POTTER US 87 (0041-07-121)

Items: 171

County: POTTER
Length: 11.8160 MILES (12.6162 MILES)
Highway: US 87
District: AMARILLO
Control Number: 0041-07-121
DBE Goal: 0.0%
Project: F 2026(989)
Guaranty: $100,000.00
Time: 217 WORKING DAYS
Engineer's Estimate: $31,174,130.40
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263203
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00193006
Contract Type: FEDERAL
Project Description: HOT IN PLACE RECYCLE, ACP OVERLAY, SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$31,174,130.40
$30,085,056.41
Over/Under Est: -3.49% -$1,089,073.99
$30,964,795.56
Over/Under Est: -0.67% -$209,334.84
Amt Left: 2.92% $879,739.15
$33,654,544.18
Over/Under Est: 7.96% $2,480,413.78
Amt Left: 11.86% $3,569,487.77
Delta: -8.69% -$2,689,748.62

Bid Items & Bid Tabulations

171 Total 0 of 171
POTTER  |  US 87  |  AMARILLO  |  0041-07-121  |  08/06/2026 1:00 PM CDT  |  $31,174,130.40  |  F 2026(989)  |  SURF/ROADWAY RESTOR  |  217 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
RK HALL, LLC
GILVIN-TERRILL, LTD.
PREPARING ROW
AC 37.000 $10,000.000 $300.000 $340.180 $1,000.000
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 23.000 $1,100.000 $235.000 $1,027.560 $2,000.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 14.000 $2,000.000 $2,050.000 $1,834.920 $2,200.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 2.000 $4,000.000 $4,300.000 $5,137.790 $2,500.000
REMOV CONC (MOWSTRIP)
LF 12,242.000 $7.000 $8.000 $8.830 $10.000
REMOV CONC (RIPRAP)
CY 37.000 $150.000 $130.000 $12.600 $30.000
REMOV CONC (CURB & GUTTER)
LF 1,464.000 $28.000 $4.500 $8.400 $10.000
REMOV CONC (FLUME)
SY 337.000 $15.000 $31.500 $12.600 $25.000
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
SY 6,980.000 $10.000 $10.000 $18.880 $15.000
EXCAV (ROADWAY)
CY 5,977.000 $30.000 $18.500 $18.420 $30.000
SUBGR WIDEN (DC)
STA 9.000 $2,500.000 $1,350.000 $1,904.410 $1,000.000
EMBANK (FNL)(DC)(TY B)
CY 2,887.000 $20.000 $35.000 $24.610 $25.000
BACKFILL (TY A)
STA 886.000 $190.000 $365.000 $251.390 $250.000
BLADING
HR 25.000 $220.000 $500.000 $399.250 $150.000
DRILL SEED (PERM_RURAL_CLAY)
AC 37.000 $800.000 $600.000 $588.000 $560.000
DRILL SEED (TEMP_WARM_COOL)
AC 37.000 $800.000 $450.000 $441.900 $425.000
HYDRO MULCH SEED (PERM_URBAN_CLAY)
AC 3.000 $1,000.000 $4,050.000 $3,956.750 $4,000.000
SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL)
SY 1,487.000 $2.250 $3.100 $3.050 $3.000
FL BS (CMP IN PLC)(TY A OR B GR 4)(12")
SY 13,252.000 $39.000 $31.250 $41.500 $30.000
CEMENT
TON 142.000 $320.000 $256.400 $249.400 $250.000
CEMENT TRT (SUBGRADE) (8")
SY 13,252.000 $6.000 $7.500 $7.170 $10.000
PRIME COAT (MC-30)
GAL 7,785.000 $4.500 $5.000 $4.960 $5.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 45,050.000 $3.000 $3.750 $7.750 $4.500
AGGR (TY-B, GR-4)(SAC-A)
CY 121.000 $200.000 $430.000 $474.910 $300.000
ASPH (MULTI OPTION)
GAL 5,037.000 $5.000 $4.850 $4.890 $10.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 78,909.000 $188.000 $174.000 $197.500 $205.000
TACK COAT
GAL 173,238.000 $6.500 $6.050 $6.410 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 15,606.000 $51.000 $45.850 $54.010 $60.000
PLANE ASPH CONC PAV(0" TO 3")
SY 47,254.000 $4.000 $6.100 $3.410 $7.000
PLANE ASPH CONC PAV(2" TO 4")
SY 2,500.000 $6.000 $8.200 $12.580 $7.000
PLANE ASPH CONC PAV(3")
SY 23,894.000 $4.000 $5.050 $3.410 $7.000
HIR (SURFACE)(2.5")
SY 256,294.000 $5.200 $8.350 $8.210 $8.000
HIR (RECYCLING AGENT)
GAL 153,597.000 $3.200 $4.650 $4.730 $4.500
CUT & RESTORING PAV
SY 18.000 $300.000 $175.000 $198.780 $100.000
TEMPORARY SPL SHORING
