Show Job Controls
Bid Cobra

POLK US0059 (6498-61-001)

Items: 16

County: POLK
Length: 0.0100 MILES
Highway: US0059
District: LUFKIN
Control Number: 6498-61-001
DBE Goal: 0.0%
Project: RMC - A00220031
Guaranty: $5,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $188,500.00
Date: 06/29/2026 9:30 AM CDT (2 months ago)
Contract Number: 6261104
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00220031
Project Description: REPAIR/UPGRADE AND MAINTENANCE OF METAL BEAM GUARD FENCE
Mail/Deliver Bids To: N/A
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (3)
E
Engineer's Estimate
$188,500.00
Over/Under Est: -25.95% -$48,911.00
$150,550.00
Over/Under Est: -20.13% -$37,950.00
Amt Left: 7.85% $10,961.00
$321,625.00
Over/Under Est: 70.62% $133,125.00
Amt Left: 130.41% $182,036.00
Delta: -113.63% -$171,075.00

Bid Items & Bid Tabulations

16 Total 0 of 16
POLK  |  US0059  |  LUFKIN  |  6498-61-001  |  06/29/2026 9:30 AM CDT  |  $188,500.00  |  RMC - A00220031  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BARRICADE COMPANY, L.L.C.
RHINO EQUITY, LLC
ODUM SERVICES, LLC
MOBILIZATION (CALLOUT)
EA 10.000 $1,000.000 $1.000 $1,000.000 $3,500.000
TMA (STATIONARY)
DAY 30.000 $250.000 $1,750.000 $1,000.000 $300.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $1,250.000 $1,000.000 $2,000.000 $1,750.000
REPLACE W-BEAM RAIL
LF 600.000 $65.000 $55.000 $50.000 $20.000
REPLACE THRIE-BEAM RAIL
LF 300.000 $70.000 $1.000 $1.000 $28.000
REPLACE GUARDRAIL END TREATMENT SYSTEM
EA 2.000 $5,000.000 $8,726.000 $25,000.000 $4,000.000
REPLACE CURVED RAIL
LF 25.000 $150.000 $39.000 $50.000 $20.000
REPLACE LOW FILL CULVERT RAIL
LF 25.000 $150.000 $32.000 $150.000 $15.000
REMOVE RAIL
LF 25.000 $50.000 $82.000 $10.000 $4.000
REPLACE (REACT)(M)
EA 2.000 $10,000.000 $1.000 $500.000 $29,000.000
REPAIR (TAU II-R) NARROW
LF 15.000 $150.000 $100.000 $500.000 $5,000.000
REPLACE (NARROW QUAD)
EA 2.000 $8,000.000 $5,000.000 $1,000.000 $22,000.000
REPAIR (NARROW QUAD NOSE)
EA 2.000 $2,500.000 $1,000.000 $2,000.000 $5,000.000
REPAIR (NARROW QUAD BAY)
EA 2.000 $2,000.000 $1,000.000 $1,000.000 $5,000.000
REPLACE (TAU-M) NARROW
EA 2.000 $15,000.000 $5,000.000 $1,000.000 $22,000.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 25.000 $500.000 $200.000 $100.000 $150.000
Totals: $188,500.000 $139,589.000 $150,550.000 $321,625.000