|
|
PREPARING ROW
|
STA
|
132.000
|
$1,500.000
|
$1,000.000
|
$750.000
|
$2,000.000
|
$1,000.000
|
$5,600.000
|
$6,240.000
|
$965.000
|
$800.000
|
$8,300.000
|
|
|
PREP ROW (TREE REMOVE) (12"-24" DIA)
|
EA
|
53.000
|
$1,500.000
|
$1,500.000
|
$620.000
|
$725.000
|
$700.000
|
$700.000
|
$700.000
|
$1,340.000
|
$950.000
|
$600.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
32.000
|
$43.000
|
$23.000
|
$110.000
|
$21.000
|
$90.000
|
$83.000
|
$40.000
|
$36.000
|
$82.000
|
$45.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
117.000
|
$58.000
|
$18.000
|
$50.000
|
$21.000
|
$40.000
|
$30.520
|
$60.000
|
$36.000
|
$44.000
|
$30.000
|
|
|
REMOVE STAB BASE AND ASPH PAV (6"-20")
|
SY
|
10,479.000
|
$7.000
|
$12.000
|
$20.000
|
$11.000
|
$7.000
|
$14.000
|
$13.000
|
$11.850
|
$13.000
|
$15.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
20,322.000
|
$50.000
|
$16.000
|
$40.000
|
$22.000
|
$21.000
|
$30.000
|
$6.500
|
$25.000
|
$30.000
|
$17.500
|
|
|
EXCAV (CHANNEL)
|
CY
|
255.000
|
$43.000
|
$50.000
|
$50.000
|
$50.000
|
$40.000
|
$73.000
|
$63.000
|
$50.000
|
$165.000
|
$50.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
5,233.000
|
$30.000
|
$10.000
|
$15.000
|
$22.000
|
$17.000
|
$7.400
|
$55.000
|
$40.000
|
$69.000
|
$30.000
|
|
|
BACKFILL (TY A)
|
STA
|
132.000
|
$290.000
|
$150.000
|
$400.000
|
$270.000
|
$310.000
|
$491.360
|
$600.000
|
$300.000
|
$500.000
|
$300.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
57,888.000
|
$2.000
|
$4.000
|
$2.110
|
$3.400
|
$1.500
|
$1.350
|
$2.500
|
$3.000
|
$5.500
|
$6.000
|
|
|
BLOCK SODDING
|
SY
|
1,072.000
|
$4.000
|
$5.000
|
$5.000
|
$7.300
|
$6.500
|
$19.650
|
$15.000
|
$6.000
|
$5.800
|
$6.000
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
57,888.000
|
$5.000
|
$0.300
|
$0.300
|
$0.300
|
$0.220
|
$1.020
|
$0.350
|
$0.210
|
$0.310
|
$0.360
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
4,354.000
|
$9.000
|
$0.250
|
$0.200
|
$0.470
|
$0.220
|
$0.700
|
$0.250
|
$0.200
|
$0.520
|
$0.300
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
4,354.000
|
$9.000
|
$0.270
|
$0.200
|
$0.540
|
$0.220
|
$0.720
|
$0.250
|
$0.200
|
$0.520
|
$0.330
|
|
|
VEGETATIVE WATERING
|
TGL
|
2,064.000
|
$500.000
|
$1.000
|
$20.000
|
$21.000
|
$20.000
|
$0.010
|
$10.000
|
$0.010
|
$67.000
|
$17.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG)
|
SY
|
4,354.000
|
$4.000
|
$1.500
|
$1.500
|
$1.050
|
$2.200
|
$1.500
|
$2.000
|
$2.000
|
$3.200
|
$1.800
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
6,512.000
|
$100.000
|
$84.000
|
$90.000
|
$80.150
|
$82.000
|
$90.000
|
$100.000
|
$100.000
|
$101.000
|
$100.000
|
|
|
LIME (QUICKLIME (SLURRY))
|
TON
|
488.000
|
$305.580
|
$320.000
|
$350.000
|
$350.000
|
$265.000
|
$315.000
|
$350.000
|
$330.000
|
$375.000
|
$345.000
|
|
|
LIME TRT (SUBGRADE) (8")
|
SY
|
29,303.000
|
$5.000
|
$4.500
|
$8.000
|
$5.100
|
$7.500
|
$5.230
|
$8.000
|
$8.000
|
$22.000
|
$8.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
17,581.000
|
$15.000
|
$4.000
|
$3.500
|
$6.250
|
$7.000
|
$5.730
|
$1.000