SF 9,828.000 $100.000 $5.500 $78.230 $50.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 126.000 $220.000 $160.000 $99.750 $140.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 325.000 $275.000 $187.000 $267.750 $220.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 23.000 $600.000 $750.000 $735.000 $400.000
CL C CONC (COLLAR)
EA 3.000 $650.000 $1,620.000 $630.000 $3,500.000
RETAINING WALL (MSE)
SF 6,955.000 $135.000 $92.250 $106.520 $150.000
CONCRETE PAINT FINISH
SF 36,816.000 $1.000 $0.550 $2.100 $1.000
RIPRAP (CONC)(4 IN)
CY 1,062.000 $725.000 $685.000 $735.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 627.000 $750.000 $693.000 $735.000 $700.000
CLEANING EXISTING JOINTS
LF 1,742.000 $5.000 $27.000 $37.730 $35.000
RAIL (TY SSTR)
LF 1,075.000 $94.000 $128.250 $125.900 $150.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 8.000 $500.000 $1,030.000 $1,050.000 $3,000.000
CONC BOX CULV (3 FT X 2.5 FT)(EXTEND)
LF 8.000 $500.000 $1,085.000 $1,050.000 $3,000.000
RC PIPE (CL III)(24 IN)
LF 100.000 $130.000 $205.000 $147.000 $300.000
RC PIPE (CL III)(30 IN)
LF 10.000 $400.000 $325.000 $210.000 $325.000
RC PIPE (CL III)(36 IN)
LF 12.000 $425.000 $530.000 $294.000 $400.000
RC PIPE (CL III)(54 IN)
LF 16.000 $780.000 $560.000 $656.250 $600.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $7,900.000 $6,400.000 $6,300.000 $8,000.000
INLET (COMPL)(PSL)(FG)(5FTX6FT-4FTX4FT)
EA 1.000 $11,700.000 $9,300.000 $11,550.000 $11,000.000
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
EA 3.000 $11,700.000 $9,200.000 $10,500.000 $11,000.000
SET (TY I)(S= 3 FT)(HW= 4 FT)(6:1)(C)
EA 1.000 $10,000.000 $12,600.000 $11,550.000 $10,000.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1)(C)
EA 2.000 $11,000.000 $12,800.000 $14,700.000 $10,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $3,000.000 $3,700.000 $3,150.000 $5,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 1.000 $3,000.000 $6,000.000 $7,875.000 $7,500.000
ADJUSTING INLETS (CAP)
EA 2.000 $3,600.000 $4,300.000 $5,250.000 $3,500.000
CLEAN EXIST CULVERTS
EA 2.000 $3,000.000 $10,400.000 $2,100.000 $11,000.000
REMOV STR (SET)
EA 5.000 $1,000.000 $1,740.000 $262.500 $1,500.000
REMOV STR (PIPE)
LF 12.000 $30.000 $250.000 $21.000 $200.000
REMOV STR (BOX CULVERT)
LF 6.000 $150.000 $290.000 $105.000 $700.000
REMOV STR (RET WALL)
LF 335.000 $550.000 $70.000 $52.500 $40.000
MOBILIZATION
LS 1.000 $2,550,000.000 $3,305,620.000 $1,000,000.000 $3,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $20,000.000 $25,000.000 $36,936.890 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,500.000 $26,200.000 $9,836.340 $18,500.000
TMA (STATIONARY)
DAY 300.000 $200.000 $320.000 $524.310 $375.000
TMA (MOBILE OPERATION)
HR 112.000 $100.000 $88.000 $99.530 $50.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 150.000 $6.250 $8.000 $8.400 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 150.000 $2.000 $3.000 $4.200 $4.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 3,720.000 $20.000 $16.000 $16.850 $10.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,980.000 $17.500 $11.750 $12.360 $5.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 3,720.000 $20.000 $20.000 $20.790 $10.000
PORT CTB (CONNECTION HARDWARE)
EA 124.000 $50.000 $90.000 $95.500 $50.000
CONC CURB & GUTTER (TY II)
LF 600.000 $55.000 $32.000 $42.000 $30.000
DRIVEWAYS (ACP)
SY 105.000 $100.000 $57.500 $122.150 $35.000
CONC DIRECTIONAL ISLAND
SY 47.000 $120.000 $173.250 $84.000 $170.000
MTL W-BEAM GD FEN (STEEL POST)
LF 16,150.000 $32.000 $32.600 $32.550 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 25.000 $1,800.000 $2,780.000 $2,937.950 $2,300.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $50.000 $2,245.000 $2,100.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 21.000 $1,150.000 $1,875.000 $1,575.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 16,606.000 $4.000 $1.050 $3.150 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 13.000 $250.000 $105.000 $315.000 $300.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 13.000 $150.000 $105.000 $210.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 25.000 $260.000 $105.000 $210.000 $200.000
