REMOVING CONC (RIPRAP)
|
SY
|
20.000
|
$8.800
|
$35.000
|
$20.000
|
$20.000
|
$32.000
|
$35.960
|
$50.600
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
6.000
|
$18.800
|
$25.000
|
$72.000
|
$20.000
|
$35.000
|
$143.840
|
$84.340
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,406.000
|
$15.000
|
$30.000
|
$28.000
|
$30.000
|
$34.000
|
$12.890
|
$6.640
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
2,642.000
|
$8.000
|
$10.000
|
$10.000
|
$20.000
|
$5.700
|
$10.860
|
$3.180
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
308.000
|
$20.000
|
$23.000
|
$25.000
|
$20.000
|
$36.000
|
$10.980
|
$9.350
|
|
|
REMOVING CONC (FLUME)
|
SY
|
2.000
|
$16.610
|
$35.000
|
$25.000
|
$20.000
|
$110.000
|
$611.330
|
$127.080
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
1,944.000
|
$25.000
|
$30.000
|
$14.000
|
$20.000
|
$21.000
|
$11.420
|
$14.610
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
660.000
|
$25.000
|
$25.000
|
$20.000
|
$20.000
|
$18.250
|
$23.850
|
$23.740
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
295.000
|
$40.000
|
$25.000
|
$30.000
|
$20.000
|
$59.000
|
$11.550
|
$32.090
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
2,562.000
|
$1.400
|
$5.000
|
$10.000
|
$2.000
|
$6.300
|
$1.180
|
$11.310
|
|
|
GENERAL USE COMPOST (4")
|
SY
|
21.000
|
$10.000
|
$10.000
|
$50.000
|
$4.000
|
$13.000
|
$35.960
|
$123.330
|
|
|
BLOCK SODDING
|
SY
|
2,562.000
|
$5.000
|
$5.000
|
$6.250
|
$4.000
|
$7.900
|
$7.510
|
$6.060
|
|
|
MULCH SODDING
|
SY
|
21.000
|
$5.000
|
$10.000
|
$100.000
|
$50.000
|
$7.900
|
$71.920
|
$10.630
|
|
|
VEGETATIVE WATERING
|
MG
|
43.600
|
$21.440
|
$1.000
|
$800.000
|
$5.000
|
$80.000
|
$44.210
|
$333.280
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
163.600
|
$250.000
|
$225.000
|
$241.500
|
$100.000
|
$250.000
|
$296.980
|
$106.890
|
|
|
TACK COAT
|
GAL
|
117.000
|
$6.690
|
$5.000
|
$9.600
|
$8.000
|
$12.000
|
$8.940
|
$14.750
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
1,469.000
|
$4.000
|
$20.000
|
$57.500
|
$2.000
|
$40.000
|
$5.320
|
$1.300
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
1,326.000
|
$95.000
|
$95.000
|
$253.000
|
$150.000
|
$110.000
|
$116.700
|
$178.530
|
|
|
CL A CONC (MISC)
|
CY
|
20.000
|
$990.900
|
$650.000
|
$350.000
|
$800.000
|
$700.000
|
$1,182.130
|
$464.700
|
|
|
CL A CONC (FLUME)
|
CY
|
1.000
|
$1,600.570
|
$650.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
$1,726.120
|
$464.700
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
72.000
|
$135.000
|
$150.000
|
$130.000
|
$500.000
|
$400.000
|
$202.780
|
$93.300
|
|
|
GRATE & FRAME
|
EA
|
9.000
|
$1,500.000
|
$1,500.000
|
$3,500.000
|
$4,500.000
|
$3,000.000
|
$1,134.880
|
$2,455.340
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$790.000
|
$700.000
|
$3,500.000
|
$800.000
|
$1,500.000
|
$1,575.750
|
$1,930.770
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
3.000
|
$390.000
|
$500.000
|
$3,000.000
|
$800.000
|
$1,500.000
|
$909.480
|
$467.070
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
83.000
|
$3.880
|
