REMOVING CONC (RIPRAP)
|
SY
|
4.000
|
$40.000
|
$115.500
|
$32.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
270.000
|
$13.370
|
$46.000
|
$50.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
71.760
|
$325.000
|
$785.000
|
$1,700.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
14.000
|
$30.000
|
$43.000
|
$100.000
|
|
|
BACKFILL (TY A)
|
STA
|
76.070
|
$200.000
|
$225.000
|
$400.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
AC
|
0.700
|
$1,870.000
|
$2,525.000
|
$2,500.000
|
|
|
VEGETATIVE WATERING
|
MG
|
4.800
|
$25.000
|
$97.500
|
$200.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
9,480.000
|
$4.000
|
$3.000
|
$8.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
203.000
|
$160.000
|
$222.000
|
$220.000
|
|
|
D-GR HMA(SQ) TY-A PG64-22
|
TON
|
2,900.000
|
$100.000
|
$93.000
|
$120.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
3,028.000
|
$110.000
|
$109.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
1,522.000
|
$4.250
|
$4.900
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
110.000
|
$65.000
|
$190.000
|
$120.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
4.000
|
$400.000
|
$1,155.000
|
$900.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
9.000
|
$600.000
|
$1,040.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
78.000
|
$110.000
|
$94.500
|
$115.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
130.000
|
$100.000
|
$95.500
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
67.000
|
$100.000
|
$111.000
|
$125.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$2,400.000
|
$3,825.000
|
$5,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
1.000
|
$8,000.000
|
$9,450.000
|
$10,000.000
|
|
|
SET (TY I) (36 IN) (6: 1) (P)
|
EA
|
2.000
|
$6,066.660
|
$8,950.000
|
$6,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
55.000
|
$650.000
|
$745.000
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
$750.000
|
$855.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,020.000
|
$875.000
|
$1,800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
$1,300.000
|
$1,160.000
|
$2,100.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$2,000.000
|
$2,210.000
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$501.000
|
$255.000
|
$750.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,129.040
|
$1,510.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
171.000
|
$16.170
|
$21.000
|
$35.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$150,000.000
|
$97,500.000
|
$223,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$3,500.000
|
$1,500.000
|
$5,000.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
4.000
|
$150.000
|
$170.000
|
$100.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
375.000
|
$5.000
|
$6.050
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
375.000
|
$1.000
|
$1.050
|
$3.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
1,774.000
|
$20.000
|
$26.000
|
$60.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
8,188.000
|
$0.200
|
$0.330
|
$0.750
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
4,809.000
|
$0.200
|
$0.290
|
$1.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
9.000
|
$350.000
|
$245.000
|
$400.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
3.000
|
$410.000
|
$275.000
|
$400.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,122.000
|
$1.000
|
$1.550
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
157.000
|
$1.000
|
$1.260
|
$1.150
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
15,064.000
|
$0.300
|
$0.510
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
1,020.000
|
$0.300
|
$0.510
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
9,085.000
|
$0.300
|
$0.510
|
$0.420
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
55.000
|
$6.000
|
$6.100
|
$8.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$200.000
|
$205.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$250.000
|
$248.000
|
$325.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$500.000
|
$605.000
|
$700.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
561.000
|
$3.000
|
$4.100
|
$5.000
|
|
|
TMA (STATIONARY)
|
DAY
|
98.000
|
$250.000
|
$340.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$250.000
|
$101.000
|
$350.000
|
|
Totals: |
$1,210,852.930
|
$1,226,989.510
|
$1,832,399.350
|