Bid Cobra

PARMER US 60 (0168-03-038)

Items: 108

County: PARMER
Length: 1.8510 MILES (3.1742 MILES)
Highway: US 60
District: LUBBOCK
Control Number: 0168-03-038
DBE Goal: 0.0%
Project: F 2026(975)
Guaranty: $100,000.00
Time: 211 WORKING DAYS
Engineer's Estimate: $10,053,818.59
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263213
Type: REHABILITATION OF EXISTING ROADWAY
Project ID: A00120927
Contract Type: FEDERAL
Project Description: REHABILITAITON OF EXISTING ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (5)
E
Engineer's Estimate
$10,053,818.59
$9,764,859.20
Over/Under Est: -2.87% -$288,959.39
$10,064,052.00
Over/Under Est: 0.1% $10,233.41
Amt Left: 3.06% $299,192.80
$10,975,633.53
Over/Under Est: 9.17% $921,814.94
Amt Left: 12.4% $1,210,774.33
Delta: -9.06% -$911,581.53
$11,340,405.99
Over/Under Est: 12.8% $1,286,587.40
Amt Left: 16.13% $1,575,546.79
Delta: -3.32% -$364,772.46
Over/Under Est: 24.72% $2,485,455.15
Amt Left: 28.41% $2,774,414.54
Delta: -10.57% -$1,198,867.75

Bid Items & Bid Tabulations

108 Total 0 of 108
PARMER  |  US 60  |  LUBBOCK  |  0168-03-038  |  08/06/2026 1:00 PM CDT  |  $10,053,818.59  |  F 2026(975)  |  REHAB OF EXIST ROADWAY  |  211 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
J. LEE MILLIGAN, INC.
DUININCK, INC.
RK HALL, LLC
JAMES HAMILTON CONSTRUCTION CO.
SUBGR WIDEN (OC)
STA 23.000 $400.000 $875.000 $2,500.000 $3,300.000 $2,345.920 $2,500.000
BACKFILL (TY B)
STA 23.000 $400.000 $350.000 $250.000 $365.000 $369.520 $1,000.000
BLADING
STA 23.000 $400.000 $150.000 $400.000 $135.000 $531.180 $350.000
PROOF ROLLING
HR 40.000 $160.000 $200.000 $280.000 $220.000 $179.820 $150.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 70,270.000 $1.000 $0.750 $2.250 $1.650 $2.830 $5.000
PRIME COAT (MC-30)
GAL 14,874.000 $5.000 $5.500 $4.750 $5.500 $5.510 $6.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 1,998.000 $5.000 $3.500 $4.500 $5.350 $4.300 $7.000
FOG SEAL (CSS-1H)
GAL 12,649.000 $5.000 $2.750 $4.500 $5.300 $4.310 $4.000
D-GR HMA TY-D SAC-A PG76-28
TON 800.000 $150.000 $218.000 $190.000 $220.000 $179.510 $390.000
TACK COAT
GAL 16,043.000 $5.000 $4.750 $7.150 $2.500 $5.040 $5.000
D-GR HMA TY-B SAC-B PG76-28
TON 25,657.000 $175.000 $180.000 $140.000 $160.000 $173.350 $190.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 8,292.000 $190.000 $225.000 $203.000 $216.000 $206.130 $175.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 1,405.000 $60.000 $72.000 $52.000 $71.000 $159.060 $73.000
PLANE ASPH CONC PAV(0" TO 8")
SY 70,270.000 $8.000 $4.250 $9.000 $10.500 $8.800 $6.250
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 30.000 $440.000 $315.000 $380.000 $385.000 $385.000 $385.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 44.000 $715.000 $630.000 $760.000 $770.000 $770.000 $770.000
RIPRAP (CONC)(5 IN)
CY 1.350 $165.000 $788.000 $1,840.000 $1,800.000 $1,815.000 $1,815.000
CLEAN EXIST CULVERTS
CY 48.000 $100.000 $196.000 $550.000 $110.000 $110.000 $825.000
REMOVE STR (DRIVEWAY CULVERT)