RM MTL BM GD FEN TRANS (T101)
EA 2.000 $20.000 $105.000 $210.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 37.000 $3,200.000 $3,750.000 $3,543.750 $3,375.000
GUARDRAIL END TREATMENT (REMOVE)
EA 39.000 $250.000 $105.000 $315.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $2,700.000 $1,600.000 $1,685.250 $3,250.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $1,200.000 $1,175.000 $1,235.850 $1,150.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $29,000.000 $37,400.000 $39,322.500 $30,000.000
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 3.000 $9,500.000 $9,600.000 $10,111.500 $10,000.000
CONDT (PVC) (SCH 40) (1 1/2")
LF 20.000 $10.000 $26.750 $26.250 $15.000
CONDT (PVC) (SCH 40) (1 1/2") (BORE)
LF 180.000 $50.000 $26.750 $26.250 $15.000
CONDT (PVC) (SCH 40) (3")
LF 20.000 $20.000 $32.000 $31.500 $15.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 180.000 $75.000 $42.750 $42.000 $18.000
ELEC CONDR (NO.8) BARE
LF 1,660.000 $2.200 $3.150 $3.100 $3.000
TRAY CABLE (3 CONDR) (12 AWG)
LF 915.000 $2.830 $4.000 $3.940 $3.000
GROUND BOX TY A (122311)W/APRON
EA 2.000 $1,400.000 $1,815.000 $1,785.000 $1,250.000
GROUND BOX TY B (122322)W/APRON
EA 1.000 $2,500.000 $2,030.000 $1,995.000 $1,800.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $2,500.000 $2,620.000 $2,574.600 $1,500.000
REMOVE GROUND BOX
EA 5.000 $300.000 $425.000 $420.000 $500.000
ALUMINUM SIGNS (TY A)
SF 63.250 $40.000 $32.000 $126.000 $36.000
ALUMINUM SIGNS (TY G)
SF 3,491.000 $50.000 $37.400 $34.650 $30.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 4,816.000 $50.000 $53.450 $40.320 $34.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $850.000 $1,050.000 $772.800 $700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 11.000 $950.000 $1,230.000 $966.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 83.000 $950.000 $1,175.000 $869.400 $775.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $1,100.000 $1,255.000 $958.650 $755.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 15.000 $1,200.000 $1,470.000 $4,237.460 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,200.000 $1,550.000 $1,873.880 $1,300.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,400.000 $1,815.000 $1,492.050 $1,500.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $2,200.000 $2,085.000 $1,620.150 $2,300.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 10.000 $500.000 $1,070.000 $462.000 $325.000
REMOVE SM RD SN SUP&AM
EA 112.000 $125.000 $105.000 $112.350 $100.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 10.000 $100.000 $535.000 $561.750 $25.000
INSTALL LRSS (STRUCT STEEL)
LB 24,026.000 $9.000 $10.100 $8.090 $6.750
REMOVE LRSA
EA 46.000 $900.000 $1,070.000 $735.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 162.000 $45.000 $48.000 $43.050 $45.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 54.000 $45.000 $48.000 $43.050 $45.000
INSTL OM SM RD SIGN (1-OM-CON)R
EA 1.000 $10.000 $285.000 $151.200 $200.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GNDLL
EA 10.000 $150.000 $145.000 $110.250 $75.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GNDLL
EA 6.000 $120.000 $145.000 $110.250 $75.000
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 77.000 $1.000 $37.000 $13.650 $13.000
INSTL OM SM RD SIGN (1-OM-PW)R
EA 9.000 $1.000 $37.000 $13.650 $15.000
INSTL OM SM RD SIGN (2-OM-PW)Y
EA 1.000 $1.000 $43.000 $17.850 $13.000
INSTL OM LG RD SIGN (2-OM-PW)Y
