|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
16,092.000
|
$6.500
|
$4.150
|
$5.150
|
$4.000
|
$4.400
|
$5.000
|
$6.690
|
$7.700
|
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
81.000
|
$461.000
|
$809.000
|
$600.670
|
$540.000
|
$640.000
|
$300.000
|
$540.890
|
$2,500.000
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
211.000
|
$137.000
|
$164.000
|
$150.240
|
$82.000
|
$300.000
|
$150.000
|
$206.970
|
$475.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
3.890
|
$633.000
|
$2,110.000
|
$1,571.480
|
$1,168.000
|
$1,700.000
|
$850.000
|
$1,581.750
|
$1,950.000
|
|
|
|
FERTILIZER
|
TON
|
0.740
|
$850.000
|
$1,110.000
|
$1,024.900
|
$2,800.000
|
$830.000
|
$1,600.000
|
$804.760
|
$1,100.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
304.000
|
$18.000
|
$44.000
|
$66.050
|
$52.000
|
$30.000
|
$14.000
|
$26.640
|
$45.000
|
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
7,650.000
|
$70.000
|
$71.000
|
$71.980
|
$82.000
|
$95.000
|
$75.000
|
$91.520
|
$74.000
|
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
710.000
|
$180.000
|
$213.000
|
$175.820
|
$220.000
|
$210.000
|
$200.000
|
$204.240
|
$195.000
|
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
35,762.000
|
$3.000
|
$3.250
|
$2.720
|
$4.000
|
$3.100
|
$2.500
|
$6.970
|
$5.500
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
6,617.000
|
$4.250
|
$3.800
|
$4.990
|
$4.500
|
$3.900
|
$4.000
|
$5.630
|
$5.000
|
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
11,265.000
|
$3.000
|
$2.450
|
$2.920
|
$3.700
|
$2.900
|
$3.250
|
$3.080
|
$11.000
|
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
1,324.000
|
$90.000
|
$129.000
|
$137.090
|
$168.000
|
$87.000
|
$100.000
|
$163.990
|
$73.000
|
|
|
|
ASPH (AC-15P OR AC-20-5TR)
|
GAL
|
39,612.000
|
$3.000
|
$3.100
|
$3.520
|
$3.400
|
$3.500
|
$3.250
|
$2.810
|
$5.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
17.000
|
$82.000
|
$49.000
|
$159.300
|
$190.000
|
$100.000
|
$225.000
|
$133.200
|
$75.000
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.890
|
$232.000
|
$226.000
|
$174.190
|
$245.000
|
$1,100.000
|
$450.000
|
$159.840
|
$330.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
60.000
|
$210.000
|
$131.000
|
$279.880
|
$240.000
|
$210.000
|
$200.000
|
$294.150
|
$230.000
|
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.100
|
$1,000.000
|
$1,700.000
|
$1,255.200
|
$2,400.000
|
$1,500.000
|
$1,000.000
|
$1,110.000
|
$1,300.000
|
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
63.000
|
$500.000
|
$504.000
|
$705.610
|
$420.000
|
$540.000
|
$425.000
|
$740.370
|
$890.000
|
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
34.000
|
$525.000
|
$910.000
|
$1,226.790
|
$655.000
|
$590.000
|
$500.000
|
$622.710
|
$930.000
|
|
|
|
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
|
LF
|
72.000
|
$710.000
|
$888.000
|
$1,080.600
|
$950.000
|
$710.000
|
$675.000
|
$1,005.660
|
$1,300.000
|
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
6.000
|
$5,150.000
|
$4,800.000
|
$8,144.860
|
$9,300.000
|
$6,000.000
|
$6,000.000
|
$8,228.430
|
$8,500.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
4.000
|
$6,000.000
|
$6,830.000
|
$8,644.860
|
$9,300.000
|
$7,000.000
|
$10,000.000
|
$8,880.000
|
$10,700.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$5,830.000
|
$10,500.000
|
$16,164.720
|
$9,300.000
|
$10,000.000
|
$14,000.000
|
$10,664.880
|
$17,900.000
|
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
6.000
|
$5,830.000
|
$7,970.000
|
$16,074.770
|
$9,300.000
|
$12,000.000
|
$11,000.000
|
$8,341.650
|
$18,600.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
90.000
|
$1,067.000
|
$1,360.000
|
$1,116.470
|
$1,000.000
|
$1,700.000
|
$1,300.000
|
$1,229.880
|
$1,200.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,642.000
|
$1,710.000
|
$1,598.720
|
$1,500.000
|
$2,100.000
|
$1,900.000
|
$1,365.300
|
$1,700.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
19.000
|
$1,375.000
|
$1,460.000
|
$2,592.710
|
$800.000
|
$1,800.000
|
$875.000
|
$4,002.720
|
$3,000.000
|
|
|
|
REMOV STR (SET)
|
EA
|
108.000
|
$591.000
|
$391.000
|
$289.510
|
$710.000
|
$510.000
|
$250.000
|
$264.260
|
