|
|
REMOV CONC (PAV)
|
SY
|
634.000
|
$11.400
|
$35.000
|
$23.500
|
$40.000
|
$46.250
|
$40.000
|
$37.700
|
$51.120
|
$19.000
|
|
|
REMOV CONC (MEDIANS)
|
SY
|
303.000
|
$95.000
|
$45.000
|
$23.500
|
$40.000
|
$48.750
|
$40.000
|
$37.880
|
$74.460
|
$19.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
358.000
|
$28.500
|
$40.000
|
$20.000
|
$45.000
|
$45.000
|
$40.000
|
$40.080
|
$32.050
|
$17.000
|
|
|
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
|
SY
|
7,981.000
|
$5.700
|
$9.000
|
$11.000
|
$14.200
|
$13.750
|
$10.000
|
$13.140
|
$22.720
|
$12.000
|
|
|
RMV (6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,078.000
|
$19.000
|
$12.000
|
$9.000
|
$14.200
|
$13.500
|
$10.000
|
$11.310
|
$16.780
|
$10.000
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
10.000
|
$2,375.000
|
$1,500.000
|
$2,700.000
|
$4,500.000
|
$1,940.000
|
$2,500.000
|
$2,502.870
|
$8,420.130
|
$1,175.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
5,000.000
|
$60.000
|
$38.000
|
$21.000
|
$15.000
|
$40.000
|
$20.000
|
$21.960
|
$37.520
|
$38.000
|
|
|
SUBGR WIDEN (DC)
|
STA
|
328.340
|
$712.500
|
$700.000
|
$530.000
|
$600.000
|
$1,125.000
|
$2,500.000
|
$995.550
|
$1,160.990
|
$1,417.000
|
|
|
BACKFILL (TY B)
|
STA
|
1,021.600
|
$142.500
|
$145.000
|
$115.000
|
$400.000
|
$109.000
|
$250.000
|
$154.310
|
$100.000
|
$40.000
|
|
|
BLADING
|
STA
|
1,031.600
|
$114.000
|
$110.000
|
$105.000
|
$300.000
|
$104.000
|
$130.000
|
$138.930
|
$100.000
|
$102.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
6,643.400
|
$6.180
|
$5.000
|
$4.900
|
$5.000
|
$7.200
|
$12.500
|
$7.830
|
$8.170
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
210,469.930
|
$3.500
|
$4.800
|
$2.650
|
$3.750
|
$2.250
|
$3.750
|
$3.710
|
$2.470
|
$3.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
6,172.000
|
$5.700
|
$5.500
|
$3.650
|
$4.000
|
$3.400
|
$4.250
|
$4.660
|
$2.990
|
$8.000
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
11,087.970
|
$130.000
|
$176.000
|
$165.000
|
$160.000
|
$163.750
|
$155.500
|
$223.150
|
$183.270
|
$188.000
|
|
|
D-GR HMA TY-C SAC-B PG70-28
|
TON
|
7,490.530
|
$159.000
|
$166.000
|
$165.000
|
$162.000
|
$155.000
|
$180.500
|
$210.130
|
$166.240
|
$206.000
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
20,218.960
|
$140.000
|
$170.000
|
$145.000
|
$160.000
|
$150.000
|
$205.500
|
$199.900
|
$179.430
|
$202.000
|
|
|
TACK COAT
|
GAL
|
74,772.420
|
$5.300
|
$4.500
|
$3.350
|
$4.500
|
$3.600
|
$6.000
|
$4.830
|
$4.220
|
$4.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
40,887.880
|
$170.000
|
$189.000
|
$185.000
|
$150.000
|
$195.000
|
$180.500
|
$244.760
|
$227.460
|
$203.000
|
|
|
TACK COAT
|
GAL
|
19,732.370
|
$6.180
|
$4.500
|
$3.500
|
$4.500
|
$3.850
|
$6.000
|
$5.330
|
$4.410
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
|
SY
|
2,724.260
|
$28.500
|
$28.000
|
$40.000
|
$27.000
|
$40.750
|
$60.000
|
$27.410
|
$30.160
|
$64.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
8,172.750
|
$76.000
|
$76.000
|
$60.000
|
$60.000
|
$60.500
|
$70.000
|
$73.440
|
$82.370
|
$192.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
424,818.250
|
$2.000
|
$1.250
|
$2.050
|
$1.400
|
$1.850
|
$2.000
|
$2.340
|
$1.660
|
$2.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
160.000
|
$380.000
|
$360.000
|
$360.000
|
$380.000
|
$361.000
|
$300.000
|
$386.400
|
$442.630
|
$350.000
|
|
|
RIPRAP (CONC)(CL A)
|
CY
|
162.580
|
$950.000
