|
|
PREPARING ROW
|
STA
|
21.000
|
$2,000.000
|
$850.000
|
$580.000
|
$10,000.000
|
$8,000.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
385.000
|
$6.000
|
$15.000
|
$7.750
|
$5.500
|
$17.000
|
|
|
RMV TRT & UNTRT BS & APSH PV (10"-12")
|
STA
|
10.800
|
$2,500.000
|
$4,000.000
|
$2,300.000
|
$4,400.000
|
$6,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
24,487.000
|
$10.000
|
$5.600
|
$10.500
|
$14.950
|
$18.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
7,169.000
|
$12.000
|
$6.000
|
$24.000
|
$19.750
|
$12.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
9.450
|
$400.000
|
$500.000
|
$450.000
|
$445.000
|
$420.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(4")
|
SY
|
12,623.890
|
$10.000
|
$18.000
|
$12.500
|
$10.950
|
$15.000
|
|
|
REWORK BS MTL (TY B)(18")(DENS CONT)
|
STA
|
37.500
|
$1,800.000
|
$3,600.000
|
$7,300.000
|
$3,510.000
|
$2,000.000
|
|
|
REWORK BS MTL (TY B)(10''-12'')(DC)
|
STA
|
36.860
|
$1,200.000
|
$3,600.000
|
$4,900.000
|
$3,675.000
|
$1,500.000
|
|
|
CEMENT
|
TON
|
257.980
|
$150.000
|
$175.000
|
$215.000
|
$176.650
|
$200.000
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(8")
|
SY
|
13,158.000
|
$3.000
|
$6.500
|
$4.100
|
$3.100
|
$5.000
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(6")
|
SY
|
13,031.110
|
$2.500
|
$4.000
|
$2.700
|
$3.150
|
$5.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
5,155.000
|
$5.000
|
$4.000
|
$5.200
|
$3.950
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
5,943.000
|
$5.000
|
$5.000
|
$3.400
|
$3.950
|
$4.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
4,863.000
|
$5.000
|
$5.000
|
$3.500
|
$4.250
|
$4.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
28,474.000
|
$4.000
|
$3.500
|
$3.900
|
$3.650
|
$4.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
152.000
|
$130.000
|
$165.000
|
$195.000
|
$157.000
|
$275.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
521.000
|
$130.000
|
$165.000
|
$115.000
|
$182.000
|
$200.000
|
|
|
D-GR HMA(SQ) TY-C SAC-A PG70-28
|
TON
|
1,475.800
|
$150.000
|
$125.000
|
$135.000
|
$125.400
|
$160.000
|
|
|
D-GR HMA(SQ) TY-B PG70-28
|
TON
|
2,951.590
|
$150.000
|
$125.000
|
$130.000
|
$124.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
3,593.000
|
$3.000
|
$7.000
|
$2.950
|
$4.100
|
$5.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
10,646.670
|
$4.000
|
$3.500
|
$2.700
|
$4.800
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
24.400
|
$300.000
|
$250.000
|
$335.000
|
$315.000
|
$315.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
550.000
|
$200.000
|
$300.000
|
$335.000
|
$285.000
|
$315.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
7.600
|
$600.000
|
$2,500.000
|
$730.000
|
$920.000
|
$680.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
258.000
|
$400.000
|
$750.000
|
$675.000
|
$645.000
|
$630.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
128.000
|
$150.000
|
$175.000
|
$170.000
|
$158.000
|
$160.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
2.000
|
$10,000.000
|
$26,000.000
|
$10,500.000
|
$12,000.000
|
$9,870.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$3,000.000
|
$1,300.000
|
$2,800.000
|
$1,260.000
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$500.000
|
$3,000.000
|
$335.000
|
$4,600.000
|
$315.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$248,000.000
|
$290,000.000
|
$300,000.000
|
$364,500.000
|
$350,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$8,000.000
|
$7,000.000
|
$11,000.000
|
$15,000.000
|
$18,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
111.110
|
$35.000
|
$25.000
|
$55.500
|
$46.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
111.110
|
$10.000
|
$22.000
|
$39.500
|
$5.850
|
$5.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
260.000
|
$10.000
|
$25.000
|
$20.500
|
$22.000
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
810.000
|
$10.000
|
$14.000
|
$11.000
|
$9.000
