|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
327.580
|
$17.500
|
$10.800
|
$25.000
|
$55.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
65,704.500
|
$7.200
|
$9.400
|
$6.000
|
$10.620
|
$6.500
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
295.670
|
$400.000
|
$425.000
|
$600.000
|
$370.000
|
$1,700.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
295.670
|
$150.000
|
$88.000
|
$200.000
|
$270.000
|
$200.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
67,300.000
|
$0.300
|
$0.300
|
$0.260
|
$0.320
|
$0.350
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
33,650.000
|
$0.300
|
$0.290
|
$0.260
|
$0.310
|
$0.320
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
33,650.000
|
$0.300
|
$0.290
|
$0.260
|
$0.310
|
$0.320
|
|
|
VEGETATIVE WATERING
|
MG
|
1,698.960
|
$18.000
|
$16.250
|
$10.000
|
$19.770
|
$10.000
|
|
|
PROOF ROLLING
|
HR
|
15.020
|
$75.000
|
$74.000
|
$75.000
|
$295.000
|
$60.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
16,971.120
|
$45.000
|
$65.000
|
$62.000
|
$55.000
|
$65.000
|
|
|
CEMENT
|
TON
|
4,049.970
|
$190.000
|
$210.000
|
$225.000
|
$229.000
|
$250.000
|
|
|
CEMENT TREAT (SUBGRADE)(6")
|
SY
|
101,826.590
|
$4.000
|
$1.900
|
$3.000
|
$3.770
|
$3.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
95,252.960
|
$4.000
|
$2.730
|
$3.250
|
$5.510
|
$4.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
19,050.650
|
$5.000
|
$2.400
|
$5.000
|
$3.580
|
$4.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
68,061.640
|
$3.300
|
$3.060
|
$3.600
|
$4.400
|
$3.500
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
1,454.240
|
$197.000
|
$157.000
|
$150.000
|
$125.500
|
$150.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
16,306.440
|
$120.000
|
$97.000
|
$118.000
|
$145.000
|
$145.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
1,386.670
|
$6.000
|
$7.100
|
$7.000
|
$5.500
|
$4.000
|
|
|
PLANE CONC PAV(0" TO 1-1/2")
|
SY
|
1,400.660
|
$5.000
|
$12.350
|
$7.000
|
$5.500
|
$20.000
|
|
|
FULL-DEPTH REPAIR CPCD (VAR DEPTH)
|
CY
|
100.000
|
$300.000
|
$425.000
|
$750.000
|
$765.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
23.000
|
$450.000
|
$475.000
|
$580.000
|
$474.000
|
$750.000
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
432.000
|
$50.000
|
$11.550
|
$32.000
|
$37.400
|
$12.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
300.000
|
$80.000
|
$64.250
|
$63.000
|
$51.250
|
$75.000
|
|
|
MILLING CONCRETE SLAB (1/4IN)
|
SY
|
300.000
|
$22.000
|
$26.600
|
$26.250
|
$16.500
|
$35.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$750,005.000
|
$286,000.000
|
$600,000.000
|
$295,000.000
|
$850,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$8,000.000
|
$925.000
|
$7,000.000
|
$9,600.000
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
840.000
|
$28.000
|
$30.000
|
$35.000
|
$32.450
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
840.000
|
$9.500
|
$8.050
|
$6.000
|
$8.800
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,440.000
|
$28.000
|
$2.410
|
$3.200
|
$2.640
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,440.000
|
$15.000
|
$0.760
|
$0.750
|
$0.850
|
$0.800
|
|
|
INTERSECTIONS (CONC)
|
SY
|
101.700
|
$95.000
|
$125.000
|
$115.000
|
$110.300
|
$120.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,210.200
|
$35.000
|
$82.000
|
$45.000
|
$21.000
|
$45.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
584.140
|
$65.000
|
$74.000
|
$90.000
|
$71.000
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,459.170
|
$30.000
|
$82.000
|
$42.000
|
$21.000
|
$50.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
64,753.000
|
$0.250
|
$0.100
|
$0.150
|
$0.120
|
$0.600
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
15,067.000
|
$0.450
|
$0.190
|
$0.200
|
$0.320
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
350.000
|
$20.000
|
$21.100
|
$22.000
|
$23.100
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$3,000.000
|
$1,455.000
|
$1,500.000
|
$1,600.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$4.500
|
$2.520
|
$3.000
|
$3.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,150.000
|
$2,110.000
|
$2,200.000
|
$2,310.000
|
$2,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$625.000
|
$297.000
|
$300.000
|
$325.000
|
$300.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
95.000
|
$230.000
|
$176.000
|
$190.000
|
$193.000
|
$400.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
6.000
|
$250.000
|
$186.000
|
$200.000
|
$204.000
|
$450.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$500.000
|
$497.000
|
$520.000
|
$545.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
23.000
|
$505.000
|
$398.000
|
$415.000
|
$435.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$60.000
|
$76.000
|
$80.000
|
$83.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$20.000
|
$20.200
|
$16.000
|
$17.000
|
$12.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
38.000
|
$70.000
|
$56.000
|
$56.000
|
$60.000
|
$70.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
44.000
|
$10.000
|
$10.100
|
$11.000
|
$11.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$40.000
|
$15.100
|
$30.000
|
$31.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
58,624.000
|
$0.200
|
$0.200
|
$0.200
|
$0.220
|
$0.220
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
273,809.000
|
$0.500
|
$0.260
|
$0.250
|
$0.280
|
$0.270
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
273,809.000
|
$0.500
|
$0.260
|
$0.250
|
$0.280
|
$0.270
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
83.000
|
$1.750
|
$1.500
|
$0.600
|
$1.100
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,409.000
|
$1.250
|
$1.500
|
$0.600
|
$1.100
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,858.000
|
$0.700
|
$0.760
|
$0.800
|
$0.850
|
$0.800
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
3,095.000
|
$0.350
|
$0.310
|
$0.330
|
$0.330
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
64,753.000
|
$0.400
|
$0.310
|
$0.330
|
$0.330
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
4,818.000
|
$0.300
|
$0.310
|
$0.330
|
$0.330
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
68,163.000
|
$0.450
|
$0.310
|
$0.330
|
$0.330
|
$0.350
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
728.000
|
$12.000
|
$12.100
|
$15.000
|
$13.200
|
$13.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
25.000
|
$200.000
|
$186.000
|
$200.000
|
$204.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
7.000
|
$285.000
|
$251.000
|
$260.000
|
$275.000
|
$260.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
12.000
|
$40.000
|
$25.250
|
$26.000
|
$28.000
|
$26.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
10.000
|
$50.000
|
$30.250
|
$32.000
|
$33.000
|
$35.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
260.000
|
$3.500
|
$3.050
|
$3.500
|
$3.300
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
946.000
|
$3.250
|
$3.050
|
$3.500
|
$3.300
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
58,624.000
|
$0.450
|
$0.660
|
$0.580
|
$0.610
|
$0.600
|
|
|
REMOVE CENTERLINE TEXTURING
|
LF
|
29,312.000
|
$8.000
|
$2.830
|
$5.000
|
$3.600
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$8,500.000
|
$15,000.000
|
$5,500.000
|
$5,000.000
|
|
Totals: |
$7,685,429.792
|
$6,632,538.482
|
$7,411,039.544
|
$7,891,538.441
|
$8,976,511.170
|