|
$640.000
|
$730.000
|
$660.000
|
$837.000
|
$700.000
|
$896.000
|
$972.110
|
$730.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
4,231.960
|
$500.000
|
$580.000
|
$460.000
|
$610.000
|
$575.000
|
$440.000
|
$616.000
|
$564.510
|
$558.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
18.000
|
$788.500
|
$950.000
|
$940.000
|
$1,740.000
|
$1,750.000
|
$1,000.000
|
$952.000
|
$1,627.730
|
$952.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
6.000
|
$888.250
|
$1,300.000
|
$1,300.000
|
$1,860.000
|
$1,780.000
|
$1,275.000
|
$1,008.000
|
$1,669.820
|
$1,080.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
5.500
|
$441.750
|
$1,450.000
|
$1,400.000
|
$1,900.000
|
$1,925.000
|
$1,500.000
|
$1,008.000
|
$1,756.080
|
$1,085.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
15.000
|
$745.750
|
$1,400.000
|
$1,400.000
|
$2,150.000
|
$2,130.000
|
$1,500.000
|
$1,064.000
|
$1,835.100
|
$1,220.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
5.500
|
$1,282.500
|
$1,500.000
|
$1,500.000
|
$2,200.000
|
$2,000.000
|
$1,450.000
|
$1,176.000
|
$2,105.600
|
$1,370.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
16.000
|
$142.500
|
$170.000
|
$165.000
|
$205.000
|
$210.000
|
$200.000
|
$168.000
|
$227.390
|
$153.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 2 FT)(6:1)(C)
|
EA
|
7.000
|
$1,900.000
|
$19,000.000
|
$18,500.000
|
$23,150.000
|
$17,100.000
|
$18,000.000
|
$8,960.000
|
$25,802.780
|
$19,185.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
1.000
|
$10,188.750
|
$29,000.000
|
$29,500.000
|
$23,250.000
|
$16,300.000
|
$30,000.000
|
$10,080.000
|
$26,465.140
|
$19,285.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
1.000
|
$9,500.000
|
$24,000.000
|
$24,000.000
|
$32,600.000
|
$19,000.000
|
$25,000.000
|
$13,440.000
|
$39,330.760
|
$27,915.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1)(C)
|
EA
|
1.000
|
$3,800.000
|
$15,000.000
|
$15,000.000
|
$16,650.000
|
$14,800.000
|
$15,000.000
|
$11,200.000
|
$19,463.310
|
$13,195.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1)(C)
|
EA
|
4.000
|
$12,350.000
|
$13,000.000
|
$12,500.000
|
$14,720.000
|
$16,500.000
|
$12,000.000
|
$10,640.000
|
$17,202.070
|
$11,420.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
1.000
|
$13,300.000
|
$24,000.000
|
$23,500.000
|
$24,570.000
|
$16,700.000
|
$24,000.000
|
$13,440.000
|
$28,004.710
|
$20,505.010
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,375.000
|
$2,200.000
|
$2,100.000
|
$5,460.000
|
$4,500.000
|
$2,500.000
|
$2,240.000
|
$5,534.720
|
$3,567.250
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
26.000
|
$2,850.000
|
$3,700.000
|
$3,700.000
|
$4,400.000
|
$2,050.000
|
$3,650.000
|
$2,240.000
|
$5,131.890
|
$4,055.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,852,000.000
|
$1,900,000.000
|
$2,900,000.000
|
$2,550,000.000
|
$3,100,000.000
|
$3,400,000.000
|
$1,798,754.950
|
$4,093,988.070
|
$3,750,600.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
29.000
|
$11,400.000
|
$11,950.000
|
$15,000.000
|
$34,000.000
|
$35,000.000
|
$70,000.000
|
$18,356.200
|
$35,000.000
|
$103,246.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,000.000
|
$104.500
|
$25.000
|
$105.000
|
$50.000
|
$76.000
|
$40.000
|
$88.380
|
$81.590
|
$94.000
|
|
|
TMA (STATIONARY)
|
DAY
|
1,250.000
|
$199.500
|
$95.000
|
$260.000
|
$300.000
|
$310.000
|
$180.000
|
$592.290
|
$552.000
|