$375.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
1,894.000
|
$15.000
|
$10.000
|
$13.760
|
$24.000
|
$18.000
|
$8.000
|
$30.140
|
$7.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$343,765.000
|
$372,000.000
|
$381,100.000
|
$89,000.000
|
$99,945.930
|
$480,000.000
|
$314,575.660
|
$550,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$6,500.000
|
$2,700.000
|
$1,473.810
|
$5,000.000
|
$15,000.000
|
$2,600.000
|
$3,330.000
|
$6,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
30.000
|
$28.000
|
$72.000
|
$40.000
|
$42.000
|
$110.000
|
$32.000
|
$166.500
|
$70.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
30.000
|
$9.500
|
$44.000
|
$13.750
|
$29.000
|
$46.000
|
$15.000
|
$83.250
|
$60.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
78.000
|
$34.000
|
$25.000
|
$27.500
|
$36.000
|
$74.000
|
$25.000
|
$68.820
|
$55.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$8.500
|
$7.200
|
$11.750
|
$15.000
|
$17.500
|
$10.000
|
$44.400
|
$25.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,060.000
|
$2.400
|
$4.050
|
$2.650
|
$4.000
|
$3.200
|
$3.250
|
$3.720
|
$4.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,060.000
|
$0.770
|
$1.400
|
$0.880
|
$1.000
|
$0.650
|
$2.250
|
$1.390
|
$1.500
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
562.000
|
$22.000
|
$62.000
|
$73.550
|
$63.000
|
$150.000
|
$32.000
|
$25.880
|
$100.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,710.000
|
$24.000
|
$65.000
|
$37.730
|
$68.000
|
$120.000
|
$24.000
|
$25.880
|
$72.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
41,872.000
|
$0.200
|
$0.250
|
$0.180
|
$0.200
|
$0.140
|
$0.300
|
$0.220
|
$0.350
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
13,490.000
|
$0.180
|
$0.350
|
$0.260
|
$0.200
|
$0.170
|
$0.350
|
$0.200
|
$0.400
|
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
8.000
|
$222.000
|
$194.000
|
$193.500
|
$210.000
|
$780.000
|
$200.000
|
$225.330
|
$200.000
|
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
6.000
|
$4,000.000
|
$4,280.000
|
$4,127.520
|
$4,000.000
|
$4,600.000
|
$4,000.000
|
$4,329.000
|
$3,900.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,110.000
|
$10.000
|
$14.000
|
$14.880
|
$11.000
|
$17.500
|
$10.000
|
$15.540
|
$13.000
|
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
250.000
|
$28.000
|
$19.000
|
$41.340
|
$37.000
|
$17.250
|
$25.000
|
$43.290
|
$18.000
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
4,215.000
|
$2.250
|
$1.900
|
$1.570
|
$1.900
|
$2.000
|
$1.350
|
$1.610
|
$2.000
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,100.000
|
$701.000
|
$1,269.750
|
$1,800.000
|
$1,100.000
|
$1,000.000
|
$1,332.000
|
$640.000
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
|
EA
|
1.000
|
$7,500.000
|
$7,650.000
|
$8,812.550
|
$7,200.000
|
$7,900.000
|
$8,500.000
|
$9,213.000
|
$6,900.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
16.000
|
$537.000
|
$572.000
|
$550.500
|
$620.000
|
$560.000
|
$600.000
|
$715.950
|
$520.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
8.000
|
$745.000
|
$750.000
|
$718.500
|
$812.000
|
$820.000
|
$750.000
|
$782.550
|
$680.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
8.000
|
$673.000
|
$833.000
|
$797.250
|
$900.000
|
$720.000
|
$850.000
|
$852.480
|
$800.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$885.000
|
$1,000.000
|
$954.750
|
$1,100.000
|
$950.000
|
$1,000.000
|
$939.060
|
$900.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$890.000
|
$1,060.000
|
$1,007.250
|
$1,100.000
|
$1,200.000
|
$1,100.000
|
$967.920
|
$955.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$949.000
|
$972.000
|
$928.500
|
$1,000.000
|
$820.000
|
$650.000
|
$1,078.920
|
$880.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
42.000
|
$73.000
|
$67.000
|
$74.610
|
$73.000
|
$86.000
|
$100.000
|
$94.350
|
$60.000
|
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
10.000
|
$171.000
|
$167.000
|
$167.250
|
$180.000
|
$160.000
|
$200.000
|
$316.350
|
$150.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
52.000
|
$56.000
|
$117.000
|
$119.630
|
$126.000
|
$63.000
|
$150.000
|
$75.480
|
$110.000
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