|
$4.000
|
$7.500
|
$8.750
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
6,740.000
|
$150.000
|
$100.000
|
$110.000
|
$112.000
|
$131.400
|
$116.250
|
$120.000
|
$165.000
|
$130.000
|
$170.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
7,953.000
|
$170.000
|
$130.000
|
$145.000
|
$172.000
|
$175.000
|
$155.160
|
$175.000
|
$220.000
|
$177.000
|
$210.000
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
43,002.000
|
$2.000
|
$1.000
|
$3.000
|
$2.200
|
$3.000
|
$6.000
|
$2.500
|
$4.000
|
$5.000
|
$2.100
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
133.000
|
$264.000
|
$300.000
|
$195.000
|
$400.000
|
$75.000
|
$302.000
|
$305.000
|
$100.000
|
$325.000
|
$108.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
47.000
|
$30.000
|
$1.200
|
$250.000
|
$7.000
|
$26.000
|
$15.000
|
$100.000
|
$1.000
|
$1.000
|
$1.270
|
|
|
TEMPORARY SPL SHORING
|
SF
|
420.000
|
$51.000
|
$70.000
|
$90.000
|
$88.000
|
$70.000
|
$70.000
|
$80.000
|
$40.000
|
$40.000
|
$50.800
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
184.000
|
$355.000
|
$250.000
|
$470.000
|
$275.000
|
$265.000
|
$250.000
|
$266.250
|
$400.000
|
$458.000
|
$595.400
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
21.000
|
$855.000
|
$576.000
|
$800.000
|
$660.000
|
$800.000
|
$769.290
|
$800.000
|
$600.000
|
$892.000
|
$762.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
304.000
|
$230.000
|
$146.000
|
$330.000
|
$150.000
|
$240.000
|
$188.880
|
$250.000
|
$200.000
|
$261.000
|
$254.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
60.000
|
$1,025.000
|
$811.000
|
$1,000.000
|
$1,430.000
|
$2,200.000
|
$1,657.600
|
$1,100.000
|
$1,120.000
|
$1,120.000
|
$1,422.500
|
|
|
CONC BOX CULV (9 FT X 5 FT)
|
LF
|
60.000
|
$1,095.000
|
$811.000
|
$1,000.000
|
$1,650.000
|
$2,400.000
|
$1,715.210
|
$1,100.000
|
$1,206.000
|
$1,206.000
|
$1,531.620
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
131.000
|
$91.000
|
$90.000
|
$60.000
|
$75.000
|
$100.000
|
$109.680
|
$75.000
|
$56.000
|
$56.000
|
$71.120
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,880.000
|
$135.000
|
$85.000
|
$100.000
|
$80.000
|
$110.000
|
$97.050
|
$90.000
|
$74.000
|
$74.000
|
$93.980
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
5.000
|
$300.000
|
$311.000
|
$360.000
|
$320.000
|
$120.000
|
$330.250
|
$750.000
|
$300.000
|
$300.000
|
$381.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
15.000
|
$420.000
|
$234.000
|
$260.000
|
$350.000
|
$270.000
|
$263.470
|
$800.000
|
$400.000
|
$400.000
|
$508.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
4.000
|
$440.000
|
$433.000
|
$1,100.000
|
$700.000
|
$370.000
|
$472.860
|
$1,500.000
|
$1,000.000
|
$1,000.000
|
$1,270.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$11,000.000
|
$8,000.000
|
$11,000.000
|
$9,439.300
|
$12,000.000
|
$7,220.000
|
$7,220.000
|
$9,169.400
|
|
|
INLET (COMPL)(AD)(3FT X 3FT)(FTW)
|
EA
|
1.000
|
$5,000.000
|
$2,800.000
|
$8,000.000
|
$4,650.000
|
$13,000.000
|
$2,869.300
|
$10,000.000
|
$4,900.000
|
$4,900.000
|