$100.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
165.000
|
$247.000
|
$95.000
|
$940.000
|
$900.000
|
$105.000
|
$500.000
|
$1,188.130
|
$1,032.770
|
$100.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
231.000
|
$57.000
|
$35.000
|
$52.500
|
$31.000
|
$50.000
|
$50.000
|
$56.000
|
$64.150
|
$51.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
231.000
|
$9.500
|
$5.000
|
$15.500
|
$8.000
|
$15.000
|
$15.000
|
$16.800
|
$19.240
|
$16.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
600.000
|
$9.500
|
$18.000
|
$21.000
|
$20.000
|
$13.000
|
$20.000
|
$22.400
|
$25.660
|
$21.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
6,680.000
|
$11.400
|
$8.000
|
$8.350
|
$7.000
|
$8.000
|
$8.000
|
$8.960
|
$10.260
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,340.000
|
$2.850
|
$1.500
|
$1.550
|
$3.500
|
$6.000
|
$1.500
|
$1.680
|
$1.920
|
$2.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
6,061.000
|
$57.000
|
$100.000
|
$125.000
|
$120.000
|
$72.000
|
$100.000
|
$121.900
|
$123.530
|
$132.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
358.000
|
$109.250
|
$280.000
|
$150.000
|
$250.000
|
$100.000
|
$145.000
|
$140.000
|
$274.340
|
$345.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,192.000
|
$76.000
|
$48.000
|
$66.500
|
$122.000
|
$26.000
|
$60.000
|
$161.480
|
$52.050
|
$66.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
154,300.000
|
$0.240
|
$0.250
|
$0.080
|
$0.220
|
$0.350
|
$0.170
|
$0.300
|
$0.120
|
$0.100
|
|
|
CABLE BARRIER SYS(INSTL)(TL-4)(20 '-0")
|
LF
|
89,320.000
|
$14.750
|
$15.000
|
$16.500
|
$17.700
|
$15.200
|
$16.000
|
$16.240
|
$20.530
|
$15.000
|
|
|
CABLE BARRIER TERM SEC (INSTL)(TL-4)
|
EA
|
76.000
|
$2,850.000
|
$3,600.000
|
$4,700.000
|
$4,990.000
|
$3,600.000
|
$4,500.000
|
$3,864.000
|
$5,773.380
|
$3,495.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$351.500
|
$230.000
|
$230.000
|
$240.000
|
$525.000
|
$220.000
|
$246.400
|
$282.250
|
$223.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$760.000
|
$580.000
|
$575.000
|
$600.000
|
$890.000
|
$550.000
|
$616.000
|
$705.640
|
$558.000
|
|
|
IN RD IL (TY SA) 40T-12-12(250W EQ)LED
|
EA
|
20.000
|
$8,550.000
|
$6,500.000
|
$6,400.000
|
$6,740.000
|
$6,400.000
|
$8,000.000
|
$6,860.000
|
$7,858.210
|
$6,204.000
|
|
|
CONDT (HDPE) (2")
|
LF
|
3,520.000
|
$14.250
|
$15.000
|
$15.000
|
$16.000
|
$15.200
|
$12.000
|
$16.240
|
$18.600
|
$15.000
|
|
|
CONDT (HDPE) (2") BORE
|
LF
|
520.000
|
$33.250
|
$32.000
|
$31.500
|
$33.000
|
$31.350
|
$18.000
|
$33.600
|
$38.490
|
$31.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
4,040.000
|
$2.610
|
$3.000
|
$2.750
|
$2.900
|
$2.800
|
$3.000
|
$2.970
|
$3.400
|
$2.700
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
8,080.000
|
$2.990
|
$3.200
|
$3.150
|
$3.300
|
$3.150
|
$3.500
|
$3.360
|
$3.850
|
$3.050
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$1,900.000
|
$1,300.000
|
$1,300.000
|
$1,375.000
|
$1,310.000
|
$1,500.000
|
$1,400.000
|
$1,603.720
|
$1,266.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$9,500.000
|
$9,000.000
|
$9,000.000
|
$9,460.000
|
$9,000.000
|
$8,500.000
|
$9,632.000
|
$11,033.570
|
$8,710.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
96.000
|
$33.250
|
$32.000
|
$31.500
|
$33.000
|
$37.000
|
$30.000
|
$33.600
|
$38.490
|
$31.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
69.000
|
$760.000
|
$750.000
|
$750.000
|
$780.000
|
$940.000
|
$750.000
|
$800.800
