|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
243.000
|
$155.000
|
$650.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
10,365.000
|
$9.000
|
$8.500
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
34,549.000
|
$8.000
|
$4.000
|
|
|
PLANE CONC PAV(0" TO 1")
|
SY
|
5,635.000
|
$3.680
|
$12.000
|
|
|
FULL - DEPTH REPAIR CPCD (9")
|
SY
|
214.000
|
$214.000
|
$700.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
35,642.000
|
$8.000
|
$4.000
|
|
|
ADJUSTING MANHOLES & INLETS
|
EA
|
22.000
|
$3,000.000
|
$700.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$340,487.770
|
$294,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$6,500.000
|
$14,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
80.000
|
$5.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
80.000
|
$1.250
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
390.000
|
$8.000
|
$6.150
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
390.000
|
$2.000
|
$2.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
80.000
|
$9.000
|
$12.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
33.000
|
$820.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
1.000
|
$1,020.000
|
$1,350.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)
|
EA
|
1.000
|
$1,620.000
|
$1,600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U-2EXT)
|
EA
|
1.000
|
$1,700.000
|
$1,650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
37.000
|
$117.000
|
$120.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
17,070.000
|
$0.560
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
11,062.000
|
$0.410
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
1,671.000
|
$0.700
|
$6.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,442.000
|
$0.700
|
$3.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
4,141.000
|
$5.000
|
$11.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
826.000
|
$1.570
|
$4.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,241.000
|
$1.570
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,442.000
|
$1.480
|
$1.000
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
1,671.000
|
$0.660
|
$1.300
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
134.000
|
$0.580
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
3,010.000
|
$0.600
|
$1.250
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
11,214.000
|
$0.600
|
$1.250
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
4,141.000
|
$13.000
|
$16.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
7.000
|
$255.000
|
$450.000
|
|
PREFAB PAV MRK TY C (W) (TPL ARROW)
|
EA
|
2.000
|
$300.000
|
$750.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
9.000
|
$325.000
|
$460.000
|
|
PREFAB PAV MRK TY C (W) (ISLAND)
|
EA
|
1.000
|
$750.000
|
$1,350.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
4.000
|
$670.000
|
$1,100.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
10.000
|
$27.000
|
$90.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
166.000
|
$6.000
|
$11.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
350.000
|
$5.000
|
$11.500
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
150.000
|
$400.000
|
$275.000
|
|
|
D-GR HMA TY-D SAC-A PG64-22
|
TON
|
361.000
|
$212.000
|
$400.000
|
|
|
SP MIXES SP-C PG64-22 (LEVEL-UP)
|
TON
|
1,337.000
|
$120.000
|
$250.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
3,973.000
|
$130.000
|
$235.000
|
|
|
TACK COAT
|
GAL
|
2,073.000
|
$136.000
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$22,000.000
|
$25,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$8.000
|
$17.000
|
|
|
TMA (STATIONARY)
|
DAY
|
68.000
|
$275.000
|
$550.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$350.000
|
$5,500.000
|
|
Totals: |
$2,516,929.620
|
$2,977,919.300
|