PREPARING ROW
|
AC
|
3.700
|
$750.000
|
$20,000.000
|
$12,000.000
|
$1,300.000
|
$20,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
2,619.000
|
$12.500
|
$9.160
|
$20.000
|
$15.000
|
$15.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
250.000
|
$15.000
|
$11.010
|
$20.000
|
$15.000
|
$25.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
2,650.000
|
$5.000
|
$7.300
|
$12.000
|
$10.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
22,955.000
|
$12.000
|
$7.000
|
$10.000
|
$15.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
1,890.000
|
$18.000
|
$17.000
|
$20.000
|
$20.000
|
$50.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
1.940
|
$900.000
|
$2,601.720
|
$2,000.000
|
$1,000.000
|
$4,000.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
5,088.000
|
$17.000
|
$32.000
|
$26.000
|
$20.000
|
$50.000
|
|
|
REWORK BS MTL (TY B) (8") (DENS CONT)
|
SY
|
5,088.000
|
$5.000
|
$6.000
|
$12.000
|
$6.000
|
$20.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,075.000
|
$5.000
|
$9.820
|
$8.000
|
$5.000
|
$10.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
585.000
|
$5.000
|
$9.620
|
$6.000
|
$7.000
|
$15.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
946.000
|
$110.000
|
$153.750
|
$150.000
|
$125.000
|
$250.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
566.000
|
$125.000
|
$173.850
|
$180.000
|
$130.000
|
$300.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
846.000
|
$4.000
|
$17.840
|
$15.000
|
$20.000
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
280.000
|
$160.000
|
$230.000
|
$220.000
|
$200.000
|
$500.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
298.000
|
$70.000
|
$70.000
|
$100.000
|
$60.000
|
$300.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,508.000
|
$160.000
|
$217.820
|
$150.000
|
$180.000
|
$400.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
110.400
|
$1,100.000
|
$847.700
|
$850.000
|
$850.000
|
$1,200.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
82.000
|
$1,200.000
|
$1,207.220
|
$900.000
|
$900.000
|
$1,200.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
65.400
|
$1,300.000
|
$1,593.160
|
$1,000.000
|
$700.000
|
$1,200.000
|
|
|
CL C CONC (CRASHWALL)(HPC)
|
CY
|
268.200
|
$1,400.000
|
$550.250
|
$700.000
|
$1,040.000
|
$1,200.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
14,800.000
|
$25.000
|
$20.770
|
$22.000
|
$25.000
|
$25.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
156.100
|
$575.000
|
$603.530
|
$600.000
|
$570.000
|
$1,000.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,208.000
|
$170.000
|
$168.750
|
$205.000
|
$205.000
|
$250.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
1,094.000
|
$6.000
|
$10.040
|
$8.000
|
$6.000
|
$10.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,082.000
|
$450.000
|
$400.000
|
$420.000
|
$385.000
|
$700.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
39.000
|
$400.000
|
$394.250
|
$450.000
|
$400.000
|
$800.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
186.000
|
$600.000
|
$508.520
|
$450.000
|
$460.000
|
$600.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
834.000
|
$77.000
|
$91.000
|
$110.000
|
$75.000
|
$110.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
152.000
|
$100.000
|
$110.800
|
$200.000
|
$80.000
|
$300.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$140,000.000
|
$80,000.000
|
$300,000.000
|
$350,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$485,000.000
|
$465,000.000
|
$484,000.000
|
$850,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$13,000.000
|
$3,865.410
|
$8,000.000
|
$24,000.000
|
$10,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,698.000
|
$4.000
|
$4.460
|
$2.200
|
$2.500
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,698.000
|
$1.000
|
$1.490
|
$1.000
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
325.000
|
$4.000
|
$7.430
|
$4.000
|
$3.500
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
325.000
|
$1.000
|
$4.460
|
$1.000
|