|
$917.330
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
26.000
|
$522.500
|
$920.000
|
$910.000
|
$957.000
|
$1,090.000
|
$900.000
|
$974.400
|
$1,116.190
|
$882.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
54.000
|
$855.000
|
$810.000
|
$805.000
|
$847.000
|
$1,000.000
|
$800.000
|
$862.400
|
$987.890
|
$780.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,045.000
|
$1,000.000
|
$995.000
|
$1,045.000
|
$1,200.000
|
$950.000
|
$1,064.000
|
$1,218.820
|
$963.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
28.000
|
$1,140.000
|
$1,200.000
|
$1,200.000
|
$1,210.000
|
$1,400.000
|
$1,100.000
|
$1,232.000
|
$1,411.270
|
$1,115.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$997.500
|
$900.000
|
$890.000
|
$935.000
|
$1,230.000
|
$850.000
|
$952.000
|
$1,090.530
|
$861.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,140.000
|
$1,100.000
|
$1,000.000
|
$1,090.000
|
$1,465.000
|
$1,000.000
|
$1,108.800
|
$1,270.140
|
$1,003.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
5.000
|
$1,235.000
|
$1,100.000
|
$1,000.000
|
$1,090.000
|
$1,700.000
|
$1,000.000
|
$1,108.800
|
$1,270.140
|
$1,003.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
2.000
|
$1,235.000
|
$1,100.000
|
$1,000.000
|
$1,090.000
|
$1,600.000
|
$1,000.000
|
$1,108.800
|
$1,270.140
|
$1,003.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
24.000
|
$522.500
|
$720.000
|
$715.000
|
$754.000
|
$835.000
|
$700.000
|
$767.200
|
$878.840
|
$694.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
203.000
|
$95.000
|
$110.000
|
$105.000
|
$110.000
|
$105.000
|
$100.000
|
$112.000
|
$128.300
|
$102.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
548.600
|
$6.180
|
$8.000
|
$7.850
|
$8.500
|
$10.000
|
$13.000
|
$8.400
|
$9.620
|
$8.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$760.000
|
$1,300.000
|
$1,300.000
|
$1,320.000
|
$1,570.000
|
$1,100.000
|
$1,344.000
|
$1,539.570
|
$1,216.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
76.000
|
$142.500
|
$95.000
|
$94.000
|
$100.000
|
$157.000
|
$100.000
|
$100.800
|
$115.470
|
$92.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
60.000
|
$142.500
|
$95.000
|
$94.000
|
$100.000
|
$157.000
|
$100.000
|
$100.800
|
$115.470
|
$92.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
148.000
|
$23.750
|
$16.000
|
$15.500
|
$16.500
|
$16.000
|
$15.000
|
$16.800
|
$19.240
|
$16.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
25,540.000
|
$0.480
|
$0.310
|
$0.310
|
$0.330
|
$0.310
|
$0.300
|
$0.340
|
$0.310
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
217,255.000
|
$0.480
|
$0.310
|
$0.300
|
$0.320
|
$0.300
|
$0.290
|
$0.320
|
$0.270
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
29,020.000
|
$0.950
|
$0.360
|
$0.370
|
$0.380
|
$0.370
|
$0.350
|
$0.390
|
$0.460
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
217,255.000
|
$0.480
|
$0.310
|
$0.300
|
$0.320
|
$0.300
|
$0.290
|
$0.320
|
$0.270
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-A
|
EA
|
6,252.000
|
$4.750
|
$4.500
|
$4.500
|
$4.700
|
$4.500
|
$4.300
|
$4.820
|
$6.410
|
$4.350
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
6,204.000
|
$4.750
|
$4.500
|
$4.500
|
$4.700
|
$4.500
|
$4.300
|
$4.820
|
$6.410
|
$4.350
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
18,557.000
|
$9.500
|
$4.000
|
$3.900
|
$4.100
|
$3.950
|
$3.750
|
$4.200
|
$5.770
|
$3.800
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
