REMOVING CONC (RIPRAP)
|
SY
|
46.000
|
$50.000
|
$79.250
|
$83.000
|
$150.000
|
$60.000
|
$84.240
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
438.000
|
$10.000
|
$14.210
|
$16.000
|
$20.000
|
$30.000
|
$6.510
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
512.000
|
$20.000
|
$21.930
|
$24.000
|
$20.000
|
$22.000
|
$89.600
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
28.000
|
$20.000
|
$27.000
|
$71.000
|
$50.000
|
$100.000
|
$271.080
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
14.000
|
$20.000
|
$54.000
|
$300.000
|
$50.000
|
$100.000
|
$302.270
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
3,107.000
|
$2.000
|
$6.850
|
$5.900
|
$4.000
|
$5.250
|
$12.290
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
3,107.000
|
$0.100
|
$1.300
|
$1.450
|
$2.000
|
$3.000
|
$0.430
|
|
|
VEGETATIVE WATERING
|
MG
|
31.000
|
$35.000
|
$130.660
|
$150.000
|
$1.000
|
$25.000
|
$112.240
|
|
|
PRIME COAT (MC-30)
|
GAL
|
717.000
|
$8.000
|
$13.500
|
$9.000
|
$15.000
|
$16.000
|
$8.180
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
1,458.000
|
$5.000
|
$20.380
|
$9.000
|
$10.000
|
$13.000
|
$5.890
|
|
|
AGGR(TY-PB GR-3S SAC-A)
|
CY
|
25.000
|
$90.000
|
$297.000
|
$615.000
|
$600.000
|
$600.000
|
$740.950
|
|
|
D-GR HMA(SQ) TY-B SAC-B PG70-22
|
TON
|
26.000
|
$130.000
|
$176.710
|
$670.000
|
$200.000
|
$500.000
|
$623.970
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG70-28
|
TON
|
294.000
|
$180.000
|
$193.190
|
$240.000
|
$200.000
|
$450.000
|
$238.960
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,126.000
|
$4.000
|
$8.350
|
$9.000
|
$20.000
|
$22.000
|
$18.340
|
|
|
FLOWABLE BACKFILL
|
CY
|
1.000
|
$200.000
|
$1,350.000
|
$3,200.000
|
$600.000
|
$2,000.000
|
$1,209.480
|
|
|
CL K CONC (PEDESTAL)
|
CY
|
3.000
|
$2,000.000
|
$5,040.030
|
$26,875.000
|
$5,000.000
|
$1,000.000
|
$4,146.320
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
5,850.000
|
$35.000
|
$46.400
|
$57.000
|
$34.000
|
$32.000
|
$53.860
|
|
|
APPROACH SLAB (HPC)
|
CY
|
77.000
|
$900.000
|
$1,008.170
|
$800.000
|
$600.000
|
$880.000
|
$1,507.930
|
|
|
CONCRETE PAINT FINISH
|
SF
|
1,320.000
|
$8.000
|
$8.210
|
$1.650
|
$6.000
|
$15.000
|
$9.920
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
633.000
|
$11.000
|
$13.640
|
$9.900
|
$12.000
|
$25.000
|
$10.840
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
206.000
|
$160.000
|
$216.000
|
$185.000
|
$300.000
|
$215.000
|
$257.200
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
138.000
|
$150.000
|
$166.310
|
$196.000
|
$400.000
|
$210.000
|
$296.260
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
26.000
|
$650.000
|
$1,012.500
|
$888.000
|
$600.000
|
$600.000
|
$1,218.350
|
|
|
ELASTOMERIC BEARING (LAMINATED)
|
EA
|
8.000
|
$300.000
|
$3,401.330
|
$1,800.000
|
$1,500.000
|
$6,500.000
|
$2,210.100
|
|
|
ELASTOMERIC BEARING (E1)
|
EA
|
4.000
|
$300.000
|
$3,192.750
|
$1,700.000
|
$2,000.000
|
$8,500.000
|
$5,617.190
|
|
|
ELASTOMERIC BEARING (F1)
|
EA
|
4.000
|
$300.000
|
$3,192.750
|
$1,700.000
|
$2,000.000
|
$8,500.000
|
$5,351.190
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
3,070.000
|
$10.000
|
$12.510
|
$3.750
|
$30.000
|
$35.000
|
$34.990
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
2,354.000
|
$20.000
|
$9.600
|
$9.700
|
$8.000
|
$35.000
|
$35.510
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM III-A)
|
LS
|
1.000
|
$120,000.000