$1.000
|
$5.000
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
5,279.000
|
$92.000
|
$87.000
|
$132.000
|
$105.000
|
$150.000
|
|
|
CONSTRUCTING DETOURS (TY 2)
|
SY
|
982.000
|
$90.000
|
$87.000
|
$10.000
|
$20.000
|
$200.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
5,875.000
|
$9.000
|
$14.000
|
$20.000
|
$10.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
5,875.000
|
$9.000
|
$14.000
|
$18.000
|
$6.000
|
$15.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
1,181.000
|
$70.000
|
$111.000
|
$110.000
|
$76.000
|
$150.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
13,257.000
|
$0.200
|
$0.520
|
$0.400
|
$0.300
|
$1.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,481.000
|
$25.000
|
$40.140
|
$25.000
|
$25.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,700.000
|
$1,784.030
|
$2,000.000
|
$1,700.000
|
$3,000.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
1.000
|
$600.000
|
$892.020
|
$1,800.000
|
$1,350.000
|
$2,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECT (TY IV)
|
EA
|
2.000
|
$1,000.000
|
$3,270.730
|
$2,700.000
|
$1,200.000
|
$3,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,985.000
|
$3.000
|
$3.000
|
$2.000
|
$3.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$250.000
|
$743.340
|
$300.000
|
$200.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,300.000
|
$1,784.030
|
$2,700.000
|
$2,750.000
|
$5,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$270.000
|
$892.020
|
$500.000
|
$200.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$10,500.000
|
$3,716.750
|
$15,000.000
|
$11,000.000
|
$15,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,000.000
|
$3,716.750
|
$2,000.000
|
$2,600.000
|
$2,500.000
|
|
|
CHAIN LINK FENCE (INSTALL) (8')
|
LF
|
420.000
|
$35.000
|
$88.540
|
$80.000
|
$30.000
|
$7.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
22.000
|
$25.000
|
$37.170
|
$40.000
|
$20.000
|
$40.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
2.000
|
$75.000
|
$96.630
|
$60.000
|
$135.000
|
$250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
43.000
|
$20.000
|
$22.300
|
$50.000
|
$30.000
|
$60.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
11,108.000
|
$0.500
|
$0.370
|
$1.350
|
$1.250
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
9,749.000
|
$0.500
|
$0.370
|
$1.500
|
$1.250
|
$2.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
2,021.000
|
$0.800
|
$1.490
|
$0.250
|
$0.150
|
$0.500
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
10,134.000
|
$0.800
|
$0.900
|
$0.250
|
$0.150
|
$0.500
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
8,886.000
|
$0.800
|
$1.490
|
$0.250
|
$0.150
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
397.000
|
$1.300
|
$4.460
|
$2.250
|
$2.000
|
$4.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,588.000
|
$1.300
|
$2.230
|
$2.250
|
$2.000
|
$4.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,588.000
|
$1.300
|
$2.230
|
$2.250
|
$2.000
|
$4.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
127.000
|
$5.000
|
$8.920
|
$10.000
|
$6.000
|
$12.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
12,970.000
|
$0.750
|
$1.110
|
$1.000
|
$0.750
|
$2.000
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
1,094.000
|
$1.500
|
$1.110
|
$1.000
|
$15.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,543.000
|
$1.200
|
$0.740
|
$1.000
|
$0.720
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$200.000
|
$115.000
|
$85.000
|
$2,150.000
|
$500.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
4,000.000
|
$15.000
|
$14.000
|
$15.000
|
$15.000
|
$25.000
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
4,000.000
|
$1.000
|
$1.500
|
$2.000
|
$1.000
|
$10.000
|
|
|
TMA (STATIONARY)
|
DAY
|
79.000
|
$300.000
|
$165.000
|
$120.000
|
$760.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$45.000
|
$50.000
|
$60.000
|
$95.000
|
$125.000
|
|
Totals: |
$4,987,163.700
|
$4,976,890.284
|
$5,192,876.200
|
$5,325,284.460
|
$8,359,867.500
|