|
|
PREPARING ROW
|
STA
|
147.000
|
$3,500.000
|
$1,709.250
|
$700.000
|
$1,000.000
|
$2,500.000
|
$3,401.000
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
1,500.000
|
$15.000
|
$9.400
|
$50.000
|
$10.000
|
$8.000
|
$50.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
395.000
|
$27.000
|
$27.500
|
$50.000
|
$24.000
|
$17.500
|
$50.000
|
|
|
SUBGR WIDEN (OC)
|
STA
|
225.000
|
$1,448.000
|
$371.000
|
$440.000
|
$750.000
|
$530.000
|
$450.000
|
|
|
BLADING
|
LF
|
900.000
|
$1.450
|
$17.000
|
$12.000
|
$10.000
|
$2.500
|
$100.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
169.000
|
$220.000
|
$200.000
|
$200.000
|
$150.000
|
$10.000
|
$150.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
22,312.000
|
$1.250
|
$0.140
|
$0.250
|
$0.330
|
$0.250
|
$0.500
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
22,312.000
|
$1.500
|
$0.140
|
$0.250
|
$0.330
|
$0.250
|
$0.500
|
|
|
HYDRO MULCH SEED (PERM_RURAL_SANDY)
|
SY
|
44,623.000
|
$1.500
|
$0.450
|
$0.440
|
$0.590
|
$0.440
|
$0.500
|
|
|
VEGETATIVE WATERING
|
TGL
|
163.000
|
$325.000
|
$7.950
|
$20.000
|
$100.000
|
$45.000
|
$50.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
25,133.000
|
$7.000
|
$4.500
|
$4.850
|
$7.500
|
$5.250
|
$6.000
|
|
|
AGGR (TY-PB OR PL, GR-4)(SAC-B)
|
CY
|
537.000
|
$195.000
|
$224.000
|
$170.000
|
$225.000
|
$175.000
|
$300.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
11,892.000
|
$140.000
|
$134.000
|
$160.000
|
$150.000
|
$159.850
|
$200.000
|
|
|
TACK COAT
|
GAL
|
2,276.000
|
$25.000
|
$3.750
|
$4.200
|
$10.000
|
$5.250
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
250.000
|
$85.000
|
$112.000
|
$145.000
|
$95.000
|
$150.000
|
$120.000
|
|
|
CEM STABIL BKFL
|
CY
|
41.000
|
$135.000
|
$270.000
|
$250.000
|
$167.000
|
$175.000
|
$350.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,653.000
|
$10.000
|
$42.000
|
$40.000
|
$53.000
|
$150.000
|
$55.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
18.000
|
$1,055.000
|
$1,575.000
|
$1,500.000
|
$2,000.000
|
$1,330.000
|
$1,500.000
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
15.000
|
$325.000
|
$650.000
|
$600.000
|
$798.000
|
$710.000
|
$2,000.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
41.000
|
$175.000
|
$175.000
|
$280.000
|
$371.000
|
$175.000
|
$1,000.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
3.000
|
$225.000
|
$900.000
|
$265.000
|
$350.000
|
$350.000
|
$1,000.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
200.000
|
$700.000
|
$980.000
|
$900.000
|
$805.000
|
$600.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
144.000
|
$760.000
|
$675.000
|
$850.000
|
$800.000
|
$600.000
|
$550.000
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
24.000
|
$100.000
|
$385.000
|
$350.000
|
$205.000
|
$390.000
|
$450.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
32.000
|
$655.000
|
$1,320.000
|
$1,200.000
|
$900.000
|
$2,035.000
|
$1,000.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
8.000
|
$605.000
|
$1,100.000
|
$8.000
|
$1,270.000
|
$1,975.000
|
$1,000.000
|
|
|
CONC BOX CULV (10 FT X 4 FT)(EXTEND)
|
LF
|
12.000
|
$1,750.000
|
$2,200.000
|
$2,000.000
|
$1,400.000
|
$1,600.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
8.000
|
$125.000
|
$66.000
|
$60.000
|
$80.000
|
$155.000
|
$100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
92.000
|
$125.000
|
$75.000
|
$68.000
|
$90.000
|
$110.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
28.000
|
$140.000
|
$165.000
|
$150.000
|
$152.000
|
$170.000
|
$150.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
16.000
|
$260.000
|
$423.500
|
$385.000
|
$384.000
|
$395.000
|
$450.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
4.000
|
$39,748.000
|
$28,600.000
|
$26,000.000
|
$35,000.000
|
$24,500.000
|
$60,000.000
|
|
|
WINGWALL (SW - 0) (HW=6 FT)
|
EA
|
1.000
|
$15,250.000
|
$7,700.000
|
$7,000.000
|
$33,000.000
|
$13,750.000
|
$55,000.000
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
1.000
|
$30,000.000
|
$9,900.000
|
$9,000.000
|
$31,000.000
|
$16,000.000
|
$65,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
2.000
|
$20,000.000
|
$14,300.000
|
$13,000.000
|
$17,000.000
|
$7,240.000
|
$56,000.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$970.000
|
$880.000
|
$800.000
|
$1,065.000
|
$1,050.000
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,400.000
|
$990.000
|
$900.000
|
$1,200.000
|
$1,080.000
|
$1,850.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
11.000
|
$1,525.000
|
$1,045.000
|
$950.000
|
$1,250.000
|
$1,160.000
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
5.000
|
$2,000.000
|
$2,750.000
|
$2,500.000
|
$33,000.000
|
$1,600.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
23.000
|
$700.000
|
$770.000
|
$700.000
|
$930.000
|
$530.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,875.000
|
$1,650.000
|
$1,500.000
|
$2,000.000
|
$3,400.000
|
$2,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,100.000
|
$1,650.000
|
$1,500.000
|
$2,000.000
|
$1,975.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$450,000.000
|
$225,000.000
|
$250,000.000
|
$450,000.000
|