|
$254,610.000
|
$288,000.000
|
$600,000.000
|
$225,000.000
|
$1,939,795.800
|
|
|
ANCHOR BOLTS
|
EA
|
32.000
|
$100.000
|
$151.200
|
$189.000
|
$200.000
|
$900.000
|
$32.120
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
471.000
|
$100.000
|
$135.000
|
$108.000
|
$120.000
|
$225.000
|
$120.730
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
79.000
|
$80.000
|
$102.540
|
$200.000
|
$80.000
|
$145.000
|
$183.730
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$150,000.000
|
$103,950.000
|
$108,000.000
|
$80,000.000
|
$425,000.000
|
$331,506.190
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
1.000
|
$100,000.000
|
$135,000.000
|
$124,000.000
|
$250,000.000
|
$225,000.000
|
$975,303.690
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$15,000.000
|
$8,775.000
|
$12,600.000
|
$20,000.000
|
$17,000.000
|
$17,680.860
|
|
|
REMOVE STR (RAIL)
|
LF
|
391.000
|
$20.000
|
$106.380
|
$108.000
|
$100.000
|
$85.000
|
$54.330
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$116,827.690
|
$189,405.000
|
$202,400.000
|
$205,000.000
|
$210,000.000
|
$591,335.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$7,000.000
|
$6,250.520
|
$15,900.000
|
$10,000.000
|
$8,500.000
|
$7,170.920
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
40.000
|
$25.000
|
$96.190
|
$100.000
|
$1.000
|
$35.000
|
$36.740
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
40.000
|
$10.000
|
$47.250
|
$52.000
|
$1.000
|
$12.000
|
$14.850
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
111.000
|
$20.000
|
$29.490
|
$55.000
|
$1.000
|
$45.000
|
$24.610
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
111.000
|
$8.000
|
$17.060
|
$22.000
|
$1.000
|
$15.000
|
$12.490
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,315.000
|
$4.000
|
$5.400
|
$7.500
|
$5.000
|
$8.000
|
$3.870
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,315.000
|
$1.100
|
$1.350
|
$1.850
|
$2.000
|
$3.000
|
$1.100
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
690.000
|
$9.000
|
$36.020
|
$25.000
|
$60.000
|
$32.000
|
$29.710
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
690.000
|
$9.000
|
$28.190
|
$23.000
|
$60.000
|
$32.000
|
$28.360
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
9.000
|
$20.000
|
$67.500
|
$90.000
|
$100.000
|
$150.000
|
$109.610
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
291.000
|
$20.000
|
$59.190
|
$48.000
|
$90.000
|
$72.000
|
$45.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
350.000
|
$22.000
|
$31.190
|
$25.800
|
$26.000
|
$28.000
|
$25.830
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,020.000
|
$2,700.000
|
$2,346.000
|
$1,500.000
|
$1,500.000
|
$2,273.980
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,165.000
|
$1,566.000
|
$1,296.000
|
$2,600.000
|
$1,800.000
|
$1,349.980
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$770.000
|
$1,181.250
|
$978.000
|
$1,000.000
|
$2,200.000
|
$1,036.480
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$2.500
|
$4.050
|
$3.350
|
$5.000
|
$2.000
|
$3.720
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$240.000
|
$405.000
|
$335.000
|
$500.000
|
$500.000
|
$366.990
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$265.000
|
$405.000
|
$335.000
|
$1,200.000
|
$250.000
|
$379.320
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,600.000
|
$3,847.500
|
$3,185.000
|
$2,800.000
|
$2,800.000
|
$3,208.980