EA 1.000 $1,000.000 $2,017.000 $3,300.000 $1,100.000 $550.000 $2,250.000
MOBILIZATION
LS 1.000 $914,000.000 $750,000.000 $1,107,000.000 $1,075,000.000 $1,253,917.950 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $20,000.000 $11,000.000 $55,000.000 $65,000.000 $50,836.150 $98,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 726.000 $150.000 $35.000 $125.000 $110.000 $52.270 $50.000
TMA (STATIONARY)
DAY 422.000 $150.000 $325.000 $325.000 $275.000 $558.060 $300.000
TMA (MOBILE OPERATION)
DAY 30.000 $300.000 $750.000 $1,000.000 $990.000 $105.940 $950.000
SANDBAGS FOR EROSION CONTROL
EA 110.000 $15.000 $26.000 $25.000 $27.500 $27.500 $75.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 500.000 $10.000 $12.000 $10.000 $13.000 $13.200 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 220.000 $3.000 $2.000 $8.000 $2.200 $2.200 $5.000
INTERSECTIONS (ACP)
SY 2,772.000 $90.000 $85.000 $50.000 $115.000 $134.620 $110.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 3.000 $6,600.000 $7,875.000 $7,300.000 $7,400.000 $7,425.000 $7,425.000
CONDT (PVC) (SCH 80) (2")
LF 1,335.000 $15.000 $16.000 $26.000 $26.500 $26.400 $26.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 730.000 $25.000 $19.000 $32.500 $33.000 $33.000 $33.000
CONDT (PVC) (SCH 80) (4")
LF 35.000 $35.000 $21.000 $43.250 $44.000 $44.000 $44.000
CONDT (PVC) (SCH 80) (4") (BORE)
LF 160.000 $40.000 $26.000 $54.000 $55.000 $55.000 $55.000
ELEC CONDR (NO.6) BARE
LF 1,112.000 $5.000 $3.150 $2.900 $2.900 $2.920 $3.000
ELEC CONDR (NO.6) INSULATED
LF 1,703.000 $5.000 $3.400 $3.350 $3.400 $3.410 $3.500
ELEC CONDR (NO.2) INSULATED
LF 165.000 $5.000 $5.250 $6.950 $7.050 $7.040 $7.000
GROUND BOX TY D (162922)
EA 2.000 $1,500.000 $1,050.000 $2,055.000 $2,100.000 $2,090.000 $2,400.000
GROUND BOX TY D (162922)W/APRON
EA 3.000 $2,465.000 $1,470.000 $2,325.000 $2,400.000 $2,365.000 $2,365.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $10,950.000 $7,875.000 $9,225.000 $9,400.000 $9,377.500 $9,380.000
ALUMINUM SIGNS (TY A)
SF 77.500 $35.000 $36.000 $70.000 $46.500 $46.200 $46.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 15.000 $800.000 $1,040.000 $865.000 $1,100.000 $1,089.000 $1,090.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $1,000.000 $1,040.000 $960.000 $1,100.000 $1,094.500 $1,090.000
REMOVE SM RD SN SUP&AM
EA 22.000 $150.000 $105.000 $200.000 $110.000 $110.000 $110.000
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 20.000 $50.000 $16.000 $425.000 $16.500 $16.500 $16.500
INSTL OM SM RD SIGN (1-OM-PW)R
EA 2.000 $25.000 $16.000 $425.000 $16.500 $5.500 $16.500
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 22,944.000 $0.280 $0.220 $0.350 $0.230 $0.230 $0.330
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 50,025.000 $0.250 $0.220 $0.350 $0.230 $0.230 $0.330
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 16,744.000 $0.300 $0.220 $0.350 $0.230 $0.230 $0.330
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 155,250.000 $0.250 $0.200 $0.350 $0.210 $0.210 $0.330