18,696.000
|
$9.500
|
$4.000
|
$3.900
|
$4.100
|
$3.950
|
$3.750
|
$4.200
|
$5.770
|
$3.800
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
9,113.000
|
$1.660
|
$1.250
|
$1.550
|
$1.250
|
$1.500
|
$1.250
|
$2.260
|
$2.570
|
$1.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
320.000
|
$1.430
|
$1.250
|
$1.550
|
$1.200
|
$1.550
|
$1.250
|
$2.440
|
$2.570
|
$1.550
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
1,702.000
|
$0.950
|
$1.100
|
$1.050
|
$1.100
|
$1.050
|
$1.000
|
$1.120
|
$2.180
|
$1.050
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
28,140.000
|
$1.140
|
$1.000
|
$0.940
|
$1.000
|
$0.940
|
$0.900
|
$1.010
|
$1.800
|
$0.950
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
25,560.000
|
$0.670
|
$0.750
|
$0.730
|
$0.770
|
$0.730
|
$0.700
|
$0.780
|
$0.980
|
$0.750
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
104,980.000
|
$0.480
|
$0.700
|
$0.680
|
$0.720
|
$0.680
|
$0.650
|
$0.730
|
$0.950
|
$0.700
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
525.000
|
$19.000
|
$18.000
|
$18.000
|
$17.700
|
$17.800
|
$17.500
|
$19.060
|
$15.400
|
$17.250
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
88.000
|
$237.500
|
$240.000
|
$235.000
|
$250.000
|
$235.000
|
$225.000
|
$252.000
|
$224.520
|
$228.000
|
|
PREFAB PM TY C (W)(36")(YLD TRI)
|
EA
|
210.000
|
$33.250
|
$60.000
|
$59.000
|
$62.000
|
$59.000
|
$56.500
|
$63.280
|
$60.940
|
$58.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
398.000
|
$3.800
|
$5.300
|
$5.250
|
$5.500
|
$5.250
|
$5.000
|
$5.600
|
$6.410
|
$5.100
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,787.000
|
$4.750
|
$4.500
|
$4.200
|
$4.400
|
$4.200
|
$4.000
|
$4.480
|
$6.410
|
$4.050
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
538,760.000
|
$0.600
|
$0.300
|
$0.680
|
$0.700
|
$0.700
|
$0.650
|
$0.730
|
$0.730
|
$0.700
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
27,240.000
|
$1.430
|
$0.900
|
$0.890
|
$0.930
|
$0.900
|
$0.850
|
$0.950
|
$0.730
|
$0.900
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
525.000
|
$11.400
|
$2.200
|
$2.100
|
$2.200
|
$2.100
|
$2.000
|
$2.240
|
$1.150
|
$2.050
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
88.000
|
$142.500
|
$32.000
|
$31.500
|
$33.000
|
$31.350
|
$30.000
|
$33.600
|
$44.900
|
$30.400
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
210.000
|
$23.750
|
$5.500
|
$5.250
|
$5.500
|
$5.250
|
$5.000
|
$5.600
|
$25.660
|
$5.100
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$5,700.000
|
$5,000.000
|
$5,100.000
|
$4,600.000
|
$30,000.000
|
$16,000.000
|
$15,000.000
|
$8,420.580
|
$5,065.000
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$2,850.000
|
$7,500.000
|
$4,300.000
|
$2,815.000
|
$20,000.000
|
$4,525.000
|
$15,000.000
|
$15,914.600
|
$3,925.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
323,897.020
|
$6.800
|
$6.500
|
$6.800
|
$6.900
|
$6.500
|
$7.000
|
$7.130
|
$8.120
|
$7.000
|
|
|
ASPH FOR REINF FAB (PG76-28)
|
GAL
|
48,584.550
|
$4.750
|
$5.000
|
$3.500
|
$5.000
|
$3.850
|
$6.000
|
$5.810
|
$5.370
|
$6.000
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
2.000
|
$12,825.000
|
$12,000.000
|
$8,900.000
|
$16,500.000
|
$31,265.000
|
$20,000.000
|
$13,200.240
|
$22,963.590
|
$20,560.000
|
|
Totals: |
$28,903,376.271
|
$29,652,484.762
|
$29,920,088.710
|
$30,719,987.760
|
$31,366,141.686
|
$34,221,486.538
|
$35,975,099.101
|
$37,257,715.978
|
$37,506,456.000
|