PREPARING ROW
|
STA
|
2.500
|
$2,000.000
|
$0.010
|
$4,500.000
|
$6,840.000
|
$2,000.000
|
$2,500.000
|
|
|
REMOV CONC (MOWSTRIP)
|
SY
|
150.000
|
$25.000
|
$17.350
|
$40.000
|
$26.600
|
$25.000
|
$50.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
44.000
|
$35.000
|
$63.000
|
$30.000
|
$36.270
|
$25.000
|
$25.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
1,913.000
|
$44.000
|
$15.250
|
$50.000
|
$25.030
|
$25.000
|
$5.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
256.000
|
$25.000
|
$19.000
|
$25.000
|
$31.170
|
$25.000
|
$10.000
|
|
|
REMOV CONC (CURB OR CURB & GUTTER)
|
LF
|
1,801.000
|
$12.000
|
$13.450
|
$10.000
|
$13.290
|
$10.000
|
$10.000
|
|
|
EXCAV (SPECIAL)
|
CY
|
308.000
|
$30.000
|
$33.000
|
$40.000
|
$77.730
|
$35.000
|
$150.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
2,532.000
|
$55.000
|
$41.450
|
$30.000
|
$49.020
|
$35.000
|
$65.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
6,648.000
|
$7.000
|
$5.450
|
$6.000
|
$4.800
|
$15.000
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
6,648.000
|
$10.000
|
$9.350
|
$7.000
|
$6.840
|
$20.000
|
$7.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
114.800
|
$60.000
|
$240.000
|
$50.000
|
$1.140
|
$46.000
|
$300.000
|
|
|
RDSIDE AMENITY (WHEEL STOP REMOV&RESET)
|
EA
|
5.000
|
$300.000
|
$662.200
|
$250.000
|
$114.000
|
$150.000
|
$500.000
|
|
|
SP MIXES SP-D PG70-28
|
TON
|
40.000
|
$600.000
|
$753.450
|
$750.000
|
$399.000
|
$350.000
|
$500.000
|
|
|
TACK COAT
|
GAL
|
32.000
|
$10.000
|
$37.950
|
$20.000
|
$11.400
|
$25.000
|
$50.000
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
500.000
|
$10.000
|
$17.950
|
$20.000
|
$13.680
|
$20.000
|
$75.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
464.000
|
$190.000
|
$242.650
|
$250.000
|
$100.290
|
$200.000
|
$350.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
6.000
|
$530.000
|
$639.600
|
$400.000
|
$456.000
|
$500.000
|
$500.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
225.000
|
$25.000
|
$25.650
|
$30.000
|
$1.140
|
$35.000
|
$75.000
|
|
|
CL A CONC (MISC)
|
CY
|
20.000
|
$1,000.000
|
$955.550
|
$1,250.000
|
$753.010
|
$875.000
|
$850.000
|
|
|
CL A CONC (FLUME)
|
CY
|
3.000
|
$1,000.000
|
$9,104.050
|
$800.000
|
$753.010
|
$875.000
|
$850.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
18.000
|
$825.000
|
$796.700
|
$750.000
|
$753.010
|
$825.000
|
$1,000.000
|
|
|
RAIL (TY PR11)
|
LF
|
421.000
|
$175.000
|
$160.950
|
$175.000
|
$296.400
|
$150.000
|
$175.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
2,078.000
|
$620.000
|
$463.150
|
$700.000
|
$741.000
|
$567.000
|
$750.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
41.000
|
$1,500.000
|
$1,911.000
|
$1,250.000
|
$1,254.000
|
$900.000
|
$750.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
24.000
|
$200.000
|
$206.250
|
$165.000
|
$136.800
|
$175.000
|
$100.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
15.000
|
$250.000
|
$303.450
|
$200.000
|
$228.000
|
$200.000
|
$125.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
118.000
|
$300.000
|
$297.200
|
$250.000
|
$330.600
|
$250.000
|
$175.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
6.000
|
$8,000.000
|
$12,366.950
|
$10,000.000
|
$13,908.000
|
$10,000.000
|
$7,500.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
3.000
|
$10,000.000
|
$17,945.550
|
$10,000.000
|
$7,182.000
|
$10,000.000
|
$7,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
3.000
|
$9,800.000
|
$10,472.000
|
$15,000.000
|
$8,208.000
|
$30,000.000
|
$15,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$12,500.000
|
$11,000.000
|
$15,000.000
|
$11,400.000
|
$30,000.000
|
