PREPARING ROW
|
STA
|
5.000
|
$3,000.000
|
$8,976.000
|
$77,301.250
|
$44,345.000
|
$40,000.000
|
$3,211.150
|
$13,000.000
|
$11,550.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
548.000
|
$10.000
|
$22.000
|
$15.800
|
$3.000
|
$23.000
|
$22.650
|
$20.000
|
$25.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,340.000
|
$15.000
|
$27.000
|
$15.120
|
$15.000
|
$15.000
|
$23.950
|
$20.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
450.000
|
$12.000
|
$31.000
|
$17.690
|
$8.000
|
$10.000
|
$17.870
|
$25.000
|
$50.000
|
|
|
EROSION CONTROL COMPOST (2")
|
SY
|
541.000
|
$2.500
|
$13.000
|
$11.650
|
$3.600
|
$3.440
|
$13.410
|
$5.000
|
$12.330
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
15,583.000
|
$2.000
|
$1.000
|
$1.500
|
$1.600
|
$1.000
|
$1.070
|
$1.250
|
$0.990
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
16,124.000
|
$1.000
|
$0.250
|
$0.150
|
$0.220
|
$0.200
|
$0.170
|
$0.250
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
566.000
|
$20.000
|
$17.000
|
$27.150
|
$17.500
|
$26.000
|
$31.240
|
$1.000
|
$51.590
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
541.000
|
$2.000
|
$3.000
|
$2.600
|
$2.000
|
$1.800
|
$2.990
|
$2.000
|
$2.770
|
|
|
SLV, HAUL & STKPL RCL APH PV(8" TO 14")
|
SY
|
1,510.000
|
$5.000
|
$7.000
|
$4.160
|
$6.800
|
$7.000
|
$6.830
|
$15.000
|
$6.330
|
|
|
CEM STABIL BKFL
|
CY
|
92.000
|
$158.640
|
$185.000
|
$151.600
|
$110.000
|
$100.000
|
$284.040
|
$220.000
|
$256.640
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
622.000
|
$208.460
|
$234.000
|
$201.530
|
$300.000
|
$150.000
|
$236.640
|
$200.000
|
$230.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
56.100
|
$1,129.880
|
$1,015.000
|
$1,309.440
|
$850.000
|
$700.000
|
$1,112.550
|
$1,100.000
|
$1,250.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
48.400
|
$1,032.000
|
$1,074.000
|
$1,503.110
|
$1,100.000
|
$1,100.000
|
$1,359.780
|
$1,200.000
|
$1,250.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
40.800
|
$1,339.000
|
$981.000
|
$1,169.870
|
$950.000
|
$700.000
|
$1,359.780
|
$1,200.000
|
$1,250.000
|
|
|
CL C CONC (MISC)
|
CY
|
8.000
|
$800.000
|
$1,004.000
|
$1,148.350
|
$750.000
|
$800.000
|
$981.450
|
$800.000
|
$700.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
6,900.000
|
$23.360
|
$22.000
|
$23.180
|
$18.000
|
$22.000
|
$30.320
|
$22.000
|
$22.500
|
|
|
APPROACH SLAB (HPC)
|
CY
|
113.400
|
$525.000
|
$524.000
|
$592.220
|
$500.000
|
$500.000
|
$498.520
|
$650.000
|
$500.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
890.520
|
$172.400
|
$236.000
|
$161.060
|
$150.000
|
$350.000
|
$197.030
|
$170.000
|
$300.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
2,457.000
|
$100.000
|
$110.000
|
$66.250
|
$85.000
|
$120.000
|
$125.640
|
$142.000
|
$117.260
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
47.000
|
$685.000
|
$471.000
|
$645.340
|
$475.000
|
$500.000
|
$581.760
|
$550.000
|
$600.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
340.000
|
$100.000
|
$162.000
|
$147.180
|
$120.000
|
$100.000
|
$128.410
|
$120.000
|
$150.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
97.000
|
$95.700
|
$61.000
|
$124.410
|
$100.000
|
$100.000
|
$110.620
|
$85.000
|
$75.000
|
|
|
GABIONS (GALV)
|
CY
|
218.000
|
$209.790
|
$330.000
|
$187.270
|
$225.000
|
$250.000
|
$356.640
|
$325.000
|
$342.900
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$65,000.000
|
$56,100.000
|
$42,844.030
|
$154,200.000
|
$50,000.000
|
$95,772.000
|
$50,000.000
|
$35,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$178,423.000
|
$200,000.000
|
$209,660.000
|
$223,000.000
|
$230,000.000
|
$225,000.000
|
$210,000.000
|
$200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$6,800.000
|
$3,927.000
|
$1,892.040
|
$4,250.000
|
$4,500.000
|
$2,685.300
|
$2,500.000
|
$7,350.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
239.000
|
$32.000
|