$510,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$7,000.000
|
$2,600.000
|
$6,000.000
|
$5,000.000
|
$35,000.000
|
$12,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$90.500
|
$118.000
|
$65.000
|
$100.000
|
$150.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
115.000
|
$400.000
|
$345.000
|
$125.000
|
$275.000
|
$325.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$230.000
|
$700.000
|
$125.000
|
$275.000
|
$850.000
|
$550.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
440.000
|
$50.000
|
$46.000
|
$48.000
|
$64.000
|
$48.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
440.000
|
$19.000
|
$8.500
|
$15.000
|
$20.000
|
$15.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
56.000
|
$2.000
|
$5.500
|
$8.000
|
$10.000
|
$8.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
56.000
|
$1.000
|
$5.500
|
$3.000
|
$3.000
|
$3.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
448.000
|
$7.500
|
$6.050
|
$8.000
|
$10.000
|
$8.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
448.000
|
$5.000
|
$2.200
|
$2.000
|
$2.000
|
$8.000
|
$9.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
327.000
|
$112.000
|
$204.000
|
$185.000
|
$125.000
|
$130.000
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
620.000
|
$80.000
|
$65.000
|
$75.800
|
$100.000
|
$75.000
|
$50.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,419.000
|
$60.000
|
$44.750
|
$68.000
|
$58.000
|
$55.000
|
$45.000
|
|
|
TURNOUTS (ACP)
|
SY
|
778.000
|
$87.000
|
$80.000
|
$111.000
|
$118.000
|
$80.000
|
$45.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,263.000
|
$26.000
|
$30.000
|
$23.000
|
$35.000
|
$25.970
|
$25.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
6.000
|
$385.000
|
$1,430.000
|
$1,375.000
|
$1,800.000
|
$1,342.000
|
$5,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,500.000
|
$3.500
|
$3.100
|
$3.000
|
$3.330
|
$2.500
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,200.000
|
$3,200.000
|
$3,125.000
|
$4,500.000
|
$3,429.000
|
$3,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$375.000
|
$385.000
|
$300.000
|
$330.000
|
$250.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
27.000
|
$335.000
|
$302.000
|
$280.000
|
$385.000
|
$290.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
6.000
|
$355.000
|
$302.000
|
$320.000
|
$430.000
|
$325.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$715.000
|
$704.000
|
$600.000
|
$1,000.000
|
$785.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
48.000
|
$750.000
|
$577.000
|
$650.000
|
$700.000
|
$529.300
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$1,000.000
|
$742.000
|
$700.000
|
$785.000
|
$590.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,000.000
|
$1,050.000
|
$825.000
|
$975.000
|
$733.700
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$1,050.000
|
$850.000
|
$965.000
|
$725.100
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,100.000
|
$1,045.000
|
$900.000
|
$1,080.000
|
$810.700
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,400.000
|
$1,235.000
|
$1,000.000
|
$1,250.000
|
$942.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
2.000
|
$1,100.000
|
$1,355.000
|
$1,050.000
|
$1,275.000
|
$958.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
60.000
|
$105.000
|
$104.500
|
$100.000
|
$100.000
|
$75.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
18.000
|
$24.000
|
$30.250
|
$32.000
|
$36.000
|
$27.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
10.000
|
$150.000
|
$82.500
|
$60.000
|
$130.000
|
$98.000
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$25.500
|
$11.000
|
$12.000
|
$34.000
|
$25.000
|
$50.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
940.000
|
$1.750
|
$2.000
|
$1.000
|
$1.200
|
$1.670
|
$6.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
44,597.000
|
$1.370
|
$1.200
|
$1.100
|
$1.600
|
$1.300
|
$1.000
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
15,130.000
|
$0.750
|
$0.800
|
$0.800
|
$0.920
|
$0.750
|
$1.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
12,138.000
|
$0.750
|
$0.800
|
$0.800
|
$0.920
|
$0.750
|
$1.000
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
187.000
|
$19.000
|
$27.500
|
$13.600
|
$25.830
|
$21.000
|
$20.000
|
|
PREFAB PM TY C (W)(RR XING)
|
EA
|
3.000
|
$550.000
|
$660.000
|
$675.000
|
$966.000
|
$785.000
|
$1,500.000
|
|
PREFAB PM TY C (W)(36")(YLD TRI)
|
EA
|
16.000
|
$80.000
|
$55.000
|
$75.000
|
$75.000
|
$61.000
|
$150.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
36.000
|
$7.000
|
$7.700
|
$6.000
|
$7.500
|
$6.000
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
312.000
|
$7.250
|
$7.700
|
$6.000
|
$7.500
|
$6.000
|
$6.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$4,000.000
|
$1,500.000
|
$3,500.000
|
$7,500.000
|
$1,800.000
|
$5,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
8.000
|
$2,200.000
|
$1,300.000
|
$3,000.000
|
$500.000
|
$1,800.000
|
$5,000.000
|
|
|
LED ROADSIDE SIGN
|
EA
|
6.000
|
$1,500.000
|
$3,046.000
|
$2,800.000
|
$5,000.000
|
$4,126.000
|
$12,500.000
|
|
Totals: |
$4,965,742.390
|
$3,916,261.960
|
$4,226,289.670
|
$4,791,330.960
|
$4,987,005.480
|
$6,010,294.500
|