REMOVING CONC (RIPRAP)
|
CY
|
62.000
|
$1.000
|
$253.840
|
$100.000
|
$560.000
|
$240.960
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
5,967.000
|
$5.500
|
$4.980
|
$6.850
|
$12.500
|
$6.070
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
245.000
|
$6.500
|
$39.220
|
$14.600
|
$40.000
|
$24.280
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
44,656.000
|
$15.000
|
$11.120
|
$15.000
|
$15.000
|
$15.130
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
9,403.000
|
$30.000
|
$10.000
|
$22.500
|
$19.000
|
$14.030
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
25.870
|
$600.000
|
$494.990
|
$415.000
|
$390.000
|
$421.200
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
25.870
|
$500.000
|
$444.230
|
$370.000
|
$350.000
|
$378.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
|
SY
|
95,561.000
|
$13.000
|
$18.570
|
$15.500
|
$15.000
|
$19.720
|
|
|
REWORK BS MTL (TY B) (14") (DENS CONT)
|
SY
|
53,716.000
|
$6.000
|
$11.080
|
$11.000
|
$6.000
|
$13.800
|
|
|
CEMENT
|
TON
|
1,034.000
|
$200.000
|
$215.130
|
$160.000
|
$165.000
|
$217.160
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
95,539.000
|
$3.500
|
$1.990
|
$2.500
|
$4.000
|
$4.110
|
|
|
PRIME COAT (MC-30)
|
GAL
|
23,884.000
|
$3.500
|
$5.130
|
$3.800
|
$6.000
|
$5.630
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
12,611.000
|
$4.000
|
$5.400
|
$4.100
|
$6.000
|
$4.480
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
36,302.000
|
$4.000
|
$3.130
|
$4.400
|
$3.000
|
$3.790
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
870.000
|
$145.000
|
$160.360
|
$165.000
|
$220.000
|
$284.960
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
59,683.000
|
$2.050
|
$2.880
|
$4.000
|
$3.000
|
$2.850
|
|
|
CEM STABIL BKFL
|
CY
|
39.000
|
$350.000
|
$507.690
|
$435.000
|
$450.000
|
$313.810
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
52.000
|
$160.000
|
$120.580
|
$221.750
|
$700.000
|
$169.570
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.000
|
$230.000
|
$507.690
|
$620.000
|
$1,000.000
|
$300.600
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
11.000
|
$695.000
|
$2,221.130
|
$710.000
|
$675.000
|
$725.750
|
|
|
RIPRAP CONC (8 IN)
|
CY
|
122.000
|
$475.000
|
$698.070
|
$422.000
|
$415.000
|
$388.530
|
|
|
RAIL (TY SSTR)
|
LF
|
74.000
|
$120.000
|
$253.840
|
$227.200
|
$216.000
|
$232.490
|
|
|
CMP (GAL STL 21 IN)
|
LF
|
12.000
|
$125.000
|
$101.540
|
$143.500
|
$2,000.000
|
$321.050
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
104.000
|
$300.000
|
$698.070
|
$640.000
|
$1,400.000
|
$567.060
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
20.000
|
$180.000
|
$152.310
|
$250.000
|
$1,300.000
|
$350.430
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
8.000
|
$200.000
|
$317.300
|
$365.000
|
$1,400.000
|
$594.620
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
4.000
|
$6,000.000
|
$8,884.510
|
$9,400.000
|
$8,918.000
|
$9,631.230
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
7.000
|
$2,000.000
|
$1,903.820
|
$3,675.000
|
$3,000.000
|
$2,285.360
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$4,442.260
|
$5,400.000
|
$3,550.000
|
$3,748.870
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$1,050.000
|
$1,269.220
|
$1,520.000
|
$800.000
|
$1,235.060
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,300.000
|
$1,269.220
|
$4,500.000
|
$1,000.000
|
$1,489.230
|
|
|
REMOV STR (HEADWALL)
|
EA
|
3.000
|
$1,160.000
|
$1,269.220
|
$3,000.000
|
$1,000.000
|
$1,489.230
|
|
|
REMOV STR (PIPE)
|
LF
|
21.000
|
$27.000
|
$12.690
|
$215.000
|
$200.000
|
$36.370
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$735,000.000
|
$922,715.150
|
$935,000.000
|
$1,000,000.000
|
$1,069,091.210
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$23,000.000
|
$10,000.000
|
$21,500.000
|
$30,000.000
|
$16,805.420
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
3,820.000
|
$7.150
|
$4.120
|
$7.500
|
$6.000
|
$3.510
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,820.000
|
$2.100
|
$0.760
|
$3.350
|
$1.000
|
$0.650
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
41,920.000
|
$0.120
|
$0.220
|
$0.500
|
$0.210
|
$0.240
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,655.000
|
$27.000
|
$30.460
|
$23.500
|
$24.000
|
$25.920
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,500.000
