$4,000.000
|
$1,500.000
|
$2,500.000
|
$4,500.000
|
$2,400.000
|
$3,500.000
|
$2,067.670
|
$5,000.000
|
$7,666.950
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,290.000
|
$30.000
|
$60.000
|
$25.000
|
$40.000
|
$28.000
|
$85.000
|
$41.000
|
$12.510
|
$50.000
|
$38.330
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,110.000
|
$12.000
|
$5.000
|
$4.000
|
$15.000
|
$20.000
|
$6.000
|
$11.500
|
$6.000
|
$15.000
|
$9.110
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,290.000
|
$11.000
|
$20.000
|
$10.000
|
$15.000
|
$15.000
|
$6.000
|
$23.000
|
$12.090
|
$50.000
|
$9.660
|
|
|
DRIVEWAYS (ACP)
|
SY
|
197.000
|
$46.000
|
$80.000
|
$100.000
|
$125.000
|
$35.000
|
$80.000
|
$55.100
|
$40.260
|
$55.000
|
$65.610
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$23.000
|
$25.000
|
$21.000
|
$23.100
|
$22.000
|
$23.000
|
$23.110
|
$21.870
|
$22.000
|
$33.110
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,590.000
|
$1,600.000
|
$1,575.000
|
$1,758.750
|
$2,200.000
|
$1,445.000
|
$1,451.250
|
$1,373.230
|
$1,500.000
|
$2,823.410
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
170.000
|
$4.000
|
$4.000
|
$5.250
|
$5.250
|
$4.350
|
$1.000
|
$1.080
|
$1.020
|
$1.000
|
$3.980
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,400.000
|
$2,700.000
|
$2,520.000
|
$2,677.500
|
$2,770.000
|
$2,335.000
|
$2,343.500
|
$2,217.500
|
$2,180.000
|
$4,165.060
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$265.000
|
$500.000
|
$315.000
|
$262.500
|
$430.000
|
$128.500
|
$129.000
|
$122.070
|
$120.000
|
$516.140
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,400.000
|
$2,000.000
|
$1,575.000
|
$800.000
|
$2,200.000
|
$964.000
|
$967.500
|
$915.480
|
$1,000.000
|
$2,502.420
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$750.000
|
$1,000.000
|
$735.000
|
$500.000
|
$1,000.000
|
$428.500
|
$430.000
|
$406.880
|
$500.000
|
$1,284.580
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$7,700.000
|
$10,000.000
|
$9,450.000
|
$7,500.000
|
$8,700.000
|
$8,570.000
|
$8,600.000
|
$8,137.630
|
$7,500.000
|
$12,073.060
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$440.000
|
$250.000
|
$300.000
|
$750.000
|
$265.000
|
$182.000
|
$182.750
|
$170.000
|
$190.000
|
$409.840
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$500.000
|
$800.000
|
$525.000
|
$450.000
|
$650.000
|
$550.000
|
$551.480
|
$513.000
|
$550.000
|
$838.660
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$630.000
|
$800.000
|
$630.000
|
$525.000
|
$750.000
|
$557.000
|
$559.000
|
$520.000
|
$575.000
|
$1,047.860
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$700.000
|
$800.000
|
$840.000
|
$630.000
|
$750.000
|
$760.450
|
$763.250
|
$710.000
|
$800.000
|
$1,935.690
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$22.000
|
$30.000
|
$30.000
|
$26.250
|
$25.000
|
$21.450
|
$21.500
|
$20.000
|
$35.000
|
$36.770
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
8.000
|
$24.000
|
$30.000
|
$30.000
|
$26.250
|
$30.000
|
$21.450
|
$21.500
|
$20.000
|
$55.000
|
$44.450
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
300.000
|
$4.500
|
$5.000
|
$7.350
|
$4.200
|
$5.380
|
$4.300
|
$5.200
|
$5.000
|
$4.000
|
$5.830
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,243.000
|
$1.000
|
$1.500
|
$1.500
|
$1.580
|
$1.350
|
$1.600
|
$0.500
|
$1.250
|
$1.500
|
$1.160
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
96.000
|
$7.500
|
$10.000
|
$10.000
|
$10.500
|
$8.720
|
$10.700
|
$220.000
|
$8.100
|
$10.000
|
$12.080
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
12,000.000
|
$1.000
|
$1.000
|
$1.250
|
$1.580
|
$1.080
|
$1.600
|
$0.500
|
$1.000
|
$1.500
|
$1.140
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,272.000
|
$0.350
|
$1.000
|
$1.250
|
$0.530
|
$1.080
|
$0.550
|
$0.150
|
$1.000
|
$50.000
|
$0.190
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
2,530.000
|
$1.500
|
$2.000
|
$2.000
|
$1.580
|
$1.610
|
$1.600
|
$1.080
|
$1.500
|
$1.500
|
$0.830
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
15,488.000
|
$0.700
|
$1.500
|
$1.500
|
$1.580
|
$1.350
|
$1.600
|
$1.500
|
$1.250
|
$1.500
|
$0.860
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
195.000
|
$5.000
|
$5.000
|
$7.350
|
$6.300
|
$5.380
|
$6.450
|
$43.000
|
$5.000
|
$6.000
|
$4.700
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,744.000
|
$0.580
|
$0.750
|
$0.630
|
$0.580
|
$0.540
|
$0.600
|
$0.400
|
$0.500
|
$0.550
|
$0.560
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
18,018.000
|
$0.100
|
$0.500
|
$0.320
|
$0.050
|
$0.270
|
$0.050
|
$1.080
|
$0.250
|
$0.050
|
$0.080
|
|
|
FULL - WIDTH MOWING
|
AC
|
1.800
|
$439.000
|
$1.000
|
$500.000
|
$1,000.000
|
$750.000
|
$250.000
|
$250.000
|
$973.290
|
$1,000.000
|
$183.440
|
|
|
LITTER REMOVAL
|
AC
|
3.800
|
$350.000
|
$1.000
|
$500.000
|
$900.000
|
$500.000
|
$745.000
|
$150.000
|
$317.990
|
$500.000
|
$156.250
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$9,970.000
|
$19,500.000
|
$5,250.000
|
$5,000.000
|
$5,000.000
|
$15,000.000
|
$11,287.500
|
$4,282.660
|
$17,000.000
|
$13,543.720
|
|
|
TMA (STATIONARY)
|
DAY
|
542.000
|
$190.000
|
$100.000
|
$25.000
|
$150.000
|
$1.000
|
$195.000
|
$283.170
|
$1.070
|
$100.000
|
$276.980
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$400.000
|
$150.000
|
$525.000
|
$600.000
|
$700.000
|
$5,000.000
|
$1,247.540
|
$72.820
|
$500.000
|
$319.720
|
|
Totals: |
$2,418,128.720
|
$2,712,401.600
|
$2,743,054.480
|
$2,769,436.910
|
$2,878,943.340
|
$2,943,000.000
|
$3,008,642.666
|
$3,009,096.241
|
$3,411,413.660
|
$4,724,738.999
|