PREPARING ROW
|
STA
|
11.000
|
$10,000.000
|
$1,000.000
|
$3,500.000
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
1,083.000
|
$10.000
|
$6.500
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,707.000
|
$10.000
|
$20.000
|
$8.800
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
3,393.000
|
$26.000
|
$20.000
|
$19.000
|
|
|
BACKFILL (TY A)
|
STA
|
18.000
|
$200.000
|
$175.000
|
$700.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
2,769.000
|
$1.000
|
$1.500
|
$5.000
|
|
|
STRAW/HAY MLCH SEED(TEMP)(COOL)
|
SY
|
2,769.000
|
$1.000
|
$1.500
|
$0.050
|
|
|
VEGETATIVE WATERING
|
MG
|
97.000
|
$35.000
|
$30.000
|
$45.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
465.000
|
$5.000
|
$10.000
|
$5.500
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
3,690.000
|
$5.000
|
$6.000
|
$6.500
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
84.000
|
$100.000
|
$150.000
|
$250.000
|
|
|
D-GR HMA(SQ) TY-B SAC-B PG64-22
|
TON
|
1,203.000
|
$125.000
|
$94.000
|
$90.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(11")
|
SY
|
640.000
|
$120.000
|
$80.000
|
$84.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$83,153.750
|
$70,000.000
|
$70,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
2.000
|
$10,000.000
|
$12,000.000
|
$10,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$3.000
|
$5.000
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$1.250
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
200.000
|
$4.000
|
$9.000
|
$2.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$1.000
|
$3.000
|
$1.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$550.000
|
$1,250.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$650.000
|
$1,250.000
|
$900.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$600.000
|
$1,250.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$100.000
|
$100.000
|
$120.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
3,476.000
|
$0.500
|
$0.330
|
$0.380
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,105.000
|
$0.500
|
$0.660
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
6,048.000
|
$0.500
|
$0.330
|
$0.380
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,000.000
|
$1.000
|
$0.660
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,000.000
|
$1.000
|
$0.660
|
$0.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
58.000
|
$1.000
|
$1.500
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
620.000
|
$2.000
|
$1.500
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
265.000
|
$2.000
|
$1.650
|
$1.900
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,105.000
|
$2.000
|
$0.940
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
13.000
|
$8.000
|
$8.800
|
$10.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
7.000
|
$200.000
|
$140.000
|
$160.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$250.000
|
$160.000
|
$180.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
640.000
|
$5.000
|
$4.400
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,476.000
|
$1.000
|
$0.550
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,048.000
|
$1.000
|
$0.550
|
$0.650
|
|
REFL PAV MRKR TY I-C
|
EA
|
58.000
|
$5.000
|
$5.500
|
$6.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
310.000
|
$5.000
|
$5.500
|
$6.300
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
4.000
|
$800.000
|
$600.000
|
$700.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
12.000
|
$1,000.000
|
$700.000
|
$1,300.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
3.000
|
$1,000.000
|
$850.000
|
$2,500.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
3.000
|
$1,500.000
|
$1,000.000
|
$3,800.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
1,066.000
|
$50.000
|
$5.000
|
$5.990
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
1,328.000
|
$120.000
|
$130.000
|
$125.000
|
|
|
TACK COAT
|
GAL
|
1,732.000
|
$3.000
|
$0.010
|
$2.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
90.000
|
$90.000
|
$100.000
|
$90.000
|
|
|
TMA (STATIONARY)
|
DAY
|
76.000
|
$160.000
|
$200.000
|
$75.000
|
|
Totals: |
$914,691.250
|
$714,693.590
|
$736,274.760
|