$17.000
|
$8.000
|
$6.000
|
$10.000
|
$18.110
|
$7.190
|
|
|
REMOVE STR (RAIL)
|
LF
|
19.000
|
$27.230
|
$25.000
|
$100.000
|
$25.000
|
$100.000
|
$54.360
|
$15.710
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$217,454.000
|
$180,000.000
|
$120,000.000
|
$300,000.000
|
$120,000.000
|
$395,568.240
|
$414,533.550
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$7,500.000
|
$1,000.000
|
$2,823.000
|
$7,000.000
|
$14,500.000
|
$35,960.750
|
$1,975.470
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
2,060.000
|
$5.000
|
$0.100
|
$15.000
|
$10.000
|
$4.000
|
$8.060
|
$5.060
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,060.000
|
$5.000
|
$0.100
|
$3.750
|
$3.000
|
$5.000
|
$2.960
|
$3.820
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,060.000
|
$1.500
|
$0.100
|
$2.500
|
$1.000
|
$2.250
|
$0.920
|
$0.570
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,060.000
|
$5.070
|
$0.100
|
$5.500
|
$6.000
|
$7.000
|
$4.950
|
$7.330
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,060.000
|
$1.680
|
$0.100
|
$1.000
|
$2.000
|
$1.500
|
$1.440
|
$1.120
|
|
|
CONC CURB (TY II)
|
LF
|
1,014.000
|
$25.000
|
$35.000
|
$25.000
|
$20.000
|
$30.000
|
$21.460
|
$21.630
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
3,392.000
|
$23.420
|
$35.000
|
$25.000
|
$25.000
|
$33.000
|
$29.850
|
$32.030
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,084.000
|
$30.000
|
$35.000
|
$25.000
|
$30.000
|
$37.000
|
$29.700
|
$36.670
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,359.000
|
$95.000
|
$95.000
|
$75.000
|
$100.000
|
$140.000
|
$75.140
|
$143.650
|
|
|
CONC SIDEWALKS (4")
|
SY
|
4,547.000
|
$65.000
|
$80.000
|
$75.000
|
$100.000
|
$97.000
|
$64.520
|
$76.800
|
|
|
CONC SIDEWALKS (5")
|
SY
|
289.000
|
$77.160
|
$95.000
|
$75.000
|
$100.000
|
$110.000
|
$83.060
|
$80.520
|
|
|
CURB RAMPS (TY 1)
|
SY
|
819.000
|
$100.000
|
$115.000
|
$225.000
|
$100.000
|
$180.000
|
$263.430
|
$641.680
|
|
|
CURB RAMPS (TY 2)
|
SY
|
119.000
|
$120.000
|
$115.000
|
$225.000
|
$100.000
|
$300.000
|
$165.600
|
$374.270
|
|
|
CURB RAMPS (TY 3)
|
SY
|
497.000
|
$150.000
|
$115.000
|
$225.000
|
$100.000
|
$200.000
|
$172.790
|
$577.080
|
|
|
CURB RAMPS (TY 5)
|
SY
|
15.000
|
$150.000
|
$115.000
|
$225.000
|
$100.000
|
$220.000
|
$259.820
|
$441.830
|
|
|
CURB RAMPS (TY 6)
|
SY
|
84.000
|
$120.000
|
$115.000
|
$225.000
|
$100.000
|
$150.000
|
$190.060
|
$390.660
|
|
|
CURB RAMPS (TY 7)
|
SY
|
582.000
|
$110.000
|
$115.000
|
$225.000
|
$100.000
|
$190.000
|
$201.360
|
$503.380
|
|
|
CURB RAMPS (TY 20)
|
SY
|
73.000
|
$120.000
|
$115.000
|
$225.000
|
$100.000
|
$200.000
|
$190.060
|
$704.710
|
|
|
CURB RAMPS (TY 21)
|
SY
|
125.000
|
$120.000
|
$115.000
|
$225.000
|
$100.000
|
$230.000
|
$228.900
|
$1,022.720
|
|
|
CURB RAMPS (TY 22)
|
SY
|
249.000
|
$150.000
|
$115.000
|
$225.000
|
$100.000
|
$200.000
|
$169.430
|
$464.170
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
119.000
|
$150.000
|
$250.000
|
$200.000
|
$150.000
|
$200.000
|
$223.020
|
$48.460
|
|
|
CONCRETE SIDEWALK (STEPS)
|
SY
|
11.000
|
$410.860
