REMOVING CONC (DRIVEWAYS)
|
SY
|
760.000
|
$20.000
|
$108.050
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
168.000
|
$2,000.000
|
$1,495.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
168.000
|
$500.000
|
$353.000
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
|
SY
|
18,582.000
|
$1.000
|
$0.440
|
|
|
VEGETATIVE WATERING
|
MG
|
157.000
|
$20.000
|
$78.580
|
|
|
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
|
CY
|
80.000
|
$200.000
|
$269.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,397.000
|
$125.000
|
$183.500
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
1,340.000
|
$5.000
|
$6.790
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
18.000
|
$130.000
|
$129.250
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
45.000
|
$750.000
|
$1,100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
110.000
|
$100.000
|
$100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$1,000.000
|
$1,375.000
|
|
|
SET (TY II) (21 IN) (RCP) (6: 1) (P)
|
EA
|
17.000
|
$1,200.000
|
$2,310.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$1,500.000
|
$2,860.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$4,015.000
|
|
|
REMOV STR (PIPE)
|
LF
|
110.000
|
$15.000
|
$82.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$403,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$10,000.000
|
$7,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,000.000
|
$5.000
|
$7.150
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$1.650
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (CONC)
|
SY
|
760.000
|
$120.000
|
$65.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
1,937.000
|
$80.000
|
$68.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
27,838.000
|
$1.000
|
$1.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
13,948.000
|
$1.000
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
525.000
|
$35.000
|
$28.600
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
525.000
|
$5.000
|
$3.300
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$200.000
|
$275.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,200.000
|
$3,190.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
49.000
|
$500.000
|
$357.500
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$800.000
|
$742.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
35.000
|
$600.000
|
$632.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
6.000
|
$900.000
|
$984.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
41.000
|
$100.000
|
$104.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
|
EA
|
20.000
|
$30.000
|
$16.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,518.000
|
$5.000
|
$3.350
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
85.000
|
$1.000
|
$1.380
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
31,868.000
|
$0.500
|
$0.680
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
2,930.000
|
$0.500
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
15,866.000
|
$0.500
|
$0.680
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
340.000
|
$50.000
|
$18.700
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
4.000
|
$150.000
|
$55.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
380.000
|
$5.000
|
$6.600
|
|
|
JT / CRCK SEAL (HOT - POURED RUBBER)
|
LF
|
33,314.000
|
$10.000
|
$4.400
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
6,542.000
|
$130.000
|
$208.000
|
|
|
TACK COAT
|
GAL
|
892.000
|
$6.000
|
$20.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
6,131.000
|
$150.000
|
$240.000
|
|
|
TACK COAT
|
GAL
|
3,344.000
|
$6.000
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$18,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
52.000
|
$350.000
|
$624.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
26.000
|
$350.000
|
$625.000
|
|
Totals: |
$4,082,106.000
|
$4,993,301.060
|