7,907.000
|
$3.500
|
$1.650
|
$1.590
|
$1.800
|
$6.100
|
$1.750
|
$1.670
|
$1.750
|
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
8,160.000
|
$4.000
|
$1.650
|
$1.590
|
$1.800
|
$4.000
|
$1.750
|
$1.670
|
$1.750
|
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
23,693.000
|
$2.000
|
$1.100
|
$1.060
|
$1.200
|
$2.200
|
$1.250
|
$1.110
|
$1.000
|
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
20,172.000
|
$2.000
|
$1.100
|
$1.060
|
$1.200
|
$2.200
|
$1.250
|
$1.110
|
$1.000
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
76.000
|
$8.400
|
$17.000
|
$17.030
|
$18.000
|
$10.250
|
$20.000
|
$16.650
|
$15.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,144.000
|
$1.300
|
$1.100
|
$1.290
|
$1.000
|
$1.150
|
$1.000
|
$1.110
|
$1.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,144.000
|
$1.280
|
$1.100
|
$1.290
|
$1.000
|
$0.900
|
$1.000
|
$0.940
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,829.000
|
$0.580
|
$0.650
|
$0.680
|
$0.750
|
$0.750
|
$0.750
|
$0.670
|
$0.600
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
40.000
|
$6.000
|
$17.000
|
$18.190
|
$18.000
|
$5.000
|
$18.000
|
$16.650
|
$15.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
42,496.000
|
$0.220
|
$0.350
|
$0.320
|
$0.400
|
$0.270
|
$0.400
|
$0.330
|
$0.350
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
2,718.000
|
$0.270
|
$0.350
|
$0.370
|
$0.400
|
$0.300
|
$0.400
|
$0.360
|
$0.350
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
30,889.000
|
$0.230
|
$0.350
|
$0.320
|
$0.400
|
$0.280
|
$0.400
|
$0.330
|
$0.350
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
13.000
|
$170.000
|
$194.000
|
$191.250
|
$210.000
|
$210.000
|
$200.000
|
$194.250
|
$200.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
13.000
|
$221.000
|
$250.000
|
$243.750
|
$210.000
|
$250.000
|
$300.000
|
$249.750
|
$230.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
82.000
|
$3.150
|
$4.450
|
$5.390
|
$5.000
|
$2.400
|
$5.000
|
$4.440
|
$4.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,525.000
|
$3.000
|
$3.900
|
$3.740
|
$5.000
|
$3.700
|
$4.000
|
$3.890
|
$4.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,184.000
|
$1.350
|
$0.550
|
$0.610
|
$0.600
|
$1.300
|
$1.000
|
$0.560
|
$0.500
|
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$3,722.000
|
$1,560.000
|
$2,407.550
|
$2,400.000
|
$2,500.000
|
$5,500.000
|
$2,442.000
|
$1,500.000
|
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$562.000
|
$1,060.000
|
$381.050
|
$1,000.000
|
$740.000
|
$600.000
|
$299.700
|
$960.000
|
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
5,465.000
|
$80.000
|
$104.000
|
$102.420
|
$108.000
|
$90.000
|
$122.000
|
$109.130
|
$123.000
|
|
|
|
D-GR HMA TY-D PG64-22 (LEVEL-UP)
|
TON
|
6,636.000
|
$84.000
|
$118.000
|
$106.020
|
$113.000
|
$111.000
|
$130.000
|
$117.050
|
$123.000
|
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
9,261.000
|
$70.000
|
$105.000
|
$108.260
|
$118.000
|
$95.000
|
$115.000
|
$112.960
|
$125.000
|
|
|
|
TACK COAT
|
GAL
|
19,342.000
|
$3.000
|
$3.850
|
$3.850
|
$3.500
|
$2.900
|
$3.500
|
$4.350
|
$4.500
|
|
|
|
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
|
LF
|
96.000
|
$81.000
|
$76.500
|
$61.960
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
|
LF
|
1,304.000
|
$63.000
|
$44.000
|
$53.980
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
660.000
|
$90.000
|
$72.000
|
$68.000
|
$73.000
|
$63.000
|
$50.000
|
$72.150
|
$50.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
162.000
|
$200.000
|
$10.000
|
$187.820
|
$180.000
|
$270.000
|
$265.000
|
$222.000
|
$95.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
480.000
|
$75.000
|
$10.000
|
$139.390
|
$60.000
|
$52.000
|
$20.000
|
$72.150
|
$75.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,304.000
|
$63.000
|
$0.000
|
$0.000
|
$75.000
|
$82.000
|
$62.000
|
$68.820
|
$85.000
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
96.000
|
$81.000
|
$0.000
|
$0.000
|
$82.000
|
$130.000
|
$86.000
|
$82.140
|
$105.000
|
|
Totals: |
$4,476,289.040
|
$5,154,966.440
|
$5,278,765.832
|
$5,324,427.220
|
$5,384,504.000
|
$5,421,714.050
|
$5,709,111.958
|
$6,462,084.500
|