PREPARING ROW
|
STA
|
280.580
|
$1,500.000
|
$1,529.000
|
$1,655.000
|
$1,250.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
5.000
|
$25.000
|
$1,420.760
|
$1,000.000
|
$77.770
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
77.000
|
$30.000
|
$211.680
|
$75.000
|
$66.660
|
|
|
BACKFILL (TY A OR B)
|
STA
|
280.580
|
$260.000
|
$332.610
|
$300.000
|
$627.720
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
140.000
|
$80.000
|
$331.980
|
$450.000
|
$259.230
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
9,455.000
|
$0.150
|
$0.170
|
$0.250
|
$0.280
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
9,455.000
|
$0.150
|
$0.170
|
$0.250
|
$0.280
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
18,910.000
|
$0.400
|
$0.410
|
$0.540
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
16.000
|
$20.000
|
$110.000
|
$50.000
|
$161.100
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
33.000
|
$7.000
|
$16.500
|
$10.000
|
$11.110
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,800.000
|
$83.000
|
$103.310
|
$98.500
|
$212.940
|
|
|
PLANE CONC PAV(0" TO 2")
|
SY
|
3,662.000
|
$12.000
|
$7.010
|
$8.000
|
$11.110
|
|
|
CEM STABIL BKFL
|
CY
|
12.000
|
$185.000
|
$275.000
|
$250.000
|
$222.200
|
|
|
CUT & RESTORING PAV
|
SY
|
58.000
|
$150.000
|
$220.000
|
$200.000
|
$211.090
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
94.000
|
$125.000
|
$55.000
|
$50.000
|
$83.330
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
54.000
|
$28.000
|
$11.000
|
$10.000
|
$3.890
|
|
|
RIPRAP (STONE TY R)(DRY)(12 IN)
|
CY
|
1.000
|
$265.000
|
$220.000
|
$200.000
|
$372.190
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
304.000
|
$85.000
|
$77.000
|
$70.000
|
$89.550
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
146.000
|
$110.000
|
$198.000
|
$180.000
|
$99.930
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
3.000
|
$6,420.000
|
$7,700.000
|
$7,000.000
|
$11,110.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$800.000
|
$990.000
|
$900.000
|
$1,461.160
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
62.000
|
$1,600.000
|
$1,045.000
|
$950.000
|
$1,588.630
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$1,500.000
|
$2,200.000
|
$2,000.000
|
$1,386.140
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,500.000
|
$2,750.000
|
$2,500.000
|
$1,781.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,700.000
|
$5,500.000
|
$5,000.000
|
$2,969.600
|
|
|
REMOV STR (PIPE)
|
LF
|
401.000
|
$15.000
|
$38.500
|
$35.000
|
$33.890
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$277,905.000
|
$201,941.610
|
$240,000.000
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$3,000.000
|
$2,805.000
|
$5,000.000
|
$4,900.790
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
300.000
|
$18.000
|
$49.500
|
$35.000
|
$38.890
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
300.000
|
$9.000
|
$16.500
|
$10.000
|
$11.110
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
150.000
|
$5.500
|
$6.050
|
$5.000
|
$5.560
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
150.000
|
$2.000
|
$2.200
|
$1.500
|
$1.670
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
3,090.000
|
$74.000
|
$64.900
|
$70.600
|
$33.330
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,069.000
|
$34.000
|
$30.140
|
$50.500
|
$55.550
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
39.000
|
$245.000
|
$275.000
|
$280.000
|
$243.310
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$350.000
|
$302.500
|
$320.000
|
$283.310
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$730.000
|
$825.000
|
$650.000
|
$816.590
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
78.000
|
$495.000
|
$456.500
|
$575.000
|
$542.170
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$800.000
|
$566.500
|
$700.000
|
$612.160
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
8.000
|
$865.000
|
$907.500
|
$825.000
|
$818.810
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
91.000
|
$75.000
|
$82.500
|
$100.000
|
$83.330
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
91.000
|
$4.000
|
$77.000
|
$60.000
|
$99.990
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,394.000
|
$3.000
|
$1.940
|
$1.000
|
$16.670
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
160.000
|
$1.000
|
$1.270
|
$1.150
|
$1.110
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
80.000
|
$1.000
|
$1.380
|
$1.250
|
$1.110
|
|
RE PROF PM (W)6"(SLD) RAISD PROF ONLY
|
LF
|
110,112.000
|
$1.000
|
$0.550
|
$0.500
|
$0.670
|
|
RE PROF PM (Y)6"(SLD) RAISD PROF ONLY
|
LF
|
53,846.000
|
$1.000
|
$0.500
|
$0.450
|
$0.670
|
|
RE PROF PM (Y)6"(BRK) RAISD PROF ONLY
|
LF
|
210.000
|
$1.000
|
$0.610
|
$0.550
|
$0.670
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
118.000
|
$50.000
|
$21.450
|
$19.500
|
$18.830
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,673.000
|
$5.000
|
$6.600
|
$6.000
|
$6.170
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,200.000
|
$1.000
|
$0.550
|
$0.500
|
$1.670
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,200.000
|
$1.000
|
$0.020
|
$0.020
|
$0.830
|
|
|
FULL - WIDTH MOWING
|
AC
|
18.000
|
$1,500.000
|
$244.440
|
$350.000
|
$888.800
|
|
|
LITTER REMOVAL
|
AC
|
18.000
|
$150.000
|
$296.030
|
$450.000
|
$388.850
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
6,687.000
|
$130.000
|
$182.010
|
$187.410
|
$252.990
|
|
|
TACK COAT
|
GAL
|
8,737.000
|
$4.000
|
$5.310
|
$5.000
|
$11.110
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
1,960.000
|
$145.000
|
$203.750
|
$208.550
|
$257.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$4,950.000
|
$20,000.000
|
$8,888.000
|
|
|
TMA (STATIONARY)
|
DAY
|
70.000
|
$400.000
|
$190.930
|
$150.000
|
$555.500
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$400.000
|
$222.750
|
$150.000
|
$555.500
|
|
Totals: |
$3,080,076.300
|
$3,448,292.044
|
$3,629,559.170
|
$4,598,680.788
|