REMOVING CONC (RIPRAP)
|
SY
|
142.000
|
$40.000
|
$60.000
|
$45.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
650.000
|
$21.000
|
$60.000
|
$45.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
539.000
|
$10.000
|
$15.000
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
10,925.000
|
$15.000
|
$15.000
|
$12.000
|
|
|
BACKFILL (TY B)
|
STA
|
37.000
|
$390.000
|
$650.000
|
$500.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,434.000
|
$7.700
|
$10.000
|
$14.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
1,264.000
|
$14.000
|
$11.000
|
$12.000
|
|
|
AGGR (TY-PB GR-4 MOD)
|
CY
|
27.000
|
$400.000
|
$350.000
|
$350.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
7,000.000
|
$250.000
|
$350.000
|
$290.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(10")
|
SY
|
3,940.000
|
$350.000
|
$475.000
|
$525.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
17.000
|
$700.000
|
$900.000
|
$900.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$441,168.730
|
$550,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$30,000.000
|
$10,000.000
|
$75,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$50.000
|
$55.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
619.000
|
$6.000
|
$6.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
619.000
|
$2.000
|
$3.000
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
563.000
|
$8.000
|
$15.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
563.000
|
$3.000
|
$8.000
|
$4.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
34.000
|
$110.000
|
$165.000
|
$200.000
|
|
|
CONC CURB (TY II)
|
LF
|
548.000
|
$50.000
|
$60.000
|
$32.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
218.000
|
$75.000
|
$65.000
|
$75.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
796.000
|
$140.000
|
$160.000
|
$190.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
12,715.000
|
$1.000
|
$2.000
|
$2.160
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
166.000
|
$12.500
|
$15.000
|
$24.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
6.000
|
$200.000
|
$1,800.000
|
$600.000
|
|
|
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
|
EA
|
4.000
|
$27.500
|
$1,500.000
|
$120.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
13,643.000
|
$1.000
|
$1.500
|
$2.160
|
|
|
PAVEMENT SEALER 24"
|
LF
|
109.000
|
$3.000
|
$6.000
|
$6.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$60.000
|
$800.000
|
$120.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$65.000
|
$800.000
|
$150.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
4.000
|
$17.000
|
$800.000
|
$30.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
109.000
|
$18.000
|
$15.000
|
$21.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$250.000
|
$1,800.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$300.000
|
$1,800.000
|
$420.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
4.000
|
$100.000
|
$1,800.000
|
$120.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
19.000
|
$11.000
|
$6.000
|
$12.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
105.000
|
$11.000
|
$8.000
|
$9.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,275.000
|
$1.000
|
$1.000
|
$2.400
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
12,474.000
|
$0.500
|
$1.000
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
544.000
|
$1.500
|
$2.000
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
109.000
|
$3.000
|
$4.000
|
$4.800
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$30.000
|
$1,000.000
|
$108.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$45.000
|
$1,000.000
|
$120.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
4.000
|
$30.000
|
$1,000.000
|
$30.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
2,677.000
|
$200.000
|
$165.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$21,750.000
|
$8,500.000
|
$20,000.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
5,358.000
|
$1.500
|
$8.000
|
$2.400
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
174.000
|
$2.000
|
$15.000
|
$3.600
|
|
MULTIPOLYMER PAV MRK (W)(8")(DOT)
|
LF
|
370.000
|
$2.500
|
$15.000
|
$3.600
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
7,116.000
|
$1.500
|
$8.000
|
$2.400
|
|
|
TMA (STATIONARY)
|
DAY
|
63.000
|
$450.000
|
$250.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
156.000
|
$400.000
|
$500.000
|
$500.000
|
|
Totals: |
$4,973,039.530
|
$6,255,551.500
|
$6,422,739.680
|