|
$2,062.480
|
$1,960.000
|
$1,625.000
|
$1,755.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,427.000
|
$2.700
|
$5.080
|
$3.450
|
$4.000
|
$4.320
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,700.000
|
$3,395.150
|
$2,800.000
|
$2,675.000
|
$2,889.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$345.000
|
$507.690
|
$290.000
|
$400.000
|
$432.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
5.000
|
$297.000
|
$367.840
|
$380.000
|
$321.000
|
$341.280
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$550.000
|
$786.960
|
$675.000
|
$670.000
|
$604.800
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
89.000
|
$806.000
|
$736.150
|
$585.000
|
$360.000
|
$802.440
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
25.000
|
$920.000
|
$850.370
|
$675.000
|
$462.000
|
$924.480
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
20.000
|
$1,350.000
|
$1,312.890
|
$885.000
|
$695.000
|
$1,010.880
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,360.000
|
$1,396.140
|
$1,015.000
|
$1,100.000
|
$1,242.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
21.000
|
$760.000
|
$285.570
|
$560.000
|
$225.000
|
$156.600
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
110.000
|
$140.000
|
$139.610
|
$150.000
|
$110.000
|
$118.800
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
50.000
|
$135.000
|
$174.820
|
$215.000
|
$129.000
|
$127.440
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
15.000
|
$35.000
|
$36.810
|
$100.000
|
$29.000
|
$31.320
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
197.000
|
$40.000
|
$38.080
|
$45.000
|
$30.000
|
$32.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,197.000
|
$0.400
|
$0.510
|
$0.340
|
$0.400
|
$0.430
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
1,211.000
|
$0.390
|
$0.510
|
$0.340
|
$0.400
|
$0.430
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
70,753.000
|
$0.370
|
$0.510
|
$0.340
|
$0.400
|
$0.430
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
14,300.000
|
$0.390
|
$0.490
|
$0.400
|
$0.390
|
$0.420
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
6,117.000
|
$0.750
|
$0.990
|
$0.790
|
$0.780
|
$0.840
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
72.000
|
$8.000
|
$12.690
|
$9.500
|
$10.000
|
$10.800
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
41.000
|
$150.000
|
$165.000
|
$105.550
|
$130.000
|
$140.400
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(090MIL)
|
EA
|
8.000
|
$205.000
|
$475.960
|
$316.650
|
$375.000
|
$405.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
13.000
|
$190.000
|
$266.540
|
$211.100
|
$210.000
|
$226.800
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
3,224.000
|
$6.100
|
$9.520
|
$6.850
|
$7.500
|
$8.100
|
|
REFL PAV MRKR TY I-C
|
EA
|
368.000
|
$3.850
|
$5.080
|
$3.950
|
$4.000
|
$4.320
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,391.000
|
$3.850
|
$5.080
|
$3.950
|
$4.000
|
$4.320
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
70,753.000
|
$2.000
|
$0.950
|
$0.750
|
$0.750
|
$0.810
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
15,768.000
|
$92.000
|
$97.870
|
$98.000
|
$125.000
|
$118.550
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
10,598.000
|
$112.000
|
$111.300
|
$112.000
|
$140.000
|
$131.770
|
|
|
TACK COAT
|
GAL
|
9,670.000
|
$4.000
|
$5.850
|
$5.000
|
$5.000
|
$8.120
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,757.000
|
$25,777.380
|
$23,500.000
|
$15,000.000
|
$5,365.040
|
|
|
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
|
LF
|
67,872.000
|
$0.350
|
$0.490
|
$0.400
|
$0.390
|
$0.420
|
|
|
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
|
LF
|
210,142.000
|
$0.300
|
$0.490
|
$0.400
|
$0.390
|
$0.420
|
|
|
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
|
LF
|
51,536.000
|
$0.350
|
$0.490
|
$0.400
|
$0.390
|
$0.420
|
|
|
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
|
LF
|
155,992.000
|
$0.300
|
$0.490
|
$0.400
|
$0.390
|
$0.420
|
|
|
TMA (STATIONARY)
|
DAY
|
390.000
|
$375.000
|
$412.420
|
$375.000
|
$250.000
|
$437.650
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
90.000
|
$90.000
|
$98.200
|
$75.000
|
$95.000
|
$116.930
|
|
Totals: |
$8,577,014.950
|
$9,215,103.341
|
$9,367,148.170
|
$10,198,442.290
|
$10,690,912.164
|