EA 23.000 $1.000 $43.000 $17.850 $18.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 36,693.000 $0.350 $0.300 $0.280 $0.270
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 143,656.000 $0.350 $0.300 $0.260 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 250.000 $1.000 $0.370 $0.370 $0.350
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 63.000 $6.000 $17.000 $16.800 $16.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 132,628.000 $0.350 $0.270 $0.260 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 11,424.000 $1.000 $1.450 $2.150 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,904.000 $1.000 $1.500 $2.150 $1.500
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 8,165.000 $1.000 $1.350 $1.310 $1.250
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 63.000 $1.300 $1.600 $1.580 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 28,151.000 $1.000 $1.100 $1.100 $1.050
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 450.000 $10.000 $5.850 $5.780 $5.500
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 34,343.000 $0.750 $0.750 $0.740 $0.700
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 131,234.000 $0.700 $0.700 $0.680 $0.650
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 129,751.000 $0.700 $0.700 $0.680 $0.650
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 198.000 $4.000 $2.650 $2.630 $2.500
PREFAB PM TY C (W)(24")(SLD)
LF 237.000 $14.000 $16.000 $15.750 $15.000
PREFAB PM TY C (W)(ARROW)
EA 12.000 $300.000 $267.000 $262.500 $250.000
PREFAB PM TY C (W)(DBL ARROW)
EA 1.000 $380.000 $480.000 $472.500 $450.000
PREFAB PM TY C (W)(WORD)
EA 8.000 $300.000 $425.000 $420.000 $400.000
REFL PAV MRKR TY I-A
EA 24.000 $7.000 $7.600 $7.430 $7.080
RECESSED REFL PAV MRKR TY II-C-R
EA 2,904.000 $39.000 $42.750 $42.000 $40.000
ELIM EXT PM & MRKS (6")
LF 13,611.000 $0.500 $1.050 $1.050 $1.000
ELIM EXT PM & MRKS (8")
LF 500.000 $1.750 $1.350 $1.310 $1.250
ELIM EXT PM & MRKS (24")
LF 24.000 $4.750 $5.350 $5.250 $5.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $2,000.000 $8,900.000 $8,741.250 $2,000.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $8,500.000 $42,690.000 $41,921.250 $34,500.000
VEH SIG SEC (12")LED(GRN)
EA 2.000 $310.000 $510.000 $498.750 $375.000
VEH SIG SEC (12")LED(GRN ARW)
EA 3.000 $310.000 $510.000 $498.750 $375.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $310.000 $510.000 $498.750 $375.000
VEH SIG SEC (12")LED(YEL ARW)
EA 5.000 $310.000 $510.000 $498.750 $375.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $310.000 $510.000 $498.750 $375.000
VEH SIG SEC (12")LED(RED ARW)
EA 1.000 $310.000 $510.000 $498.750 $375.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 3.000 $250.000 $345.000 $341.250 $200.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 2.000 $250.000 $410.000 $404.250 $225.000
RETROFIT REFL BRDR SHEETING (3 SEC)
EA 2.000 $145.000 $320.000 $315.000 $200.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 140.000 $3.250 $3.750 $3.680 $3.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 110.000 $3.350 $4.800 $4.730 $5.000
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 1,305.000 $5.000 $7.750 $7.610 $9.000
REMOVE TRF SIG CBL
LF 2,680.000 $2.750 $1.600 $1.580 $1.250
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 1.000 $44,000.000 $46,800.000 $45,937.500 $45,000.000
REINFORMT GRID FOR ASPHALT PVMT OVERLA
SY 127,751.000 $7.400 $5.600 $5.510 $6.000
RVDS (PRESENCE DETECTION ONLY)
EA 2.000 $8,000.000 $9,500.000 $9,318.750 $6,000.000
RVDS (PRESENCE AND ADVANCE DETECTION)
EA 4.000 $10,000.000 $10,500.000 $10,368.750 $7,500.000
Totals: $31,174,130.400 $30,085,056.410 $30,964,795.560 $33,654,544.180
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $11,000.00