$6,223.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$10,000.000
|
$3,100.000
|
$9,000.000
|
$8,800.000
|
$11,000.000
|
$3,122.500
|
$11,000.000
|
$6,000.000
|
$6,000.000
|
$7,620.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
1.000
|
$17,000.000
|
$15,000.000
|
$23,000.000
|
$16,500.000
|
$38,000.000
|
$14,754.580
|
$19,000.000
|
$13,000.000
|
$13,000.000
|
$16,510.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$57,000.000
|
$28,000.000
|
$39,000.000
|
$85,800.000
|
$72,000.000
|
$27,523.000
|
$37,500.000
|
$72,000.000
|
$72,000.000
|
$91,440.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,700.000
|
$675.000
|
$1,900.000
|
$1,900.000
|
$1,600.000
|
$671.800
|
$1,100.000
|
$1,200.000
|
$1,200.000
|
$1,524.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
71.000
|
$2,700.000
|
$1,110.000
|
$1,900.000
|
$2,500.000
|
$2,200.000
|
$1,110.700
|
$1,800.000
|
$1,500.000
|
$1,500.000
|
$1,905.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$4,200.000
|
$1,800.000
|
$4,400.000
|
$3,150.000
|
$2,600.000
|
$1,817.400
|
$2,500.000
|
$1,650.000
|
$1,650.000
|
$2,095.500
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$6,200.000
|
$3,100.000
|
$8,000.000
|
$6,500.000
|
$5,800.000
|
$3,074.000
|
$10,000.000
|
$5,800.000
|
$8,500.000
|
$10,795.000
|
|
|
SET (TY II) (54 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$9,950.000
|
$6,300.000
|
$12,000.000
|
$11,000.000
|
$13,000.000
|
$6,307.700
|
$15,000.000
|
$10,200.000
|
$10,200.000
|
$12,964.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,095.000
|
$1,600.000
|
$2,900.000
|
$960.000
|
$800.000
|
$1,635.000
|
$2,000.000
|
$700.000
|
$700.000
|
$889.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,226.000
|
$1,250.000
|
$3,300.000
|
$1,100.000
|
$1,100.000
|
$1,248.000
|
$5,000.000
|
$1,000.000
|
$1,000.000
|
$1,270.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,495.000
|
$55.000
|
$25.000
|
$44.000
|
$24.000
|
$16.000
|
$25.500
|
$24.000
|
$10.000
|
$10.000
|
$12.700
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
47.000
|
$240.000
|
$202.000
|
$1,500.000
|
$110.000
|
$220.000
|
$202.600
|
$210.000
|
$100.000
|
$100.000
|
$95.250
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,243,550.000
|
$608,000.000
|
$965,000.000
|
$890,000.000
|
$880,000.000
|
$961,055.000
|
$981,000.000
|
$980,000.000
|
$800,000.000
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$12,000.000
|
$74,000.000
|
$10,000.000
|
$8,000.000
|
$20,000.000
|
$11,500.000
|
$21,000.000
|
$18,000.000
|
$20,000.000
|
$24,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
896.000
|
$125.000
|
$1.000
|
$5.000
|
$100.000
|
$90.000
|
$150.000
|
$125.000
|
$40.000
|
$95.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
882.000
|
$222.000
|
$1.000
|
$5.000
|
$150.000
|
$200.000
|
$215.090
|
$75.000
|
$30.000
|
$325.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
96.000
|
$204.000
|
$1.000
|
$100.000
|
$150.000
|
$100.000
|
$1.000
|
$600.000
|
$30.000
|
$715.000
|
$450.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
124.000
