PREPARING ROW
|
STA
|
57.150
|
$1,500.000
|
$1,400.000
|
$1,155.000
|
$3,000.000
|
$600.000
|
$9,500.000
|
$2,800.000
|
|
|
BACKFILL (TY A)
|
STA
|
20.790
|
$200.000
|
$250.000
|
$630.000
|
$247.000
|
$450.000
|
$150.000
|
$172.000
|
|
|
BULLDOZER WORK
|
HR
|
8.000
|
$1,000.000
|
$10.000
|
$147.000
|
$190.000
|
$350.000
|
$80.000
|
$100.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
5,891.000
|
$5.000
|
$2.500
|
$3.000
|
$2.400
|
$5.250
|
$2.000
|
$2.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
5,891.000
|
$1.000
|
$0.500
|
$0.500
|
$0.450
|
$1.250
|
$0.340
|
$0.200
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,945.000
|
$1.000
|
$0.400
|
$0.100
|
$0.450
|
$2.500
|
$0.340
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,945.000
|
$1.000
|
$0.450
|
$0.100
|
$0.450
|
$2.500
|
$0.340
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
412.000
|
$25.000
|
$1.000
|
$25.000
|
$113.500
|
$130.000
|
$15.000
|
$13.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-22
|
TON
|
871.480
|
$80.000
|
$125.000
|
$115.000
|
$132.000
|
$125.000
|
$110.550
|
$100.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
7,922.520
|
$3.000
|
$2.500
|
$1.500
|
$2.700
|
$1.750
|
$2.800
|
$2.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
10.000
|
$250.000
|
$250.000
|
$420.000
|
$481.000
|
$660.000
|
$365.000
|
$150.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
200.000
|
$60.000
|
$180.000
|
$300.000
|
$161.000
|
$180.000
|
$125.000
|
$80.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
30,260.000
|
$15.000
|
$22.000
|
$20.000
|
$29.000
|
$41.700
|
$27.000
|
$35.000
|
|
|
APPROACH SLAB
|
CY
|
39.500
|
$750.000
|
$1,000.000
|
$840.000
|
$867.000
|
$1,400.000
|
$500.000
|
$500.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
10.000
|
$80.000
|
$400.000
|
$630.000
|
$422.000
|
$550.000
|
$325.000
|
$30.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
179.000
|
$225.000
|
$300.000
|
$420.000
|
$332.000
|
$325.000
|
$145.000
|
$2,000.000
|
|
|
CONC STR REPR(REMOV AND REPL BACKWALL)
|
CY
|
20.800
|
$3,000.000
|
$2,000.000
|
$1,750.000
|
$2,700.000
|
$3,900.000
|
$1,700.000
|
$2,000.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
14.000
|
$230.000
|
$160.000
|
$315.000
|
$269.000
|
$100.000
|
$350.000
|
$200.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
86.000
|
$200.000
|
$200.000
|
$210.000
|
$146.000
|
$125.000
|
$110.000
|
$130.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
77.000
|
$475.000
|
$550.000
|
$735.000
|
$752.000
|
$625.000
|
$450.000
|
$500.000
|
|
|
ELASTOMERIC BEARING (LAMINATED)
|
EA
|
120.000
|
$900.000
|
$800.000
|
$2,520.000
|
$1,308.000
|
$2,100.000
|
$1,300.000
|
$5,000.000
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
43,827.000
|
$12.000
|
$10.000
|
$9.450
|
$9.000
|
$7.750
|
$4.000
|
$8.000
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
21,419.000
|
$4.500
|
$8.000
|
$6.300
|
$8.000
|
$3.650
|
$5.000
|
$6.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM III-A)
|
LS
|
1.000
|
$1,900,000.000
|
$1,400,000.000
|
$1,700,000.000
|
$1,663,200.000
|
$1,400,000.000
|
$1,260,000.000
|
$2,800,000.000
|
|
|
RETROFIT RAIL (TY T1W)
|
LF
|
2,317.000
|
$155.000
|
$110.000
|
$178.500
|
$114.000
|
$179.000
|
$110.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
52.000
|
$90.000
|
$100.000
|
$63.000
|
$95.000
|
$90.000
|
$95.000
|
$200.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
|
LF
|
52.000
|
$90.000
|
$100.000
|
$126.000
|
$109.000
|
$130.000
|
$95.000
|
$200.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
1.000
|
$30,000.000
|
$200,000.000
|
$52,500.000
|
$241,824.000
|
$255,000.000
|
$750,000.000
|
$200,000.000
|
|
|
ADJUST STL SHOES
|
EA
|
8.000
|
$2,000.000
|
$1,000.000
|
$3,150.000
|
$1,782.000
|
$3,000.000
|
$5,600.000
|
$20,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$409,570.650
|
$455,000.000
|
$484,000.000
|
$557,832.000
|
$541,000.000
|
$540,000.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$3,500.000
|
$4,000.000
|
$11,550.000
|
$3,180.000
|
$3,000.000
|
