SALV,HAUL & STKPL RCL APH PV (2")
|
SY
|
1,200.000
|
$3.000
|
$15.950
|
$29.000
|
$11.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG64-22
|
TON
|
2.000
|
$200.000
|
$1,500.000
|
$1,650.000
|
$5,000.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
1,200.000
|
$20.000
|
$15.950
|
$29.000
|
$11.000
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
9,660.000
|
$15.000
|
$8.470
|
$12.000
|
$13.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
11,835.000
|
$13.000
|
$7.930
|
$11.500
|
$18.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
72.000
|
$175.000
|
$385.000
|
$330.000
|
$400.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
41.000
|
$200.000
|
$500.000
|
$298.000
|
$400.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
32.000
|
$120.000
|
$100.000
|
$266.500
|
$400.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
2,006.000
|
$250.000
|
$256.000
|
$527.000
|
$255.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
17,280.000
|
$40.000
|
$34.500
|
$49.500
|
$44.000
|
|
|
CLEAN & PAINT BASE PLATE
|
EA
|
14.000
|
$400.000
|
$1,400.000
|
$643.000
|
$6,500.000
|
|
|
SHOT BLASTING
|
SY
|
17,280.000
|
$4.000
|
$2.400
|
$5.000
|
$2.250
|
|
|
MILLING CONCRETE SLAB (1/4IN)
|
SY
|
2,400.000
|
$15.000
|
$13.200
|
$23.250
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$839,110.000
|
$750,500.000
|
$1,355,738.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$8,000.000
|
$11,500.000
|
$8,884.000
|
$18,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
156.000
|
$35.000
|
$30.000
|
$125.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$9.000
|
$10.000
|
$125.000
|
$10.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
66.000
|
$12.000
|
$11.000
|
$32.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,000.000
|
$4.000
|
$4.400
|
$9.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$2.000
|
$1.650
|
$1.500
|
$2.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$5,300.000
|
$2,500.000
|
$4,695.000
|
$8,500.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
15,390.000
|
$13.000
|
$6.000
|
$4.500
|
$11.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
3,930.000
|
$51.000
|
$47.000
|
$79.000
|
$65.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
3,780.000
|
$13.000
|
$6.000
|
$6.000
|
$18.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
3,930.000
|
$21.000
|
$8.000
|
$22.000
|
$18.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
60.000
|
$100.000
|
$100.000
|
$76.000
|
$150.000
|
|
|
PERM CTB (SGL SLOPE) (TY 4) (42 )
|
LF
|
10.000
|
$200.000
|
$200.000
|
$197.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,070.000
|
$1,000.000
|
$11,740.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$5,450.000
|
$750.000
|
$3,046.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$990.000
|
$9,200.000
|
$2,348.000
|
$12,000.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
762.000
|
$5.000
|
$2.750
|
$3.250
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
659.000
|
$5.000
|
$2.750
|
$3.250
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
1,971.000
|
$3.000
|
$1.930
|
$2.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
2,279.000
|
$3.000
|
$1.930
|
$2.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
52.000
|
$20.000
|
$15.400
|
$18.000
|
$18.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
765.000
|
$2.000
|
$7.000
|
$2.000
|
$5.000
|
|
PREFAB PAV MRK TY B (W)(4")(BRK)CNTST
|
LF
|
1,640.000
|
$0.500
|
$8.250
|
$9.500
|
$10.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
128.000
|
$5.000
|
$3.850
|
$4.500
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,491.000
|
$0.500
|
$0.550
|
$1.250
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
14,042.000
|
$0.100
|
$0.020
|
$0.130
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (7")
|
LF
|
1,640.000
|
$0.500
|
$0.040
|
$0.130
|
$0.100
|
|
|
REPAIR (STL POST RETROFIT)
|
EA
|
12.000
|
$100.000
|
$2,250.000
|
$1,713.000
|
$450.000
|
|
|
REPAIR METAL RAIL (C4)
|
LF
|
76.000
|
$100.000
|
$500.000
|
$158.500
|
$275.000
|
|
|
REPAIR (CORROSION MITIGATION)
|
EA
|
800.000
|
$15.000
|
$280.000
|
$120.500
|
$95.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
11.000
|
$120.000
|
$250.000
|
$108.000
|
$125.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
496.000
|
$25.000
|
$50.000
|
$37.000
|
$48.000
|
|
|
REPAIR STEEL (CORROSION MITIGATION)
|
EA
|
24.000
|
$30.000
|
$200.000
|
$235.000
|
$250.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
104.000
|
$400.000
|
$505.000
|
$508.000
|
$300.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
1,872.000
|
$700.000
|
$645.000
|
$622.000
|
$333.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
13,535.000
|
$120.000
|
$39.500
|
$41.500
|
$74.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
906.000
|
$300.000
|
$54.000
|
$202.500
|
$178.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
155.000
|
$2,000.000
|
$4,250.000
|
$2,701.000
|
$4,225.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS (LARGE
|
EA
|
16.000
|
$15,000.000
|
$12,800.000
|
$14,340.000
|
$19,850.000
|
|
|
POLYESTER POLYMER CONC OVERLAY (2-1/4")
|
SY
|
2,400.000
|
$225.000
|
$248.000
|
$368.000
|
$344.000
|
|
|
EMBEDDED GALVANIC ANODES
|
EA
|
3,240.000
|
$30.000
|
$20.000
|
$38.000
|
$55.000
|
|
|
FRP ENCAPSULATION
|
LS
|
1.000
|
$834,300.000
|
$1,125,000.000
|
$831,320.000
|
$1,100,000.000
|
|
|
CATHODIC PROTECTION SYSTEM
|
LS
|
1.000
|
$400,000.000
|
$679,000.000
|
$592,670.000
|
$1,228,000.000
|
|
|
FLOATING TURBIDITY BARRIER(FUR & INST)
|
LF
|
1,150.000
|
$100.000
|
$55.000
|
$110.000
|
$21.000
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
1,150.000
|
$50.000
|
$28.000
|
$41.000
|
$2.000
|
|
|
REPLACE ABOVE-GROUND CONDUIT
|
LF
|
5.000
|
$50.000
|
$500.000
|
$761.500
|
$50.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$11,500.000
|
$34,000.000
|
$13,453.000
|
$18,500.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(SLD)
|
LF
|
6,561.000
|
$0.800
|
$1.380
|
$2.000
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(BRK)
|
LF
|
2,560.000
|
$0.800
|
$1.490
|
$2.000
|
$2.000
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
6,561.000
|
$0.800
|
$1.380
|
$2.000
|
$2.000
|
|
|
TMA (STATIONARY)
|
DAY
|
12.000
|
$200.000
|
$750.000
|
$444.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
48.000
|
$70.000
|
$100.000
|
$108.000
|
$100.000
|
|
Totals: |
$9,230,111.300
|
$8,685,850.350
|
$10,089,272.160
|
$10,334,225.200
|