|
$36.000
|
$35.000
|
$39.000
|
$38.000
|
$41.000
|
$38.500
|
$53.780
|
$40.000
|
$56.450
|
$46.200
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
124.000
|
$46.000
|
$10.000
|
$10.000
|
$9.900
|
$16.000
|
$10.000
|
$21.300
|
$15.000
|
$22.000
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
888.000
|
$32.000
|
$35.000
|
$10.000
|
$33.250
|
$38.000
|
$35.000
|
$37.280
|
$39.350
|
$54.230
|
$42.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
888.000
|
$20.000
|
$10.000
|
$5.000
|
$9.900
|
$13.000
|
$13.000
|
$13.850
|
$13.460
|
$20.000
|
$15.600
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
23,740.000
|
$1.000
|
$1.000
|
$3.750
|
$4.500
|
$4.000
|
$3.600
|
$3.830
|
$4.000
|
$2.830
|
$4.320
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
23,740.000
|
$1.000
|
$0.500
|
$1.000
|
$1.000
|
$0.900
|
$1.100
|
$1.170
|
$1.000
|
$1.300
|
$1.320
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
210.000
|
$8.000
|
$4.000
|
$12.000
|
$6.500
|
$6.000
|
$4.250
|
$4.530
|
$6.000
|
$8.000
|
$5.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
210.000
|
$6.000
|
$1.000
|
$1.250
|
$1.050
|
$2.000
|
$1.200
|
$1.280
|
$2.000
|
$2.500
|
$1.440
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,974.000
|
$150.000
|
$150.000
|
$90.000
|
$72.000
|
$95.000
|
$125.000
|
$120.000
|
$133.000
|
$185.000
|
$135.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$15,000.000
|
$5,000.000
|
$20,000.000
|
$3,500.000
|
$8,000.000
|
$5,250.000
|
$5,000.000
|
$4,900.000
|
$18,000.000
|
$13,000.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
8,480.000
|
$50.000
|
$42.000
|
$40.000
|
$61.000
|
$36.000
|
$42.000
|
$30.000
|
$42.000
|
$42.000
|
$55.500
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
920.000
|
$50.000
|
$42.000
|
$40.000
|
$71.000
|
$36.000
|
$42.000
|
$95.000
|
$42.000
|
$42.000
|
$52.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
6,740.000
|
$23.000
|
$12.000
|
$10.000
|
$9.200
|
$13.000
|
$12.000
|
$12.000
|
$12.000
|
$12.000
|
$15.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
920.000
|
$27.000
|
$12.000
|
$10.000
|
$9.200
|
$13.000
|
$12.000
|
$24.000
|
$12.000
|
$12.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
8,480.000
|
$70.000
|
$18.000
|
$15.000
|
$11.500
|
$24.000
|
$18.000
|
$15.000
|
$18.000
|
$18.000
|
$22.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
920.000
|
$75.000
|
$18.000
|
$15.000
|
$11.500
|
$24.000
|
$18.000
|
$30.000
|
$18.000
|
$18.000
|
$22.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
121.000
|
$110.000
|
$105.000
|
$180.000
|
$160.000
|
$190.000
|
$184.700
|
$200.000
|
$130.000
|
$150.000
|
$171.600
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,453.000
|
$80.000
|
$48.000
|
$50.000
|
$110.000
|
$100.000
|
$106.300
|
$115.000
|
$93.000
|
$65.000
|
$85.000
|
|
|
TURNOUTS (ACP)
|
SY
|
81.000
|
$120.000
|
$120.000
|
$36.000
|
$175.000
|
$100.000
|
$116.320
|
$200.000
|
$500.000
|
$110.000
|
$85.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
70,834.000
|
$2.000
|
$0.200
|
$0.200
|
$0.220