$15,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$29,000.000
|
$18,000.000
|
$25,000.000
|
$39,900.000
|
$32,750.000
|
$15,000.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$1,200.000
|
$915.800
|
$1,000.000
|
$285.000
|
$2,000.000
|
$500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
7.000
|
$2,000.000
|
$1,632.600
|
$2,000.000
|
$1,140.000
|
$3,000.000
|
$750.000
|
|
|
REMOV STR (PIPE)
|
LF
|
254.000
|
$60.000
|
$54.500
|
$25.000
|
$14.820
|
$30.000
|
$20.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
12.000
|
$150.000
|
$594.350
|
$500.000
|
$114.000
|
$50.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$375,000.000
|
$375,067.900
|
$450,000.000
|
$348,359.680
|
$465,000.000
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$8,000.000
|
$3,386.050
|
$5,000.000
|
$3,990.000
|
$21,875.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$14,000.000
|
$30,000.000
|
$5,700.000
|
$18,500.000
|
$3,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$300.000
|
$500.000
|
$100.000
|
$0.110
|
$460.000
|
$325.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
16.000
|
$100.000
|
$97.700
|
$100.000
|
$0.110
|
$95.000
|
$325.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
251.000
|
$70.000
|
$65.150
|
$60.000
|
$0.110
|
$40.000
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
251.000
|
$20.000
|
$20.650
|
$20.000
|
$0.110
|
$20.000
|
$25.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
600.000
|
$7.000
|
$15.500
|
$3.000
|
$0.110
|
$20.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,739.000
|
$8.000
|
$8.000
|
$5.000
|
$0.110
|
$3.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,739.000
|
$1.000
|
$1.550
|
$2.000
|
$0.110
|
$1.000
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
429.000
|
$5.000
|
$19.650
|
$8.000
|
$0.110
|
$8.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
429.000
|
$2.000
|
$1.550
|
$1.500
|
$0.110
|
$2.000
|
$3.000
|
|
|
COLORED TEXTURED CONC (5")
|
SY
|
720.000
|
$130.000
|
$123.250
|
$120.000
|
$108.500
|
$100.000
|
$750.000
|
|
|
CONC CURB (TY I)
|
LF
|
880.000
|
$35.000
|
$39.700
|
$40.000
|
$49.500
|
$35.000
|
$35.000
|
|
|
CONC CURB (TY II)
|
LF
|
803.000
|
$35.000
|
$35.250
|
$40.000
|
$49.500
|
$35.000
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,834.000
|
$55.000
|
$37.950
|
$50.000
|
$49.500
|
$40.000
|
$100.000
|
|
|
CONC CURB (TY F3)
|
LF
|
162.000
|
$200.000
|
$209.100
|
$50.000
|
$280.260
|
$410.000
|
$35.000
|
|
|
DRIVEWAYS (CONC) (TY 1)
|
SY
|
1,414.000
|
$175.000
|
$236.050
|
$110.000
|
$108.190
|
$150.000
|
$150.000
|
|
|
DRIVEWAYS (CONC) (TY 2)
|
SY
|
353.000
|
$175.000
|
$255.100
|
$110.000
|
$148.180
|
$150.000
|
$150.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
8,372.000
|
$112.000
|
$66.200
|
$95.000
|
$108.500
|
$105.000
|
$100.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
325.000
|
$175.000
|
$231.950
|
$170.000
|
$115.390
|
$165.000
|
$150.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
37.000
|
$175.000
|
$239.050
|
$170.000
|
$115.390
|
$230.000
|
$150.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
50.000
|
$175.000
|
$325.550
|
$170.000
|
$115.390
|
$165.000
|
$150.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
247.000
|
$175.000
|
$133.100
|
$170.000
|
$115.390
|
$165.000
|
$150.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
279.000
|
$8.000
|
$28.750
|
$10.000
|
$19.380
|
$15.600
|
$10.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$1,788.250
|
$350.000
|
$1,368.000
|
$1,000.000
|
$500.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
2.000
|
$250.000
|
$638.250
|
$400.000
|
$627.000
|
$1,500.000
