PREPARING ROW
|
STA
|
2.000
|
$6,302.170
|
$200,000.000
|
$35,000.000
|
$391,639.510
|
$14,542.700
|
$50,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
300.000
|
$77.000
|
$33.620
|
$31.000
|
$23.130
|
$67.210
|
$30.000
|
|
|
REMOV CONC (FLUME)
|
SY
|
35.000
|
$140.000
|
$33.620
|
$100.000
|
$22.140
|
$97.970
|
$30.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
4,685.000
|
$30.000
|
$26.110
|
$46.000
|
$19.840
|
$44.270
|
$40.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
5,199.000
|
$55.000
|
$26.110
|
$31.000
|
$16.840
|
$34.580
|
$45.000
|
|
|
HYDRO MULCH SEED (PERM_RURAL_CLAY)
|
SY
|
6,662.000
|
$1.530
|
$2.370
|
$1.250
|
$1.120
|
$1.070
|
$1.500
|
|
|
HYDRO MULCH SEED (TEMP_WARM)
|
SY
|
3,331.000
|
$0.410
|
$2.370
|
$1.200
|
$1.120
|
$1.070
|
$1.000
|
|
|
HYDRO MULCH SEED (TEMP_COOL)
|
SY
|
3,331.000
|
$0.380
|
$2.370
|
$1.200
|
$1.120
|
$1.070
|
$1.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
60.000
|
$100.000
|
$27.690
|
$30.000
|
$1.180
|
$177.610
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
|
SY
|
7,169.000
|
$25.190
|
$18.990
|
$29.000
|
$17.000
|
$30.470
|
$50.000
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 1)
|
SY
|
434.000
|
$6.750
|
$4.450
|
$60.000
|
$9.350
|
$12.060
|
$5.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,434.000
|
$8.350
|
$8.310
|
$11.500
|
$6.200
|
$13.300
|
$15.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
1,577.000
|
$200.000
|
$231.420
|
$155.000
|
$263.120
|
$227.430
|
$275.000
|
|
|
TACK COAT
|
GAL
|
717.000
|
$5.850
|
$8.310
|
$15.500
|
$5.320
|
$4.720
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
302.000
|
$314.100
|
$178.010
|
$350.000
|
$200.910
|
$476.150
|
$300.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
150.000
|
$46.000
|
$4.150
|
$350.000
|
$65.530
|
$735.840
|
$300.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
555.000
|
$355.000
|
$409.960
|
$300.000
|
$404.410
|
$506.360
|
$350.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,993.000
|
$387.000
|
$457.000
|
$450.000
|
$485.990
|
$557.230
|
$380.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
130.800
|
$2,500.000
|
$1,875.500
|
$1,510.000
|
$1,271.500
|
$2,441.670
|
$2,500.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
128.300
|
$2,500.000
|
$1,820.020
|
$1,250.000
|
$2,055.030
|
$3,005.490
|
$2,600.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
73.700
|
$2,500.000
|
$1,842.590
|
$1,800.000
|
$1,544.600
|
$2,959.160
|
$2,800.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
23,034.000
|
$40.000
|
$28.960
|
$31.750
|
$41.870
|
$41.730
|
$50.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
174.900
|
$864.000
|
$875.820
|
$875.000
|
$883.790
|
$1,547.100
|
$2,000.000
|
|
|
RETAINING WALL (DRILL SHAFT) (FASCIA)
|
SF
|
1,307.000
|
$63.670
|
$34.810
|
$105.000
|
$95.330
|
$185.540
|
$200.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
2,880.500
|
$248.500
|
$231.390
|
$250.000
|
$232.520
|
$300.450
|
$390.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
322.000
|
$7.500
|
$41.540
|
$35.000
|
$41.360
|
$78.980
|
$8.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
56.000
|
$800.000
|
$519.200
|
$815.000
|
$578.170
|
$1,687.430
|
$800.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
64.000
|
$705.000
|
$519.200
|
$750.000
|
$557.960
|
$930.170
|
$800.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,439.000
|
$205.000
|
$112.490
|
$225.000
|
$156.270
|
$442.980
|
$250.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
914.000
|
$100.000
|
$169.710
|
$180.000
|
$140.980
|
$204.000
|
$200.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
276.000
|
$245.780
|
$290.750
|
$350.000
|
$189.650
|
$404.370
|
$250.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
50.000
|
$135.000
|
$142.410
|
$200.000
|
$136.520
|
$161.720
|
$130.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$5,000.000
|
$2,076.810
|
$4,500.000
|
$1,803.900
|
$3,502.220
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
55.000
|
$800.000
|
$41.540
|
$80.000
|
$15.950
|
$42.520
|
$80.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$73,000.000
|
$61,847.480
|
$160,000.000
|
$61,589.350
|
$137,293.980
|
$600,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$335,000.000
|
$135,526.850
|
$550,000.000
|
$134,961.220
|
$205,295.770
|
$850,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$458,713.390
|
$750,000.000
|
$750,000.000
|
$779,342.930
|
$750,929.310
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$15,000.000
|
$5,844.740
|
$20,000.000
|
$16,249.710
|
$27,031.460
|
$21,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,618.350
|
$36,640.910
|
$25,000.000
|
$11,817.970
|
$6,965.620
|
$50,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$450.000