$15,000.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
390.000
|
$30.000
|
$40.000
|
$33.650
|
$25.000
|
$21.000
|
$18.950
|
$25.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
390.000
|
$10.000
|
$15.000
|
$11.220
|
$15.000
|
$6.000
|
$10.000
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$25.000
|
$40.000
|
$28.040
|
$52.800
|
$26.000
|
$28.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$15.000
|
$15.000
|
$11.220
|
$13.200
|
$7.800
|
$10.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
5,343.000
|
$5.000
|
$6.000
|
$5.550
|
$3.500
|
$3.600
|
$2.610
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,343.000
|
$1.000
|
$2.000
|
$1.120
|
$0.550
|
$0.400
|
$1.000
|
$2.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,475.000
|
$25.000
|
$22.000
|
$21.870
|
$29.000
|
$19.000
|
$22.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,650.000
|
$1,600.000
|
$2,240.290
|
$2,310.000
|
$2,000.000
|
$1,750.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
392.000
|
$5.000
|
$3.000
|
$3.360
|
$4.000
|
$3.000
|
$3.000
|
$2.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$100.000
|
$300.000
|
$280.390
|
$264.000
|
$300.000
|
$200.000
|
$200.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY III)
|
EA
|
4.000
|
$2,250.000
|
$2,000.000
|
$2,972.080
|
$3,630.000
|
$2,500.000
|
$2,750.000
|
$2,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
184.400
|
$40.000
|
$50.000
|
$26.920
|
$34.000
|
$26.000
|
$26.000
|
$28.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$500.000
|
$300.000
|
$504.690
|
$634.000
|
$480.000
|
$480.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
6.000
|
$500.000
|
$200.000
|
$543.950
|
$753.000
|
$570.000
|
$570.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$100.000
|
$532.730
|
$640.000
|
$485.000
|
$485.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$150.000
|
$100.000
|
$84.120
|
$132.000
|
$100.000
|
$100.000
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
26.000
|
$25.000
|
$20.000
|
$31.400
|
$9.600
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
26.000
|
$25.000
|
$20.000
|
$31.400
|
$9.600
|
$20.000
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
18.000
|
$30.000
|
$30.000
|
$29.160
|
$36.000
|
$40.000
|
$45.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
12.000
|
$25.000
|
$40.000
|
$29.160
|
$44.500
|
$40.000
|
$45.000
|
$30.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
26,285.000
|
$0.250
|
$0.240
|
$0.110
|
$0.150
|
$0.150
|
$0.200
|
$0.150
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
11,796.000
|
$0.750
|
$0.500
|
$0.390
|
$0.500
|
$0.330
|
$0.480
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,489.000
|
$0.750
|
$0.500
|
$0.390
|
$0.500
|
$0.330
|
$0.480
|
$0.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
266.000
|
$10.000
|
$4.000
|
$3.590
|
$4.250
|
$6.000
|
$4.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
22,892.000
|
$1.000
|
$0.300
|
$0.340
|
$0.410
|
$0.170
|
$0.250
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,548.000
|
$0.250
|
$0.500
|
$0.110
|
$0.150
|
$0.170
|
$0.250
|
$0.200
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
164.000
|
$100.000
|
$100.000
|
$110.000
|
$241.500
|
$93.000
|
$150.000
|
$400.000
|
|
|
REP STL BRIDGE MEMBER (BENT SWAY BRACE)
|
EA
|
6.000
|
$3,000.000
|
$12,000.000
|
$5,250.000
|
$9,240.000
|
$4,100.000
|
$7,000.000
|
$7,000.000
|
|
|
REP STL BRIDGE MEMBER (BOTTOM CHORD)
|
EA
|
7.000
|
$7,200.000
|
$12,000.000
|
$2,100.000
|
$9,240.000
|
$1,500.000
|
$9,000.000
|
$7,000.000
|
|
|
REP STL BRIDGE MEMBER (ANGLE PLATES)
|
EA
|
1.000
|
$4,500.000
|
$4,000.000
|
$4,200.000
|
$9,240.000
|
$3,500.000
|
$12,000.000
|
$10,000.000
|
|
|
REP STL BRDG MEMB (TRUSS PORTAL BRACE)
|
EA
|
2.000
|
$7,000.000
|
$30,000.000
|
$8,400.000
|
$13,200.000
|
$7,100.000
|
$8,000.000
|
$7,000.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
246.000
|
$50.000
|
$125.000
|
$157.500
|
$56.000
|
$130.000
|
$60.000
|
$100.000
|
|
Totals: |
$4,695,468.110
|
$4,656,945.550
|
$5,069,207.258
|
$5,413,939.264
|
$5,414,243.210
|
$5,436,753.140
|
$7,531,448.470
|