|
$200.000
|
$225.000
|
$500.000
|
$700.000
|
$458.810
|
$37.700
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
1,077.000
|
$100.000
|
$75.000
|
$85.000
|
$150.000
|
$200.000
|
$95.400
|
$61.790
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
688.000
|
$15.000
|
$32.000
|
$23.000
|
$15.000
|
$38.000
|
$41.340
|
$28.740
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
172.000
|
$35.000
|
$36.000
|
$36.800
|
$20.000
|
$43.000
|
$47.140
|
$32.770
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
57.000
|
$10.100
|
$32.000
|
$24.730
|
$20.000
|
$38.000
|
$41.710
|
$29.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
807.000
|
$1.200
|
$1.500
|
$4.600
|
$2.000
|
$2.000
|
$1.900
|
$1.320
|
|
|
GROUND BOX TY D (162922)
|
EA
|
9.000
|
$1,200.000
|
$900.000
|
$1,288.000
|
$900.000
|
$1,200.000
|
$1,160.810
|
$807.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
6.000
|
$575.000
|
$500.000
|
$1,620.000
|
$700.000
|
$1,800.000
|
$1,294.590
|
$1,128.180
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
20.000
|
$700.000
|
$500.000
|
$1,140.000
|
$600.000
|
$1,200.000
|
$791.140
|
$573.810
|
|
|
PAVEMENT SEALER 4"
|
LF
|
157.000
|
$0.500
|
$0.300
|
$0.300
|
$0.500
|
$0.400
|
$0.220
|
$0.250
|
|
|
PAVEMENT SEALER 8"
|
LF
|
4,505.000
|
$1.000
|
$0.500
|
$0.600
|
$0.500
|
$0.700
|
$0.500
|
$0.500
|
|
|
PAVEMENT SEALER 12"
|
LF
|
837.000
|
$2.000
|
$0.800
|
$0.900
|
$2.000
|
$1.000
|
$0.860
|
$0.750
|
|
|
PAVEMENT SEALER 24"
|
LF
|
10,114.000
|
$3.000
|
$1.500
|
$1.800
|
$5.000
|
$1.950
|
$1.730
|
$1.500
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
27.000
|
$80.000
|
$10.000
|
$12.000
|
$30.000
|
$13.000
|
$21.580
|
$10.000
|
|
PREFAB PAV MRK TY C (W) (4") (BRK)
|
LF
|
157.000
|
$2.000
|
$2.000
|
$2.400
|
$2.000
|
$2.600
|
$5.640
|
$2.000
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
4,505.000
|
$4.000
|
$3.000
|
$3.600
|
$16.000
|
$3.900
|
$8.990
|
$3.000
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
837.000
|
$6.000
|
$6.000
|
$7.200
|
$6.000
|
$7.900
|
$10.070
|
$6.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
10,114.000
|
$12.000
|
$13.000
|
$14.400
|
$12.000
|
$15.750
|
$16.180
|
$12.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
6.000
|
$30.000
|
$30.000
|
$30.000
|
$30.000
|
$33.000
|
$20.140
|
$25.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
21.000
|
$40.600
|
$40.000
|
$42.000
|
$35.000
|
$46.000
|
$41.710
|
$35.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
967.000
|
$0.810
|
$0.500
|
$0.600
|
$1.000
|
$3.700
|
$2.230
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,627.000
|
$1.070
|
$1.000
|
$1.200
|
$1.000
|
$1.300
|
$4.600
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
10,865.000
|
$2.590
|
$1.500
|
$1.800
|
$3.000
|
$1.950
|
$7.120
|
$1.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
4,117.000
|
$4.800
|
$3.000
|
$3.600
|
$6.000
|
$3.900
|
$14.020
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
|
EA
|
9.000
|
$2.750
|
$5.000
|
$60.000
|
$3.000
|
$6.600
|
$35.960
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
