|
|
REMOVING CONC (CURB)
|
LF
|
1,000.000
|
$6.000
|
$6.000
|
$5.000
|
|
|
FULL - DEPTH REPAIR CPCD (8")
|
SY
|
1,200.000
|
$60.000
|
$185.000
|
$335.000
|
|
|
FULL - DEPTH REPAIR CPJR (9")
|
SY
|
600.000
|
$60.000
|
$215.000
|
$355.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
42,342.000
|
$4.000
|
$1.450
|
$3.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,000.000
|
$270,000.000
|
$390,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$3,500.000
|
$37,500.000
|
$25,000.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
500.000
|
$1.000
|
$1.000
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
500.000
|
$5.000
|
$5.000
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
500.000
|
$1.000
|
$1.500
|
$3.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
500.000
|
$6.000
|
$5.000
|
$12.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
1,000.000
|
$6.000
|
$7.000
|
$25.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
787.000
|
$1.250
|
$1.250
|
$1.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
929.000
|
$1.250
|
$1.250
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
9.000
|
$1.600
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
921.000
|
$0.550
|
$1.250
|
$1.250
|
|
|
PAVEMENT SEALER 4"
|
LF
|
13,258.000
|
$0.200
|
$0.350
|
$0.350
|
|
|
PAVEMENT SEALER 8"
|
LF
|
930.000
|
$0.400
|
$0.500
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
432.000
|
$2.500
|
$1.500
|
$1.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
17.000
|
$40.000
|
$35.000
|
$35.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$40.000
|
$50.000
|
$50.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
2.000
|
$60.000
|
$50.000
|
$50.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
2,420.000
|
$0.250
|
$0.650
|
$0.650
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
32.000
|
$0.250
|
$2.000
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
1,970.000
|
$0.250
|
$0.650
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
8,836.000
|
$0.250
|
$0.650
|
$0.650
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
432.000
|
$12.000
|
$13.000
|
$13.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
17.000
|
$200.000
|
$210.000
|
$210.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$300.000
|
$350.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$250.000
|
$300.000
|
$300.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
188.000
|
$3.000
|
$4.250
|
$4.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
257.000
|
$4.000
|
$4.250
|
$4.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,852.000
|
$0.500
|
$0.600
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
318.000
|
$1.000
|
$1.250
|
$1.250
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
115.000
|
$5.000
|
$4.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
9.000
|
$50.000
|
$100.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
3.000
|
$50.000
|
$100.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
900.000
|
$0.200
|
$0.200
|
$0.200
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
400.000
|
$100.000
|
$75.000
|
$75.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
4,000.000
|
$6.000
|
$9.250
|
$7.500
|
|
|
CONTINUOUS DIAMOND GRINDING CONC PVMT
|
SY
|
23,642.000
|
$8.000
|
$8.050
|
$13.000
|
|
|
DOWEL BAR RETROFIT
|
EA
|
7,466.000
|
$56.000
|
$62.000
|
$150.000
|
|
|
SOIL DENS.AND RAISING CONC.SLABS(HDPF)
|
LB
|
217,758.000
|
$5.000
|
$3.500
|
$5.000
|
|
|
TMA (STATIONARY)
|
DAY
|
220.000
|
$250.000
|
$250.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$250.000
|
$100.000
|
$400.000
|
|
Totals: |
$2,434,309.050
|
$2,727,185.400
|
$4,187,339.000
|