$63.000
|
$56.860
|
$60.000
|
$45.000
|
$65.420
|
$5.000
|
$40.850
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
239.000
|
$10.000
|
$10.000
|
$8.940
|
$9.000
|
$10.000
|
$10.290
|
$5.000
|
$17.200
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
468.000
|
$26.000
|
$29.000
|
$26.430
|
$25.000
|
$23.000
|
$30.420
|
$1.000
|
$23.650
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
468.000
|
$10.000
|
$8.000
|
$7.020
|
$7.000
|
$7.500
|
$8.070
|
$1.000
|
$12.900
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,732.000
|
$3.000
|
$2.000
|
$2.000
|
$2.000
|
$1.900
|
$2.300
|
$1.000
|
$1.610
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,732.000
|
$0.500
|
$0.500
|
$0.430
|
$0.750
|
$0.800
|
$0.500
|
$1.000
|
$0.160
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
245.000
|
$4.000
|
$4.000
|
$3.370
|
$3.150
|
$3.000
|
$3.870
|
$8.000
|
$2.960
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
245.000
|
$1.000
|
$1.000
|
$0.560
|
$1.000
|
$1.000
|
$0.650
|
$2.000
|
$1.080
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,196.000
|
$80.000
|
$67.000
|
$89.940
|
$115.000
|
$120.000
|
$118.350
|
$108.000
|
$164.520
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
2,640.000
|
$12.000
|
$11.000
|
$10.950
|
$11.500
|
$8.000
|
$9.820
|
$80.000
|
$10.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
4,560.000
|
$5.000
|
$6.000
|
$2.420
|
$2.500
|
$6.000
|
$5.230
|
$5.000
|
$5.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
2,640.000
|
$5.000
|
$11.000
|
$4.820
|
$9.500
|
$7.000
|
$9.820
|
$10.000
|
$10.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
1,460.000
|
$0.500
|
$4.000
|
$2.770
|
$3.400
|
$2.750
|
$5.450
|
$4.000
|
$1.290
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
487.500
|
$25.000
|
$22.000
|
$20.160
|
$24.000
|
$20.000
|
$23.200
|
$25.000
|
$23.650
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,850.000
|
$1,795.000
|
$1,612.960
|
$1,800.000
|
$1,600.000
|
$1,856.000
|
$1,600.000
|
$2,238.190
|
|
|
TRANSITION ADJUSTMENT
|
EA
|
2.000
|
$400.000
|
$561.000
|
$504.050
|
$850.000
|
$500.000
|
$580.000
|
$700.000
|
$913.750
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,170.000
|
$1,234.000
|
$1,108.910
|
$1,300.000
|
$1,100.000
|
$1,276.000
|
$1,200.000
|
$1,064.250
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$860.000
|
$561.000
|
$504.050
|
$650.000
|
$500.000
|
$580.000
|
$600.000
|
$698.750
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
575.000
|
$5.000
|
$3.000
|
$2.520
|
$3.100
|
$2.500
|
$2.900
|
$4.000
|
$2.150
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$215.000
|
$140.000
|
$126.010
|
$315.000
|
$125.000
|
$145.000
|
$500.000
|
$322.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,660.000
|
$2,861.000
|
$2,570.650
|
$3,000.000
|
$2,550.000
|
$2,958.000
|
$2,800.000
|
$2,795.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$260.000
|
$281.000
|
$252.030
|
$325.000
|
$250.000
|
$290.000
|
$500.000
|
$322.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,680.000
|
$1,010.000
|
$907.290
|
$750.000
|
$800.000
|
$1,044.000
|
$3,000.000
|
$1,786.130
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,200.000
|
$785.000
|
$705.670
|
$750.000
|
$700.000
|
$812.000
|
$1,000.000
|
$893.060
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$9,910.000
|
$8,191.000
|
$7,359.110
|
$7,500.000
|
$8,000.000
|
$8,468.000
|
$10,000.000
|
$12,688.590
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
4.000
|
$22.000
|
$20.000
|
$18.150
|
$18.500
|
$18.000
|
$20.880
|
$30.000
|
$25.800
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
3.000
|
$20.000
|
$20.000
|
$18.150
|
$18.500
|
$18.000
|
$20.880
|
$30.000
|
$25.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
5.000
|
$38.000
|
$28.000
|
$25.200
|
$21.500
|
$25.000
|
$29.000
|
$30.000
|
$31.180
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
