DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
112.000
|
$200.000
|
$175.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
42.000
|
$500.000
|
$540.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
5.000
|
$700.000
|
$800.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
14.000
|
$500.000
|
$660.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
48.000
|
$75.000
|
$140.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
220.000
|
$75.000
|
$180.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
16.000
|
$150.000
|
$280.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
64.000
|
$200.000
|
$300.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$5,000.000
|
$11,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,500.000
|
$1,800.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,500.000
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$1,500.000
|
$1,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$2,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
10.000
|
$1,500.000
|
$2,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$1,500.000
|
$2,900.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$5,500.000
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$5,900.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,500.000
|
$10,000.000
|
|
|
SET (TY II) (DES 2) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$7,500.000
|
$3,600.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
15.000
|
$2,000.000
|
$280.000
|
|
|
REMOV STR (SET)
|
EA
|
32.000
|
$500.000
|
$600.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,000.000
|
$600.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
9.000
|
$1,000.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
32.000
|
$20.000
|
$60.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$46,720.000
|
$163,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,000.000
|
$14,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
560.000
|
$2.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
560.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
385.000
|
$5.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
385.000
|
$1.000
|
$3.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
140.000
|
$30.000
|
$60.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$30.000
|
$60.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
140.000
|
$50.000
|
$12.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$12.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
140.000
|
$20.000
|
$26.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$26.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$15.000
|
$38.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$25.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$1,250.000
|
$3,800.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
14.000
|
$4,000.000
|
$5,200.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
2,820.000
|
$12.000
|
$14.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
160.000
|
$30.000
|
$30.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
10.000
|
$19.000
|
$110.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
9,340.000
|
$2.000
|
$1.500
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
|
EA
|
1.000
|
$60.000
|
$7,600.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
5.000
|
$500.000
|
$420.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
198.000
|
$75.000
|
$77.000
|
|
|
TMA (STATIONARY)
|
DAY
|
99.000
|
$100.000
|
$250.000
|
|
Totals: |
$543,920.000
|
$980,441.000
|