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$850.000
|
$675.000
|
$1,675.000
|
$15,000.000
|
$3,500.000
|
$1,778.620
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$10,000.000
|
$14,782.500
|
$9,500.000
|
$2,000.000
|
$13,500.000
|
$9,497.960
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$510.000
|
$1,100.250
|
$910.000
|
$1,000.000
|
$1,000.000
|
$949.800
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$900.000
|
$1,755.000
|
$1,450.000
|
$1,000.000
|
$1,000.000
|
$1,389.800
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$2,600.000
|
$3,712.500
|
$3,100.000
|
$2,000.000
|
$2,500.000
|
$3,314.800
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$80.000
|
$74.250
|
$61.500
|
$200.000
|
$500.000
|
$152.300
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
14.000
|
$125.000
|
$135.000
|
$110.000
|
$60.000
|
$45.000
|
$159.070
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$21.000
|
$54.000
|
$45.000
|
$60.000
|
$45.000
|
$75.490
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
19.000
|
$20.000
|
$60.750
|
$50.000
|
$100.000
|
$45.000
|
$24.290
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$25.000
|
$35.100
|
$29.000
|
$60.000
|
$45.000
|
$63.160
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
667.000
|
$0.750
|
$3.380
|
$2.800
|
$3.500
|
$3.000
|
$2.640
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
141.000
|
$0.120
|
$2.700
|
$2.200
|
$2.000
|
$3.000
|
$2.260
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
587.000
|
$0.100
|
$1.350
|
$1.100
|
$2.000
|
$3.000
|
$1.460
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
667.000
|
$0.300
|
$2.700
|
$2.250
|
$3.000
|
$3.000
|
$2.640
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,887.000
|
$0.100
|
$1.350
|
$1.100
|
$2.000
|
$3.000
|
$1.290
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
141.000
|
$0.300
|
$4.050
|
$3.350
|
$3.000
|
$3.000
|
$3.470
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,152.000
|
$0.250
|
$2.230
|
$1.850
|
$3.000
|
$3.000
|
$2.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,447.000
|
$0.250
|
$2.230
|
$1.850
|
$3.000
|
$3.000
|
$2.480
|
|
REFL PAV MRKR TY I-C
|
EA
|
7.000
|
$3.250
|
$13.500
|
$11.000
|
$15.000
|
$25.000
|
$91.820
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
10.000
|
$2.750
|
$13.500
|
$11.000
|
$15.000
|
$25.000
|
$24.890
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
39.000
|
$3.250
|
$13.500
|
$11.000
|
$15.000
|
$25.000
|
$13.890
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,135.000
|
$0.050
|
$2.030
|
$1.700
|
$2.200
|
$2.000
|
$1.720
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
485.000
|
$0.050
|
$4.050
|
$3.350
|
$3.000
|
$2.000
|
$3.610
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,615.000
|
$0.500
|
$1.350
|
$1.100
|
$2.000
|
$2.000
|
$1.270
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
667.000
|
$0.500
|
$2.700
|
$2.250
|
$3.000
|
$2.000
|
$2.640
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$20,000.000
|
$13,500.000
|
$18,450.000
|
$6,000.000
|
$15,000.000
|
$14,294.320
|
|
|
TMA (STATIONARY)
|
DAY
|
6.000
|
$250.000
|
$1,350.000
|
$872.000
|
$1,000.000
|
$1,200.000
|
$574.660
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$250.000
|
$2,025.000
|
$1,060.000
|
$1,000.000
|
$1,200.000
|
$2,031.840
|
|
Totals: |
$1,324,104.610
|
$1,863,848.830
|
$2,024,031.150
|
$2,336,411.500
|
$2,587,952.750
|
$5,329,560.150
|