|
$6.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,560.000
|
$50.000
|
$90.000
|
$38.500
|
$75.500
|
$45.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,560.000
|
$20.000
|
$15.000
|
$8.000
|
$15.400
|
$10.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
396.000
|
$30.000
|
$70.000
|
$38.500
|
$27.350
|
$40.000
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
961.000
|
$60.000
|
$100.000
|
$86.000
|
$76.200
|
$75.000
|
|
|
INTERSECTIONS (ACP) (TYPE 2)
|
SY
|
332.000
|
$50.000
|
$95.000
|
$105.000
|
$93.500
|
$100.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$900.000
|
$2,000.000
|
$1,700.000
|
$2,400.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$13,000.000
|
$10,000.000
|
$9,000.000
|
$9,700.000
|
$15,000.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
6.000
|
$190.000
|
$250.000
|
$230.000
|
$575.000
|
$215.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
32.000
|
$600.000
|
$775.000
|
$810.000
|
$670.000
|
$750.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
3.000
|
$450.000
|
$675.000
|
$785.000
|
$520.000
|
$740.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$100.000
|
$100.000
|
$140.000
|
$125.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
6.000
|
$100.000
|
$150.000
|
$90.000
|
$220.000
|
$85.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
4.000
|
$85.000
|
$150.000
|
$90.000
|
$225.000
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,235.000
|
$0.400
|
$0.300
|
$0.340
|
$0.290
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
13,850.000
|
$0.400
|
$0.300
|
$0.340
|
$0.290
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,627.000
|
$0.600
|
$0.600
|
$0.670
|
$0.580
|
$0.630
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
18,330.000
|
$0.400
|
$0.300
|
$0.340
|
$0.290
|
$0.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
778.000
|
$1.500
|
$5.000
|
$1.400
|
$1.200
|
$0.720
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
311.000
|
$1.500
|
$5.000
|
$1.400
|
$1.250
|
$0.720
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,627.000
|
$1.000
|
$0.840
|
$0.940
|
$0.930
|
$0.880
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
18,142.000
|
$0.500
|
$0.430
|
$0.480
|
$0.480
|
$0.450
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
2,480.000
|
$0.700
|
$0.700
|
$0.790
|
$0.780
|
$0.740
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
840.000
|
$0.500
|
$0.500
|
$0.560
|
$0.560
|
$0.530
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
11,272.000
|
$0.500
|
$0.430
|
$0.480
|
$0.480
|
$0.450
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
94.000
|
$23.000
|
$21.000
|
$23.500
|
$23.350
|
$22.050
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
10.000
|
$250.000
|
$325.000
|
$365.000
|
$360.000
|
$341.250
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$600.000
|
$850.000
|
$955.000
|
$945.000
|
$892.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
64.000
|
$3.500
|
$10.000
|
$11.000
|
$11.100
|
$10.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
263.000
|
$3.700
|
$5.000
|
$5.600
|
$5.550
|
$5.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
23,243.000
|
$0.500
|
$1.500
|
$0.840
|
$0.850
|
$2.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
18.900
|
$80.000
|
$200.000
|
$56.000
|
$270.000
|
$400.000
|
|
|
LITTER REMOVAL
|
AC
|
25.330
|
$45.000
|
$150.000
|
$45.000
|
$265.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$15,000.000
|
$11,000.000
|
$21,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
220.000
|
$200.000
|
$150.000
|
$280.000
|
$480.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
21.000
|
$200.000
|
$950.000
|
$900.000
|
$85.000
|
$1,000.000
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
1.000
|
$12,000.000
|
$12,000.000
|
$11,000.000
|
$12,550.000
|
$6,000.000
|
|
Totals: |
$2,729,420.955
|
$3,220,733.825
|
$3,379,503.341
|
$3,648,499.748
|
$3,752,393.230
|