PREPARING ROW
|
STA
|
32.000
|
$15,000.000
|
$1,000.000
|
$4,000.000
|
$1,500.000
|
$6,300.000
|
$3,500.000
|
|
|
REMOV CONC (PAV)
|
SY
|
3,091.000
|
$22.000
|
$22.500
|
$21.000
|
$35.000
|
$16.280
|
$45.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
30.000
|
$70.000
|
$30.000
|
$42.000
|
$25.000
|
$40.710
|
$29.000
|
|
|
REMOV CONC (CURB)
|
LF
|
175.000
|
$3.000
|
$10.000
|
$15.750
|
$25.000
|
$22.050
|
$10.000
|
|
|
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
|
SY
|
9,101.000
|
$12.000
|
$8.000
|
$10.500
|
$12.000
|
$14.270
|
$15.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
3,019.000
|
$70.000
|
$13.000
|
$15.000
|
$36.000
|
$17.290
|
$75.000
|
|
|
EMBANK (FNL)(OC)(TY A)
|
CY
|
4,044.000
|
$80.000
|
$23.000
|
$70.000
|
$102.000
|
$56.950
|
$100.000
|
|
|
EMBANK (FNL)(OC)(TY D)
|
CY
|
2,135.000
|
$60.000
|
$27.000
|
$15.000
|
$17.000
|
$19.500
|
$60.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
13,428.000
|
$7.000
|
$1.380
|
$6.000
|
$1.500
|
$3.840
|
$3.000
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
13,428.000
|
$3.000
|
$0.260
|
$1.000
|
$0.300
|
$0.950
|
$0.500
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
6,715.000
|
$0.300
|
$0.170
|
$0.500
|
$0.200
|
$0.880
|
$0.050
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
6,715.000
|
$0.300
|
$0.170
|
$0.500
|
$0.200
|
$0.900
|
$0.050
|
|
|
VEGETATIVE WATERING
|
TGL
|
471.000
|
$165.000
|
$70.000
|
$70.000
|
$75.000
|
$110.000
|
$80.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL)
|
SY
|
6,715.000
|
$1.500
|
$3.030
|
$2.000
|
$3.500
|
$3.750
|
$1.750
|
|
|
LIME (COMMERCIAL LIME SLURRY)
|
TON
|
635.000
|
$400.000
|
$325.000
|
$32.100
|
$400.000
|
$401.250
|
$300.000
|
|
|
LIME TRT (EXIST MATL & NEW BASE)(8")
|
SY
|
8,451.000
|
$4.200
|
$6.000
|
$3.150
|
$12.000
|
$22.820
|
$14.000
|
|
|
SALV,HAUL & STKPL RCL APH PV (2")
|
SY
|
7,964.000
|
$4.000
|
$8.000
|
$6.300
|
$3.000
|
$3.750
|
$6.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
1,680.000
|
$20.000
|
$10.500
|
$7.150
|
$8.500
|
$12.740
|
$1.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,218.000
|
$120.000
|
$160.000
|
$124.600
|
$128.000
|
$177.580
|
$95.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
1,305.000
|
$180.000
|
$215.000
|
$168.200
|
$217.000
|
$234.390
|
$135.000
|
|
|
TACK COAT
|
GAL
|
2,275.000
|
$5.000
|
$8.000
|
$1.000
|
$0.010
|
$7.800
|
$1.000
|
|
|
CONC PVMT (CRCP) (8")
|
SY
|
7,831.000
|
$110.000
|
$102.000
|
$120.000
|
$107.000
|
$124.770
|
$170.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
749.000
|
$14.000
|
$100.000
|
$5.250
|
$1.500
|
$21.000
|
$18.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
28.000
|
$800.000
|
$689.000
|
$715.000
|
$725.000
|
$1,440.000
|
$1,100.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
16.000
|
$1,000.000
|
$928.000
|
$962.500
|
$1,000.000
|
$1,440.000
|
$1,100.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
6,700.000
|
$80.000
|
$120.000
|
$105.000
|
$156.000
|
$115.500
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
103.000
|
$800.000
|
$715.000
|
$840.000
|
$750.000
|
$787.500
|
$1,000.000
|
|
|
RAIL (TY SSTR)
|
LF
|
1,415.000
|
$55.000
|
$90.000
|
$100.000
|
$95.000
|
$108.120
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
515.000
|
$138.000
|
$80.000
|
$100.000
|
$105.000
|
$152.250
|
$150.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
234.000
|
$155.000
|
$117.000
|
$120.000
|
$120.000
|
$222.600
|
$150.000
|
|
|
INLET (COMPL)(FGR)(FTW)
|
EA
|
5.000
|
$13,500.000
|
$11,660.000
|
$15,750.000
|
$12,500.000
|
$13,750.000
|
$16,000.000
|
|
|
INLET (COMPL)(AD)(3FT X 3FT)(FTW)
|
EA
|
2.000
|
$13,250.000
|
$9,540.000
|
$10,500.000
|
$10,000.000
|
$13,125.000
|
$9,000.000
|
|
|
MANH (COMPL)(TY SD)(3FT X 3FT)(FTW)
|
EA
|
1.000
|
$7,000.000
|
$6,360.000
|
$10,500.000
|
$8,000.000
|
$12,240.000
|