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 2,596.000 $2.780 $4.500 $4.350 $4.700 $4.680 $4.400
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 5,192.000 $1.890 $4.500 $4.350 $4.700 $4.680 $4.400
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 18,247.000 $0.630 $1.000 $1.100 $1.050 $1.050 $1.100
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 29,812.000 $0.660 $1.000 $1.100 $1.050 $1.050 $1.100
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 870.000 $1.270 $1.100 $1.500 $1.700 $1.980 $1.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,128.000 $1.210 $1.100 $1.500 $1.700 $1.980 $1.250
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 31.000 $1.500 $3.150 $1.350 $3.300 $3.300 $1.400
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 96.000 $1.000 $3.150 $1.600 $3.300 $3.300 $1.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 987.000 $1.000 $1.260 $1.500 $1.300 $1.320 $1.500
RE PROF PM (W)6"(SLD) RAISD PROF ONLY
LF 677.000 $5.000 $2.630 $4.350 $2.750 $2.750 $4.400
RE PROF PM (Y)6"(SLD) RAISD PROF ONLY
LF 770.000 $5.000 $2.630 $4.350 $2.750 $2.750 $4.400
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 5,010.000 $1.000 $1.260 $1.050 $1.300 $1.320 $1.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 6,886.000 $1.000 $1.260 $1.000 $1.300 $1.320 $1.000
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 4,080.000 $1.000 $1.260 $1.050 $1.300 $1.320 $1.000
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 25,465.000 $1.000 $0.950 $1.000 $0.990 $0.990 $1.000
PREFAB PM TY B (W)(6")(BRK)
LF 550.000 $12.500 $9.000 $9.200 $9.350 $9.350 $9.350
PREFAB PM TY B (W)(8")(SLD)
LF 550.000 $9.500 $13.000 $10.800 $13.000 $13.200 $11.000
PREFAB PM TY B (W)(24")(SLD)
LF 595.000 $33.000 $34.000 $38.400 $35.500 $35.200 $39.000
PREFAB PM TY B (W)(ARROW)
EA 9.000 $650.000 $470.000 $760.000 $490.000 $491.700 $770.000
PREFAB PM TY B (W)(36")(YLD TRI)
EA 10.000 $60.000 $63.000 $110.000 $66.000 $66.000 $110.000
PREFAB PM TY B (Y)(6")(BRK)
LF 260.000 $6.500 $9.000 $9.200 $9.350 $9.350 $9.350
PREFAB PM TY B (Y)(6")(SLD)
LF 2,774.000 $8.000 $8.500 $8.650 $8.800 $8.800 $8.800
PREFAB PM TY C (W)(24")(SLD)
LF 873.000 $16.000 $15.000 $16.250 $15.500 $15.400 $16.500
PREFAB PM TY C (W)(ARROW)
EA 9.000 $225.000 $404.000 $325.000 $425.000 $423.500 $330.000
REFL PAV MRKR TY I-C
EA 153.000 $4.000 $4.750 $6.750 $4.950 $4.950 $6.900
REFL PAV MRKR TY II-A-A
EA 189.000 $4.000 $4.750 $6.750 $4.950 $4.950 $6.900
ELIM EXT PM & MRKS (6")
LF 11,586.000 $0.500 $0.900 $2.150 $0.940 $0.940 $2.200
ELIM EXT PM & MRKS (8")
LF 688.000 $0.500 $1.000 $2.450 $1.050 $1.050 $2.500
ELIM EXT PM & MRKS (12")
LF 882.000 $1.500 $2.100 $3.900 $2.200 $2.200 $4.000
ELIM EXT PM & MRKS (24")
LF 252.000 $3.000 $6.300 $5.950 $6.600 $6.600 $6.100
ELIM EXT PM & MRKS (ARROW)
EA 9.000 $40.000 $126.000 $110.000 $130.000 $132.000 $110.000
PAV SURF PREP FOR MRK (6")
LF 550.000 $0.250 $0.600 $2.150 $0.610 $0.610 $2.200
PAV SURF PREP FOR MRK (8")