|
$0.250
|
$0.280
|
$0.170
|
$0.260
|
$0.420
|
$0.350
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
18,970.000
|
$2.000
|
$0.210
|
$0.200
|
$0.220
|
$0.250
|
$0.280
|
$0.170
|
$0.260
|
$0.460
|
$0.350
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
150.000
|
$89.000
|
$5.000
|
$5.000
|
$5.500
|
$15.000
|
$5.000
|
$10.650
|
$25.000
|
$5.000
|
$6.250
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$250.000
|
$260.000
|
$275.000
|
$700.000
|
$250.000
|
$372.750
|
$24.750
|
$250.000
|
$312.500
|
|
|
REMOVE AND INSTALL EXISTING GATE
|
EA
|
1.000
|
$800.000
|
$500.000
|
$2,800.000
|
$3,300.000
|
$2,900.000
|
$2,750.000
|
$2,928.750
|
$1,400.000
|
$5,500.000
|
$2,500.000
|
|
|
WIRE FENCE (TY B)
|
LF
|
75.000
|
$36.000
|
$40.000
|
$42.000
|
$50.000
|
$43.000
|
$41.500
|
$44.200
|
$34.000
|
$50.000
|
$100.000
|
|
|
WIRE FENCE (TY D)
|
LF
|
36.000
|
$50.000
|
$50.000
|
$90.000
|
$105.000
|
$96.000
|
$92.250
|
$98.250
|
$18.000
|
$95.000
|
$100.000
|
|
|
WIRE FENCE (SPECIAL)
|
LF
|
31.000
|
$130.000
|
$50.000
|
$70.000
|
$80.000
|
$72.000
|
$68.750
|
$73.220
|
$45.000
|
$100.000
|
$200.000
|
|
|
WIRE FENCE (REMOVE)
|
LF
|
31.000
|
$23.000
|
$15.000
|
$17.000
|
$18.150
|
$38.000
|
$511.000
|
$17.570
|
$2.870
|
$10.000
|
$18.750
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
19.000
|
$640.000
|
$280.000
|
$290.000
|
$308.000
|
$275.000
|
$280.000
|
$618.330
|
$280.000
|
$280.000
|
$350.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
4.000
|
$580.000
|
$185.000
|
$290.000
|
$313.500
|
$300.000
|
$285.000
|
$890.380
|
$285.000
|
$285.000
|
$356.250
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$753.000
|
$800.000
|
$800.000
|
$880.000
|
$740.000
|
$800.000
|
$1,482.020
|
$800.000
|
$800.000
|
$1,000.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
23.000
|
$7,275.000
|
$4,400.000
|
$5,000.000
|
$4,840.000
|
$4,600.000
|
$4,400.000
|
$4,686.000
|
$4,720.000
|
$5,207.000
|
$6,769.100
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
365.000
|
$50.000
|
$17.000
|
$14.000
|
$18.700
|
$18.000
|
$17.000
|
$18.110
|
$40.950
|
$14.000
|
$18.200
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,375.000
|
$60.000
|
$30.000
|
$31.000
|
$33.000
|
$32.000
|
$30.000
|
$31.950
|
$44.900
|
$29.900
|
$38.870
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
1,740.000
|
$3.000
|
$1.550
|
$1.500
|
$1.710
|
$1.700
|
$1.550
|
$1.650
|
$2.300
|
$1.500
|
$1.950
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
3,480.000
|
$2.000
|
$1.650
|
$1.500
|
$1.820
|
$1.800
|
$1.650
|
$1.760
|
$2.300
|
$1.500
|
$1.950
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
3.000
|
$2,500.000
|
$1,085.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
$1,085.000
|
$1,155.530
|
$3,100.000
|
$1,484.000
|
$1,929.200
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
7.000
|
$12,385.000
|
$6,900.000
|
$12,500.000
|
$7,600.000
|
$7,300.000
|
$6,900.000
|
$7,348.500
|
$17,785.000
|
$10,678.000
|
$13,998.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$1,000.000
|
$650.000
|
$700.000
