|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
500.000
|
$15.000
|
$11.000
|
$25.000
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12"-14")
|
SY
|
3,295.000
|
$12.500
|
$15.220
|
$20.000
|
$15.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
1,230.000
|
$50.000
|
$30.000
|
$42.000
|
$35.000
|
|
|
BLADING
|
STA
|
61.200
|
$950.000
|
$190.000
|
$330.000
|
$400.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
23,649.000
|
$1.820
|
$3.120
|
$1.450
|
$4.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
1,140.000
|
$0.150
|
$0.110
|
$0.120
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
12,396.000
|
$0.120
|
$0.130
|
$0.130
|
$0.160
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
12,396.000
|
$0.120
|
$0.100
|
$0.110
|
$0.150
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
23,649.000
|
$0.650
|
$0.590
|
$0.650
|
$0.700
|
|
|
VEGETATIVE WATERING
|
MG
|
792.000
|
$4.000
|
$6.000
|
$40.000
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,796.000
|
$65.000
|
$75.000
|
$99.000
|
$85.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
277,216.000
|
$2.400
|
$2.650
|
$1.550
|
$3.350
|
|
|
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
|
SY
|
1,493.000
|
$4.000
|
$15.950
|
$18.500
|
$12.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
54.000
|
$740.000
|
$728.000
|
$750.000
|
$850.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
350.000
|
$50.000
|
$47.760
|
$90.000
|
$85.000
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
335.000
|
$63.000
|
$44.280
|
$90.000
|
$75.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
506.000
|
$280.000
|
$202.000
|
$308.000
|
$300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$681,500.000
|
$461,500.000
|
$710,000.000
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$5,000.000
|
$5,000.000
|
$15,500.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$34.000
|
$36.000
|
$41.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$10.000
|
$15.000
|
$17.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,530.000
|
$3.250
|
$3.050
|
$3.500
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,530.000
|
$0.600
|
$0.700
|
$0.800
|
$1.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
660.000
|
$95.000
|
$98.300
|
$107.000
|
$100.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
660.000
|
$14.200
|
$28.000
|
$45.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
660.000
|
$16.750
|
$30.000
|
$14.000
|
$25.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
500.000
|
$32.500
|
$22.500
|
$25.000
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,147.000
|
$1,575.000
|
$3,400.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$5.750
|
$2.500
|
$2.800
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$375.000
|
$200.000
|
$225.000
|
$250.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
4.000
|
$3,140.000
|
$2,775.000
|
$3,100.000
|
$3,300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,800.000
|
$2,000.000
|
$2,300.000
|
$2,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,200.000
|
$800.000
|
$900.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$12,885.000
|
$8,600.000
|
$9,700.000
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,012.750
|
$809.000
|
$905.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$750.000
|
$933.000
|
$1,045.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
42.000
|
$550.000
|
$408.000
|
$460.000
|
$475.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$665.000
|
$516.000
|
$575.000
|
$600.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
1.000
|
$500.000
|
$396.000
|
$445.000
|
$455.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
41.000
|
$145.000
|
$94.000
|
$105.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$26.000
|
$45.000
|
$50.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$55.500
|
$45.000
|
$50.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
51,820.000
|
$0.500
|
$0.200
|
$0.220
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
314,260.000
|
$0.800
|
$0.180
|
$0.200
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
3,010.000
|
$0.550
|
$0.200
|
$0.220
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
481,960.000
|
$0.500
|
$0.180
|
$0.200
|
$0.220
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
7,749.000
|
$1.500
|
$1.750
|
$2.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
20,880.000
|
$1.500
|
$1.750
|
$2.000
|
$3.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$280.000
|
$250.000
|
$280.000
|
$300.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
94.000
|
$15.900
|
$20.000
|
$23.000
|
$25.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
862.000
|
$4.750
|
$4.000
|
$4.500
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,588.000
|
$4.400
|
$3.700
|
$4.150
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
66,590.000
|
$1.500
|
$0.500
|
$0.560
|
$0.600
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
83,697.000
|
$7.500
|
$3.950
|
$4.700
|
$6.500
|
|
|
TBPFC PG76-22 SAC-A
|
TON
|
13,810.000
|
$245.000
|
$212.500
|
$295.000
|
$270.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,500.000
|
$20,000.000
|
$32,000.000
|
$25,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
18,330.000
|
$9.000
|
$3.500
|
$3.900
|
$4.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
15,556.000
|
$6.500
|
$3.500
|
$3.900
|
$4.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
91,650.000
|
$0.760
|
$0.800
|
$0.890
|
$0.900
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
17,190.000
|
$0.970
|
$0.800
|
$0.890
|
$0.900
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
146,200.000
|
$0.740
|
$0.800
|
$0.890
|
$0.900
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
1,180.000
|
$0.970
|
$0.800
|
$0.890
|
$0.900
|
|
|
TMA (STATIONARY)
|
DAY
|
125.000
|
$300.000
|
$200.000
|
$270.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
57.000
|
$230.000
|
$1.000
|
$55.000
|
$400.000
|
|
Totals: |
$7,493,215.920
|
$5,970,136.320
|
$7,570,385.340
|
$7,973,387.460
|