|
$250.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
110.000
|
$20.000
|
$23.000
|
$20.000
|
$34.200
|
$20.000
|
$30.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
110.000
|
$5.000
|
$2.580
|
$4.000
|
$11.400
|
$2.250
|
$4.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
8.000
|
$2,200.000
|
$2,300.000
|
$2,000.000
|
$3,249.000
|
$2,000.000
|
$3,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
18.000
|
$500.000
|
$747.500
|
$600.000
|
$627.000
|
$711.910
|
$750.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$900.000
|
$747.500
|
$600.000
|
$627.000
|
$711.910
|
$1,000.000
|
|
RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY)
|
EA
|
2.000
|
$450.000
|
$632.500
|
$550.000
|
$627.000
|
$550.000
|
$1,000.000
|
|
|
PAVEMENT SLER 4"
|
LF
|
175.000
|
$1.000
|
$6.320
|
$5.500
|
$6.270
|
$5.500
|
$8.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
126.000
|
$1.000
|
$6.320
|
$5.500
|
$6.270
|
$5.500
|
$8.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
682.000
|
$3.000
|
$11.500
|
$10.000
|
$11.400
|
$10.000
|
$15.000
|
|
|
PAVEMENT SLER (SYMBOL)
|
EA
|
2.000
|
$50.000
|
$172.500
|
$150.000
|
$171.000
|
$150.000
|
$200.000
|
|
REFL PAV MRK TY I (Y)4"(SLD)(100MIL)
|
LF
|
175.000
|
$2.000
|
$8.620
|
$7.500
|
$8.550
|
$7.500
|
$10.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
126.000
|
$2.000
|
$11.500
|
$10.000
|
$11.400
|
$10.000
|
$15.000
|
|
PREFAB PM TY B (W)(24")(SLD)
|
LF
|
682.000
|
$20.000
|
$46.000
|
$40.000
|
$45.600
|
$40.000
|
$55.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
272.000
|
$2.000
|
$3.450
|
$3.000
|
$3.420
|
$3.000
|
$5.000
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
241.000
|
$2.000
|
$4.600
|
$4.000
|
$4.560
|
$4.000
|
$6.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
76.000
|
$7.000
|
$6.900
|
$6.000
|
$6.840
|
$6.000
|
$8.000
|
|
|
ELIM EXT PM & MRKS (SYMBOL)
|
EA
|
2.000
|
$100.000
|
$172.500
|
$150.000
|
$171.000
|
$150.000
|
$250.000
|
|
|
ELIM EXT PM & MRKS (MED NOSE)
|
EA
|
1.000
|
$220.000
|
$460.000
|
$400.000
|
$456.000
|
$400.000
|
$600.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
175.000
|
$0.750
|
$3.450
|
$3.000
|
$3.420
|
$3.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
126.000
|
$0.500
|
$4.600
|
$4.000
|
$4.560
|
$4.000
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
682.000
|
$3.000
|
$6.900
|
$6.000
|
$6.840
|
$6.000
|
$8.000
|
|
|
PAV SURF PREP FOR MRK (SYMBOL)
|
EA
|
2.000
|
$50.000
|
$172.500
|
$150.000
|
$171.000
|
$150.000
|
$250.000
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
1.000
|
$20,000.000
|
$23,000.000
|
$25,000.000
|
$17,413.500
|
$20,000.000
|
$35,000.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
3.000
|
$1,000.000
|
$920.000
|
$900.000
|
$1,710.000
|
$800.000
|
$1,000.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
|
LF
|
2,000.000
|
$3.000
|
$2.300
|
$3.000
|
$5.700
|
$2.000
|
$3.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
1,500.000
|
$3.000
|
$2.870
|
$3.000
|
$7.980
|
$2.500
|
$3.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
1.000
|
$8,500.000
|
$3,450.000
|
$4,000.000
|
$8,578.500
|
$3,000.000
|
$10,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
4.000
|
$1,200.000
|
$920.000
|
$1,000.000
|
$1,881.000
|
$800.000
|
$1,000.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
1.000
|
$500.000
|
$172.500
|
$300.000
|
$570.000
|
$150.000
|
$200.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
2.000
|
$500.000
|
$57.500
|
$100.000
|
$285.000
|
$50.000
|
$100.000
|
|
Totals: |
$4,563,860.250
|
$4,015,191.095
|
$4,485,352.500
|
$4,495,041.672
|
$4,676,737.810
|
$5,317,924.000
|