|
$715.000
|
$950.000
|
$650.000
|
$670.950
|
$1,340.000
|
$650.000
|
$812.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$1,800.000
|
$895.000
|
$900.000
|
$985.000
|
$950.000
|
$895.000
|
$942.530
|
$1,665.000
|
$895.000
|
$1,118.750
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
7.000
|
$600.000
|
$550.000
|
$600.000
|
$605.000
|
$950.000
|
$550.000
|
$644.330
|
$1,645.000
|
$550.000
|
$687.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$500.000
|
$150.000
|
$150.000
|
$165.000
|
$110.000
|
$150.000
|
$105.440
|
$370.000
|
$150.000
|
$187.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
10.000
|
$200.000
|
$65.000
|
$70.000
|
$71.500
|
$80.000
|
$65.000
|
$58.580
|
$65.000
|
$65.000
|
$81.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
24,810.000
|
$3.000
|
$0.250
|
$0.400
|
$0.320
|
$0.300
|
$0.360
|
$0.270
|
$0.360
|
$0.360
|
$0.362
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
64.000
|
$40.000
|
$5.000
|
$7.000
|
$6.600
|
$6.300
|
$6.700
|
$3.200
|
$6.700
|
$6.700
|
$7.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
26,658.000
|
$5.000
|
$0.250
|
$0.400
|
$0.320
|
$0.300
|
$0.360
|
$0.270
|
$0.360
|
$0.360
|
$0.362
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
26,290.000
|
$1.000
|
$0.890
|
$0.800
|
$0.780
|
$0.750
|
$0.780
|
$1.030
|
$0.780
|
$0.780
|
$0.887
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
116.000
|
$10.000
|
$4.760
|
$7.000
|
$13.200
|
$12.600
|
$6.650
|
$6.120
|
$6.650
|
$6.650
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
28,112.000
|
$1.000
|
$0.890
|
$0.800
|
$0.780
|
$0.750
|
$0.780
|
$1.030
|
$0.780
|
$0.780
|
$0.887
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
10,140.000
|
$2.000
|
$0.860
|
$0.900
|
$0.860
|
$0.820
|
$0.890
|
$1.010
|
$0.890
|
$0.890
|
$0.975
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
127.000
|
$8.000
|
$6.000
|
$5.000
|
$13.200
|
$12.500
|
$5.050
|
$5.330
|
$5.050
|
$5.050
|
$15.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
647.000
|
$12.000
|
$6.750
|
$7.000
|
$13.200
|
$12.500
|
$6.700
|
$7.300
|
$6.700
|
$6.700
|
$15.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
42.000
|
$134.000
|
$150.000
|
$130.000
|
$170.500
|
$165.000
|
$131.000
|
$186.380
|
$131.000
|
$131.000
|
$193.750
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
42.000
|
$40.000
|
$150.000
|
$160.000
|
$269.500
|
$260.000
|
$158.000
|
$207.680
|
$158.000
|
$158.000
|
$306.250
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
1,817.000
|
$4.000
|
$3.000
|
$3.750
|
$4.950
|
$4.800
|
$3.750
|
$4.530
|
$3.750
|
$3.750
|
$5.625
|
|
|
PAVEMENT SLER 6"
|
LF
|
160,482.000
|
$1.000
|
$0.130
|
$0.180
|
$0.250
|
$0.230
|
$0.180
|
$0.180
|
$0.180
|
$0.180
|
$0.275
|
|
|
PAVEMENT SLER 12"
|
LF
|
1,692.000
|
$2.000
|
$0.200
|
$0.800
|
$1.930
|
$1.800
|
$0.780
|
$0.240
|
$0.780
|
$0.780
|
$2.187
|
|
|
PAVEMENT SLER 24"
|
LF
|
251.000
|
$2.000
|
$1.000
|
$1.500
|
$3.580
|
$3.400
|
$1.400
|
$0.640
|
$1.400
|
$1.400
|
$4.062
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
13.000
|