$7,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$2,000.000
|
$1,590.000
|
$2,100.000
|
$2,400.000
|
$1,751.000
|
$1,900.000
|
|
|
REMOV STR (PIPE)
|
LF
|
80.000
|
$45.000
|
$26.500
|
$21.000
|
$32.000
|
$20.600
|
$24.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$519,260.070
|
$450,000.000
|
$500,000.000
|
$600,000.000
|
$422,207.560
|
$747,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$18,000.000
|
$4,000.000
|
$42,000.000
|
$30,000.000
|
$19,380.000
|
$40,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
340.000
|
$120.000
|
$300.000
|
$105.000
|
$125.000
|
$131.250
|
$80.000
|
|
|
TMA (STATIONARY)
|
DAY
|
340.000
|
$280.000
|
$300.000
|
$157.500
|
$300.000
|
$204.750
|
$50.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$40.000
|
$59.000
|
$75.000
|
$65.000
|
$68.850
|
$42.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$20.000
|
$23.750
|
$25.000
|
$25.000
|
$17.550
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
160.000
|
$40.000
|
$41.580
|
$35.000
|
$45.000
|
$47.250
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
160.000
|
$20.000
|
$15.170
|
$11.000
|
$16.000
|
$14.850
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,450.000
|
$3.500
|
$5.750
|
$4.000
|
$6.250
|
$4.860
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,450.000
|
$1.200
|
$1.500
|
$1.250
|
$1.750
|
$1.620
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
240.000
|
$20.000
|
$14.750
|
$7.500
|
$16.000
|
$9.110
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
240.000
|
$3.500
|
$1.660
|
$1.500
|
$2.000
|
$1.690
|
$1.500
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
2,340.000
|
$30.000
|
$35.000
|
$10.000
|
$20.000
|
$23.100
|
$10.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,230.000
|
$6.000
|
$12.500
|
$7.500
|
$18.000
|
$18.900
|
$15.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
2,340.000
|
$20.000
|
$20.000
|
$10.000
|
$16.000
|
$16.800
|
$10.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
169.000
|
$60.000
|
$66.000
|
$75.000
|
$70.000
|
$57.750
|
$70.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
768.000
|
$0.150
|
$10.000
|
$6.000
|
$14.000
|
$12.850
|
$10.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
325.000
|
$24.000
|
$27.560
|
$29.000
|
$29.000
|
$33.750
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,000.000
|
$2,332.000
|
$3,500.000
|
$2,500.000
|
$2,497.500
|
$4,100.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$800.000
|
$1,908.000
|
$2,100.000
|
$2,000.000
|
$1,714.500
|
$1,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$5.000
|
$3.180
|
$4.000
|
$3.500
|
$3.380
|
$3.250
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$400.000
|
$318.000
|
$350.000
|
$335.000
|
$337.500
|
$240.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$800.000
|
$318.000
|
$350.000
|
$335.000
|
$337.500
|
$240.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$3,551.000
|
$4,000.000
|
$3,750.000
|
$4,185.000
|
$3,600.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,500.000
|
$2,500.000
|
$2,500.000
|
$4,400.000
|
$2,875.000
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$2,000.000
|
$3,500.000
|
$1,035.000
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$10,000.000
|
$11,500.000
|
$12,600.000
|
$13,000.000
|
$10,580.000
|
$16,000.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
1,285.000
|
$50.000
|
$45.000
|
$42.000
|
$40.000
|
$34.650
|
$26.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
640.000
|
$35.000
|
$36.040
|
$40.000
|
$38.000
|
$77.700
|
$46.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$800.000
|
$610.000
|
$635.000
|
$650.000
|
$1,068.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$850.000
|
$864.000
|
$900.000
|
$925.000
|
$1,320.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$1,100.000
|
$1,050.000
|
$1,100.000
|
$1,150.000
|