157.000
|
$1.000
|
$0.010
|
$0.010
|
$0.150
|
$0.020
|
$3.600
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,505.000
|
$1.000
|
$0.020
|
$0.020
|
$0.150
|
$0.070
|
$0.680
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
837.000
|
$1.000
|
$0.030
|
$0.040
|
$1.000
|
$0.060
|
$0.930
|
$0.030
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
10,114.000
|
$1.000
|
$0.070
|
$0.070
|
$1.000
|
$0.100
|
$1.940
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
6.000
|
$2.500
|
$0.060
|
$100.000
|
$5.000
|
$0.070
|
$6.470
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
21.000
|
$5.660
|
$0.170
|
$100.000
|
$5.000
|
$0.240
|
$10.790
|
$0.180
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
71.000
|
$560.440
|
$500.000
|
$546.250
|
$1,000.000
|
$580.000
|
$638.660
|
$444.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
9,388.000
|
$1.000
|
$1.700
|
$1.960
|
$1.000
|
$2.000
|
$2.220
|
$1.540
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
7,443.000
|
$2.000
|
$2.400
|
$2.190
|
$2.000
|
$2.900
|
$3.190
|
$2.220
|
|
|
PED POLE ASSEMBLY
|
EA
|
38.000
|
$2,000.000
|
$1,400.000
|
$2,587.500
|
$3,500.000
|
$1,700.000
|
$1,819.610
|
$1,265.000
|
|
|
RELOCATE PED POLE ASSEMBLY
|
EA
|
9.000
|
$2,000.000
|
$1,600.000
|
$1,667.500
|
$2,500.000
|
$2,000.000
|
$2,190.730
|
$1,523.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
72.000
|
$664.370
|
$700.000
|
$1,445.000
|
$800.000
|
$840.000
|
$917.720
|
$638.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
7.000
|
$3,005.850
|
$4,500.000
|
$4,347.000
|
$4,800.000
|
$5,300.000
|
$5,827.080
|
$4,051.000
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
1,030.000
|
$2.590
|
$13.000
|
$13.800
|
$20.000
|
$14.750
|
$16.080
|
$11.180
|
|
|
REPLACE OF GROUND BOXES
|
EA
|
12.000
|
$2,000.000
|
$1,000.000
|
$1,288.000
|
$900.000
|
$1,200.000
|
$1,324.790
|
$921.000
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
1.000
|
$292.150
|
$400.000
|
$747.500
|
$500.000
|
$460.000
|
$506.330
|
$352.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
61.000
|
$133.130
|
$70.000
|
$86.250
|
$200.000
|
$79.000
|
$86.310
|
$60.000
|
|
|
REMOV PED SIG LED TRAF SIG LAMP UNIT
|
EA
|
55.000
|
$100.000
|
$130.000
|
$143.750
|
$80.000
|
$150.000
|
$166.860
|
$116.000
|
|
|
RELOCATE OF PEDESTRIAN PUSH BUTTON
|
EA
|
15.000
|
$413.250
|
$130.000
|
$86.250
|
$1,000.000
|
$160.000
|
$171.170
|
$119.000
|
|
|
CONC SIDEWALKS (5")(HISTORIC AREAS)
|
SY
|
34.000
|
$100.000
|
$285.000
|
$100.000
|
$500.000
|
$160.000
|
$224.060
|
$119.380
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,020.000
|
$117.500
|
$1.000
|
$54.000
|
$100.000
|
$64.000
|
$71.800
|
$32.460
|
|
|
TMA (STATIONARY)
|
DAY
|
510.000
|
$200.000
|
$1.000
|
$175.000
|
$300.000
|
$30.000
|
$287.690
|
$172.910
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
510.000
|
$240.000
|
$1.000
|
$200.000
|
$300.000
|
$50.000
|
$251.730
|
$172.910
|
|
Totals: |
$2,939,377.934
|
$2,547,784.790
|
$3,404,149.990
|
$3,645,746.300
|
$3,656,904.020
|
$4,069,678.164
|
$4,250,000.002
|