PREPARING ROW
|
AC
|
23.980
|
$200.000
|
$800.000
|
$23,892.350
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
5,487.400
|
$5.000
|
$42.000
|
$20.050
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
35,235.970
|
$1.000
|
$1.450
|
$1.840
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
AC
|
7.280
|
$500.000
|
$825.000
|
$881.430
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
AC
|
7.280
|
$500.000
|
$565.000
|
$622.540
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
AC
|
7.280
|
$500.000
|
$608.000
|
$629.640
|
|
|
VEGETATIVE WATERING
|
MG
|
1,233.260
|
$20.000
|
$10.000
|
$45.770
|
|
|
FL BS (RDWY DEL) (TY A GR 1-2)
|
TON
|
13,256.710
|
$40.000
|
$23.500
|
$53.730
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
33.500
|
$170.000
|
$205.000
|
$388.360
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
2,000.000
|
$4.000
|
$6.000
|
$10.980
|
|
|
CEMENT
|
TON
|
855.930
|
$170.000
|
$185.000
|
$235.850
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
2,000.000
|
$3.000
|
$6.000
|
$2.640
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
80,169.620
|
$2.500
|
$3.200
|
$3.860
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
19,193.050
|
$6.000
|
$4.000
|
$5.060
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,842.000
|
$180.000
|
$170.000
|
$409.360
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
80.000
|
$505.000
|
$325.000
|
$445.990
|
|
|
RETAINING WALL (DRILL SHAFT) (FACIA)
|
SF
|
4,629.000
|
$50.000
|
$106.000
|
$110.130
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
215.500
|
$90.000
|
$77.000
|
$180.240
|
|
|
RAIL (TY SSTR)
|
LF
|
565.400
|
$40.000
|
$145.000
|
$216.600
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
292.000
|
$1,180.000
|
$1,025.000
|
$2,157.040
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
158.000
|
$77.000
|
$105.000
|
$117.580
|
|
|
WINGWALL (FW - 0) (HW=11 FT)
|
EA
|
2.000
|
$45,000.000
|
$60,000.000
|
$39,820.580
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,280.000
|
$2,000.000
|
$7,964.120
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$950,000.000
|
$1,186,653.370
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$2,000.000
|
$800.000
|
$23,892.350
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
130.000
|
$16.000
|
$22.000
|
$39.490
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
35.000
|
$27.000
|
$33.500
|
$40.130
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
50.000
|
$59.000
|
$68.000
|
$76.580
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
215.000
|
$8.000
|
$7.500
|
$11.950
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
420.000
|
$18.000
|
$15.000
|
$29.590
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
420.000
|
$5.000
|
$3.000
|
$10.090
|
|
|
EXCAV (EROSN & SEDMT CONT, IN PLACE)
|
CY
|
30.000
|
$50.000
|
$150.000
|
$31.860
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
400.000
|
$3.000
|
$4.200
|
$4.090
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
400.000
|
$0.500
|
$1.600
|
$1.270
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
200.000
|
$4.000
|
$4.900
|
$6.850
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$0.800
|
$1.000
|
$1.990
|
|
|
CONC MEDIAN
|
SY
|
351.000
|
$70.000
|
$186.000
|
$82.510
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
102.000
|
$550.000
|
$500.000
|
$719.520
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
8.000
|
$600.000
|
$590.000
|
$693.760
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$22.000
|
$30.000
|
$39.430
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
518.000
|
$6.000
|
$13.150
|
$8.540
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
46,088.000
|
$0.500
|
$0.420
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
42,640.000
|
$0.500
|
$0.420
|
$0.430
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
8,416.570
|
$80.000
|
$114.000
|
$215.030
|
|
|
WHEEL STOPS
|
EA
|
376.000
|
$160.000
|
$60.000
|
$231.340
|
|
|
STATE PARK INFRASTRUCTURE
|
LS
|
1.000
|
$6,348,973.000
|
$6,700,000.000
|
$3,185,646.640
|
|
Totals: |
$10,178,414.620
|
$11,699,665.156
|
$11,939,400.461
|