|
$593.380
|
$350.000
|
$236.360
|
$893.040
|
$400.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,565.000
|
$5.500
|
$6.230
|
$3.000
|
$3.550
|
$4.260
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,565.000
|
$2.250
|
$1.190
|
$1.000
|
$1.180
|
$1.420
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
786.000
|
$5.000
|
$7.420
|
$3.500
|
$5.280
|
$4.740
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
786.000
|
$2.360
|
$1.480
|
$1.000
|
$1.330
|
$1.420
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
540.000
|
$50.000
|
$178.010
|
$155.000
|
$101.290
|
$103.640
|
$350.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
9.000
|
$9,000.000
|
$6,790.850
|
$12,500.000
|
$13,791.570
|
$2,761.320
|
$16,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,950.000
|
$75.000
|
$97.310
|
$83.000
|
$80.440
|
$101.560
|
$90.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
420.000
|
$62.820
|
$91.380
|
$96.000
|
$86.270
|
$15.450
|
$90.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$67.890
|
$90.190
|
$157.000
|
$99.270
|
$64.900
|
$90.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
3,420.000
|
$20.000
|
$8.310
|
$12.000
|
$8.860
|
$13.600
|
$30.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
200.000
|
$9.550
|
$8.310
|
$32.000
|
$7.090
|
$32.060
|
$30.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$16.850
|
$8.310
|
$65.000
|
$8.330
|
$32.060
|
$30.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,950.000
|
$22.000
|
$20.170
|
$10.000
|
$15.470
|
$17.680
|
$80.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
420.000
|
$17.250
|
$20.170
|
$22.000
|
$11.520
|
$20.520
|
$80.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$25.000
|
$20.170
|
$70.000
|
$14.180
|
$43.930
|
$80.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
2,066.000
|
$0.650
|
$5.140
|
$4.000
|
$1.180
|
$2.490
|
$10.000
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
1,062.000
|
$1.360
|
$5.140
|
$4.000
|
$1.180
|
$2.490
|
$10.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
425.000
|
$29.560
|
$32.040
|
$23.000
|
$23.800
|
$83.150
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$2,746.470
|
$2,729.530
|
$1,600.000
|
$319.900
|
$4,054.400
|
$1,800.000
|
|
|
TL-3 31" SHORT RADIUS (COMPLETE)
|
EA
|
1.000
|
$36,500.000
|
$35,602.500
|
$22,650.000
|
$19,499.650
|
$47,786.580
|
$25,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
962.500
|
$8.000
|
$8.310
|
$7.000
|
$2.650
|
$14.200
|
$2.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$235.000
|
$474.700
|
$400.000
|
$185.540
|
$1,065.080
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,615.920
|
$3,797.600
|
$3,000.000
|
$2,969.270
|
$6,908.820
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$300.000
|
$474.700
|
$400.000
|
$227.900
|
$1,065.080
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
9.000
|
$3,850.000
|
$2,966.880
|
$2,500.000
|
$1,299.980
|
$1,162.370
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,750.000
|
$1,186.750
|
$1,000.000
|
$856.800
|
$928.060
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,850.000
|
$10,384.060
|
$8,750.000
|
$13,082.490
|
$9,896.030
|
$10,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$700.000
|
$379.760
|
$320.000
|
$378.180
|
$830.770
|
$4,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$898.480
|
$949.400
|
$800.000
|
$945.440
|
$1,753.830
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
4.000
|
$680.000
|
$1,145.210
|
$965.000
|
$1,140.430
|
$1,753.830
|
$3,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$165.000
|
$160.210
|
$135.000
|
$159.540
|
$230.590
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
14.000
|
$50.000
|
$14.830
|
$45.000
|
$14.770
|
$26.040
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$51.000
|
$32.640
|
$45.000
|
$32.500
|
$33.140
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
10,912.000
|
$0.900
|
$1.780
|
$1.500
|
$1.770
|
$2.130
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$10.550
|
$29.670
|
$25.000
|
$29.540
|
$35.500
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
43,182.000
|
$0.750
|
$1.780
|
$1.500
|
$1.770
|
$2.130
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
3,114.000
|
$1.000
|
$5.930
|
$5.000
|
$5.910
|
$7.100
|
$4.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,114.000
|
$1.000
|
$5.930
|
$5.000
|
$5.910
|
$7.100
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
39.000
|
$13.000
|
$11.870
|
$10.000
|
$11.820
|
$14.200
|
$20.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
12,194.000
|
$1.050
|
$2.670
|
$2.500
|
$2.950
|
$3.200
|
$2.000
|
|
Totals: |
$7,296,761.780
|
$7,087,905.497
|
$7,871,593.900
|
$7,871,856.125
|
$9,641,390.630
|
$11,165,676.000
|