$35.000
|
$16.000
|
$27.000
|
$77.000
|
$74.000
|
$26.000
|
$42.600
|
$26.000
|
$26.000
|
$87.500
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
9.000
|
$45.000
|
$16.000
|
$33.000
|
$82.500
|
$79.000
|
$32.000
|
$53.250
|
$32.000
|
$32.000
|
$93.750
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
78,395.000
|
$1.000
|
$0.520
|
$0.600
|
$0.560
|
$0.540
|
$0.580
|
$0.610
|
$0.580
|
$0.580
|
$0.637
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
13,095.000
|
$2.000
|
$0.530
|
$0.700
|
$0.590
|
$0.570
|
$0.660
|
$0.670
|
$0.660
|
$0.660
|
$0.675
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
83,341.000
|
$3.000
|
$0.520
|
$0.600
|
$0.560
|
$0.540
|
$0.580
|
$0.610
|
$0.580
|
$0.580
|
$0.637
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,681.000
|
$6.000
|
$3.900
|
$4.250
|
$5.500
|
$5.250
|
$4.150
|
$4.260
|
$4.150
|
$4.150
|
$6.250
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
157,342.000
|
$1.000
|
$0.470
|
$0.500
|
$0.210
|
$0.200
|
$0.440
|
$0.530
|
$0.440
|
$0.440
|
$0.237
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
3,140.000
|
$2.000
|
$0.600
|
$0.400
|
$0.220
|
$0.210
|
$0.350
|
$0.530
|
$0.350
|
$0.350
|
$0.250
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
1,692.000
|
$2.000
|
$1.890
|
$1.750
|
$2.200
|
$2.100
|
$1.650
|
$1.330
|
$1.650
|
$1.650
|
$2.500
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
251.000
|
$7.000
|
$2.500
|
$2.750
|
$4.130
|
$3.900
|
$2.750
|
$3.200
|
$2.750
|
$2.750
|
$4.687
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
13.000
|
$142.000
|
$55.000
|
$40.000
|
$77.000
|
$70.000
|
$39.000
|
$37.280
|
$39.000
|
$39.000
|
$87.500
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
9.000
|
$142.000
|
$55.000
|
$47.000
|
$77.000
|
$70.000
|
$46.000
|
$47.930
|
$46.000
|
$46.000
|
$87.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
160,482.000
|
$1.000
|
$0.170
|
$0.020
|
$0.010
|
$0.010
|
$0.020
|
$0.140
|
$0.020
|
$0.020
|
$0.012
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,692.000
|
$6.000
|
$0.450
|
$0.400
|
$0.060
|
$0.050
|
$0.410
|
$0.530
|
$0.410
|
$0.410
|
$0.055
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
251.000
|
$16.000
|
$0.550
|
$0.500
|
$0.060
|
$0.050
|
$0.490
|
$1.070
|
$0.490
|
$0.490
|
$0.055
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
13.000
|
$245.000
|
$10.000
|
$12.000
|
$1.100
|
$1.000
|
$11.750
|
$31.950
|
$11.750
|
$11.750
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
9.000
|
$486.000
|
$10.000
|
$14.000
|
$1.100
|
$1.000
|
$13.750
|
$42.600
|
$13.750
|
$13.750
|
$1.250
|
|
|
UNDERSEAL COURSE
|
GAL
|
13,831.000
|
$5.000
|
$4.000
|
$3.250
|
$0.010
|
$4.000
|
$4.380
|
$0.010
|
$4.000
|
$7.000
|
$7.000
|
|
|
REMOVE AND REPLACE WOOD FENCE
|
LF
|
239.000
|
$110.000
|
$50.000
|
$39.000
|
$120.000
|
$26.000
|
$60.000
|
$80.000
|
$50.000
|
$55.000
|
$25.000
|
|
Totals: |
$13,679,045.040
|
$8,486,108.010
|
$8,701,080.180
|
$8,936,757.200
|
$9,172,554.090
|
$9,632,104.370
|
$9,849,891.610
|
$9,977,577.280
|
$10,802,514.430
|
$11,991,782.838
|