7.000
|
$31.000
|
$28.000
|
$25.200
|
$21.500
|
$25.000
|
$29.000
|
$30.000
|
$31.180
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,137.000
|
$0.750
|
$2.000
|
$1.110
|
$1.300
|
$1.650
|
$2.200
|
$1.150
|
$1.180
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,299.000
|
$0.750
|
$2.000
|
$1.110
|
$1.300
|
$1.650
|
$1.280
|
$1.150
|
$1.180
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
247.000
|
$1.000
|
$1.000
|
$1.210
|
$1.400
|
$2.220
|
$1.390
|
$1.250
|
$1.290
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$200.000
|
$151.000
|
$120.970
|
$140.000
|
$155.100
|
$139.200
|
$150.000
|
$129.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$215.000
|
$185.000
|
$226.820
|
$260.000
|
$159.530
|
$261.000
|
$250.000
|
$241.880
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
864.000
|
$1.000
|
$1.000
|
$0.550
|
$0.650
|
$0.820
|
$0.640
|
$0.750
|
$0.590
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
215.000
|
$1.000
|
$1.000
|
$0.400
|
$0.600
|
$0.830
|
$0.460
|
$1.000
|
$0.430
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
2,907.000
|
$1.000
|
$1.000
|
$0.400
|
$0.600
|
$0.780
|
$1.600
|
$0.500
|
$0.430
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,221.000
|
$1.000
|
$1.000
|
$1.010
|
$1.150
|
$1.110
|
$1.160
|
$1.000
|
$1.080
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
495.000
|
$1.000
|
$1.000
|
$1.010
|
$1.150
|
$1.110
|
$1.160
|
$1.000
|
$1.080
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,186.000
|
$1.000
|
$1.000
|
$1.010
|
$1.150
|
$1.110
|
$1.160
|
$1.000
|
$1.080
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
88.000
|
$3.000
|
$11.000
|
$8.060
|
$9.250
|
$5.540
|
$9.280
|
$10.000
|
$8.600
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,901.000
|
$1.000
|
$1.000
|
$0.760
|
$0.900
|
$1.110
|
$0.870
|
$1.000
|
$0.810
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
247.000
|
$1.000
|
$1.000
|
$1.510
|
$1.750
|
$2.220
|
$1.740
|
$2.000
|
$1.610
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$50.000
|
$112.000
|
$100.810
|
$115.000
|
$99.710
|
$116.000
|
$200.000
|
$107.500
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$60.000
|
$112.000
|
$100.810
|
$115.000
|
$99.710
|
$116.000
|
$200.000
|
$107.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
3,986.000
|
$0.100
|
$1.000
|
$0.450
|
$0.550
|
$0.750
|
$0.520
|
$0.500
|
$0.480
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
247.000
|
$0.200
|
$1.000
|
$1.510
|
$1.750
|
$0.780
|
$1.740
|
$2.000
|
$1.610
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$21.000
|
$84.000
|
$50.410
|
$60.000
|
$55.400
|
$58.000
|
$100.000
|
$53.750
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$26.000
|
$84.000
|
$65.530
|
$75.000
|
$55.400
|
$75.400
|
$100.000
|
$69.880
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
756.000
|
$100.000
|
$103.000
|
$92.740
|
$96.000
|
$92.000
|
$106.720
|
$115.000
|
$99.000
|
|
|
TACK COAT
|
GAL
|
545.000
|
$3.000
|
$3.000
|
$6.050
|
$6.250
|
$6.000
|
$6.960
|
$8.000
|
$6.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
191.000
|
$120.000
|
$184.000
|
$151.210
|
$156.000
|
$150.000
|
$174.000
|
$200.000
|
$160.000
|
|
|
BAT HOUSE (LARGE)
|
EA
|
6.000
|
$2,500.000
|
$2,805.000
|
$1,168.040
|
$3,750.000
|
$1,500.000
|
$2,581.980
|
$2,500.000
|
$800.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,950.000
|
$17,840.000
|
$10,174.510
|
$14,000.000
|
$10,000.000
|
$3,480.000
|
$15,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
12.000
|
$250.000
|
$393.000
|
$110.850
|
$250.000
|
$275.000
|
$290.000
|
$200.000
|
$210.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
112.000
|
$60.000
|
$90.000
|
$54.530
|
$60.000
|
$100.000
|
$87.000
|
$25.000
|
$52.500
|
|
Totals: |
$1,962,659.036
|
$2,139,284.220
|
$2,204,599.003
|
$2,239,340.080
|
$2,289,621.720
|
$2,298,110.445
|
$2,366,096.300
|
$2,388,422.745
|