$936.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$1,200.000
|
$2,327.000
|
$2,500.000
|
$2,500.000
|
$3,120.000
|
$4,100.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
3.000
|
$4,800.000
|
$4,505.000
|
$5,000.000
|
$4,800.000
|
$6,120.000
|
$9,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$180.000
|
$120.000
|
$200.000
|
$167.000
|
$252.000
|
$310.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$48,000.000
|
$34,980.000
|
$40,000.000
|
$37,000.000
|
$69,600.000
|
$43,000.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
2.000
|
$48,000.000
|
$40,280.000
|
$45,000.000
|
$43,000.000
|
$81,600.000
|
$55,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$7,000.000
|
$12,200.000
|
$12,600.000
|
$13,000.000
|
$22,800.000
|
$10,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
3.000
|
$55.000
|
$58.000
|
$100.000
|
$65.000
|
$52.500
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
3.000
|
$16.000
|
$16.000
|
$75.000
|
$20.000
|
$28.350
|
$36.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
|
EA
|
1.000
|
$20.000
|
$16.000
|
$75.000
|
$20.000
|
$31.500
|
$24.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
6.000
|
$70.000
|
$64.000
|
$100.000
|
$70.000
|
$147.000
|
$170.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
1,630.000
|
$1.250
|
$1.537
|
$1.550
|
$1.500
|
$1.580
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
3,258.000
|
$1.250
|
$1.113
|
$1.100
|
$1.500
|
$1.470
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
860.000
|
$1.250
|
$2.120
|
$2.100
|
$4.500
|
$2.730
|
$4.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
6,150.000
|
$1.250
|
$1.113
|
$1.100
|
$1.500
|
$1.260
|
$1.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,312.000
|
$2.000
|
$1.060
|
$1.050
|
$1.500
|
$1.680
|
$1.250
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
348.000
|
$4.000
|
$2.915
|
$2.900
|
$2.500
|
$3.680
|
$2.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
928.000
|
$4.500
|
$2.915
|
$2.900
|
$5.000
|
$6.300
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$195.000
|
$185.500
|
$185.000
|
$280.000
|
$215.250
|
$300.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
3.000
|
$165.000
|
$190.800
|
$190.000
|
$400.000
|
$236.250
|
$430.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$225.000
|
$212.000
|
$210.000
|
$400.000
|
$236.250
|
$420.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
2,010.000
|
$2.500
|
$1.325
|
$1.350
|
$2.500
|
$1.050
|
$2.750
|
|
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
|
LF
|
8,069.000
|
$1.400
|
$1.219
|
$1.250
|
$1.000
|
$1.050
|
$1.000
|
|
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
|
LF
|
2,740.000
|
$1.600
|
$1.590
|
$1.650
|
$1.000
|
$1.050
|
$1.000
|
|
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
|
LF
|
7,606.000
|
$1.400
|
$1.219
|
$1.250
|
$1.000
|
$1.050
|
$1.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
13,550.000
|
$0.300
|
$0.265
|
$0.300
|
$0.250
|
$0.630
|
$0.200
|
|
|
PAVEMENT SLER 8"
|
LF
|
788.000
|
$0.400
|
$0.371
|
$0.400
|
$0.350
|
$4.730
|
$0.400
|
|
|
PAVEMENT SLER 12"
|
LF
|
300.000
|
$0.600
|
$1.060
|
$1.050
|
$1.250
|
$5.780
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
330.000
|
$6.500
|
$6.095
|
$6.100
|
$8.000
|
$5.250
|
$8.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
7,523.000
|
$0.500
|
$0.636
|
$0.650
|
$1.000
|
$1.050
|
$1.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
9,640.000
|
$1.000
|
$0.636
|
$0.650
|
$1.000
|
$1.580
|
$1.000
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
1,138.000
|
$1.200
|
$1.060
|
$1.050
|
$1.750
|
$2.630
|
$1.750
|
|
|
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
|
SF
|
6,700.000
|
$1.700
|
$2.400
|
$1.500
|
$1.500
|
$5.630
|
$2.250
|
|
Totals: |
$5,855,860.770
|
$5,099,674.815
|
$5,195,981.250
|
$6,005,862.950
|
$6,206,565.510
|
$6,737,037.450
|