LF 550.000 $0.250 $0.700 $1.350 $0.720 $0.720 $1.400
PAV SURF PREP FOR MRK (12")
LF 922.000 $1.500 $2.100 $3.250 $2.200 $2.200 $3.300
PAV SURF PREP FOR MRK (24")
LF 285.000 $3.500 $4.200 $4.350 $4.400 $4.400 $4.400
PAV SURF PREP FOR MRK (ARROW)
EA 9.000 $12.000 $100.000 $110.000 $105.000 $104.500 $110.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 10.000 $12.000 $8.500 $21.650 $8.800 $8.800 $22.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $32,850.000 $42,000.000 $34,500.000 $35,000.000 $34,925.000 $34,925.000
VEH SIG SEC (12")LED(GRN)
EA 4.000 $415.000 $352.000 $415.000 $425.000 $423.500 $424.000
VEH SIG SEC (12")LED(GRN ARW)
EA 3.000 $415.000 $352.000 $415.000 $425.000 $423.500 $424.000
VEH SIG SEC (12")LED(YEL)
EA 4.000 $415.000 $352.000 $415.000 $425.000 $423.500 $424.000
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $415.000 $352.000 $415.000 $425.000 $423.500 $424.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $415.000 $352.000 $415.000 $425.000 $423.500 $424.000
VEH SIG SEC (12")LED(RED ARW)
EA 3.000 $415.000 $352.000 $415.000 $425.000 $423.500 $424.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 6.000 $245.000 $137.000 $350.000 $360.000 $357.500 $358.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 1.000 $275.000 $210.000 $415.000 $425.000 $423.500 $423.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 390.000 $5.000 $4.200 $4.900 $4.950 $4.950 $5.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 80.000 $10.000 $5.250 $6.250 $6.350 $6.330 $6.300
TRF SIG CBL (TY A)(12 AWG)(12 CONDR)
LF 215.000 $10.000 $9.500 $7.900 $8.050 $8.030 $8.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $39,000.000 $42,000.000 $40,500.000 $41,000.000 $40,911.200 $40,910.000
INS TRF SIG PL AM(S)2 ARM(55-28')LUM
EA 1.000 $42,705.000 $44,625.000 $47,000.000 $47,500.000 $47,564.000 $47,600.000
INSTALL OF CABLES
LF 425.000 $5.000 $4.500 $3.250 $3.300 $3.300 $3.300
FULL - WIDTH MOWING
CYC 1.000 $3,000.000 $6,000.000 $5,790.000 $5,300.000 $1,205.270 $4,600.000
LITTER REMOVAL
CYC 2.000 $1,000.000 $3,600.000 $3,325.000 $4,500.000 $1,312.750 $3,000.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 4.000 $3,000.000 $6,000.000 $3,100.000 $1,700.000 $2,750.000 $5,400.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 83,234.000 $7.000 $4.200 $4.500 $5.050 $4.510 $6.000
ASPH FOR REINF FAB (PG76-28)
GAL 12,485.000 $6.000 $5.600 $4.000 $3.800 $4.110 $6.000
TEMP SPEED MONITOR SYS
EA 2.000 $15,000.000 $15,000.000 $11,000.000 $16,500.000 $9,005.920 $23,000.000
LED ROADSIDE SIGN
EA 2.000 $4,000.000 $3,675.000 $5,100.000 $3,900.000 $3,850.000 $4,300.000
Totals: $10,053,818.590 $9,764,859.200 $10,064,052.000 $10,975,633.530 $11,340,405.990 $12,539,273.740
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
MATERIAL FURNISHED BY THE STATE (NON-PART) $79,117.25
PUBLIC UTILITY FORCE ACCT WORK (PART) $5,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,100.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $51,000.00
Total: $140,217.25