PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
8.000
|
$900.000
|
$1,500.000
|
$1,000.000
|
$1,400.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
576.000
|
$12.000
|
$11.000
|
$15.000
|
$81.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
950.000
|
$6.500
|
$46.000
|
$50.000
|
$77.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
2,105.000
|
$18.000
|
$33.000
|
$20.000
|
$71.600
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
11,725.000
|
$0.500
|
$0.400
|
$0.200
|
$0.340
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
733.000
|
$7.000
|
$5.000
|
$5.000
|
$11.000
|
|
|
CL A CONC (MISC)
|
CY
|
2.000
|
$700.000
|
$850.000
|
$600.000
|
$6,600.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
134.000
|
$450.000
|
$520.000
|
$600.000
|
$907.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
3,924.000
|
$445.000
|
$395.000
|
$650.000
|
$544.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
64.000
|
$150.000
|
$88.000
|
$90.000
|
$409.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$350,000.000
|
$441,022.000
|
$100,000.000
|
$210,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$15,000.000
|
$24,000.000
|
$5,000.000
|
$19,250.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
1,500.000
|
$8.000
|
$16.000
|
$20.000
|
$26.150
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
1,500.000
|
$8.000
|
$16.000
|
$20.000
|
$26.150
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
150.000
|
$55.000
|
$175.000
|
$75.000
|
$357.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
180.000
|
$90.000
|
$192.000
|
$180.000
|
$440.000
|
|
|
PERM CTB (SGL SLOPE) (TY 4) (42 )
|
LF
|
10.000
|
$110.000
|
$582.000
|
$150.000
|
$1,288.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
1,190.000
|
$90.000
|
$180.000
|
$105.000
|
$184.000
|
|
|
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
|
LF
|
60.000
|
$210.000
|
$228.000
|
$225.000
|
$976.250
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
21,375.000
|
$26.000
|
$33.000
|
$25.390
|
$28.550
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
28.000
|
$2,200.000
|
$2,600.000
|
$2,184.000
|
$2,906.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
16.000
|
$1,150.000
|
$1,750.000
|
$1,411.000
|
$1,873.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
37.000
|
$1,200.000
|
$1,400.000
|
$1,141.000
|
$1,415.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
13.000
|
$870.000
|
$700.000
|
$890.000
|
$720.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
20,175.000
|
$3.000
|
$4.000
|
$3.500
|
$3.400
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
41.000
|
$250.000
|
$500.000
|
$350.000
|
$447.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
25.000
|
$250.000
|
$400.000
|
$300.000
|
$336.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
12.000
|
$300.000
|
$400.000
|
$300.000
|
$336.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
53,843.000
|
$11.000
|
$12.000
|
$10.000
|
$11.700
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
24.000
|
$2,200.000
|
$4,000.000
|
$4,000.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
48.000
|
$2,900.000
|
$3,600.000
|
$3,000.000
|
$3,745.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
52.000
|
$300.000
|
$400.000
|
$300.000
|
$400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$3,500.000
|
$1,000.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
3.000
|
$11,000.000
|
$42,000.000
|
$30,000.000
|
$45,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$9,000.000
|
$15,000.000
|
$10,500.000
|
$12,000.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$1,000.000
|
$550.000
|
$1,650.000
|
$1,700.000
|
|
|
IN RD IL (TY SP) 38S-8-8 (250W EQ) LED
|
EA
|
1.000
|
$4,500.000
|
$4,600.000
|
$11,000.000
|
$11,200.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
150.000
|
$9.000
|
$10.000
|
$33.000
|
$33.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
470.000
|
$2.000
|
$2.000
|
$6.600
|
$6.700
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
940.000
|
$2.250
|
$2.000
|
$6.600
|
$6.700
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$950.000
|
$1,200.000
|
$2,750.000
|
$2,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$800.000
|
$500.000
|
$1,000.000
|
$1,120.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$110.000
|
$100.000
|
$125.000
|
$230.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
40.000
|
$20.000
|
$30.000
|
$20.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
72.000
|
$20.000
|
$32.000
|
$20.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
807.000
|
$30.000
|
$33.000
|
$35.000
|
$35.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,730.000
|
$1.000
|
$3.500
|
$3.500
|
$3.350
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
640.000
|
$0.330
|
$16.000
|
$16.500
|
$16.800
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
640.000
|
$1.400
|
$4.000
|
$5.000
|
$3.350
|
|
|
REMOVAL OF CABLES
|
LF
|
1,410.000
|
$0.300
|
$3.000
|
$2.000
|
$0.600
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
336.000
|
$90.000
|
$90.000
|
$50.000
|
$155.000
|
|
|
TMA (STATIONARY)
|
DAY
|
336.000
|
$300.000
|
$200.000
|
$250.000
|
$325.000
|
|
Totals: |
$4,330,373.700
|
$4,995,101.000
|
$4,996,329.750
|
$5,646,897.350
|