|
|
REMOVING CONC (RIPRAP)
|
SY
|
280.000
|
$25.000
|
$13.100
|
$11.900
|
$25.000
|
$13.300
|
|
|
REMOVING CONC (CTB)
|
LF
|
128.000
|
$50.000
|
$28.500
|
$26.000
|
$75.000
|
$29.000
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
1,213.000
|
$16.000
|
$31.000
|
$16.900
|
$50.000
|
$18.900
|
|
|
REMOVING STAB BASE AND ASPH PAV (4")
|
SY
|
323.000
|
$16.000
|
$23.000
|
$34.300
|
$50.000
|
$38.350
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,584.000
|
$30.000
|
$22.000
|
$33.500
|
$50.000
|
$37.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
622.000
|
$30.000
|
$55.000
|
$38.500
|
$50.000
|
$43.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
AC
|
4.690
|
$1,385.000
|
$2,000.000
|
$840.000
|
$2,000.000
|
$2,010.000
|
|
|
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
|
SY
|
4,250.000
|
$42.000
|
$55.000
|
$31.600
|
$50.000
|
$35.300
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
4,250.000
|
$10.000
|
$16.500
|
$14.200
|
$30.000
|
$15.900
|
|
|
LIME (HYD(SLY OR DRY) COM OR QK(DRY)
|
TON
|
46.000
|
$300.000
|
$440.000
|
$425.000
|
$360.000
|
$475.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,064.000
|
$7.000
|
$8.000
|
$8.800
|
$10.000
|
$10.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
65.000
|
$10.000
|
$10.000
|
$28.000
|
$50.000
|
$31.300
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
152.000
|
$300.000
|
$350.000
|
$440.000
|
$325.000
|
$365.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
28.000
|
$850.000
|
$897.000
|
$900.000
|
$1,000.000
|
$1,540.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
98.000
|
$690.000
|
$545.000
|
$900.000
|
$750.000
|
$910.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
616.000
|
$600.000
|
$550.000
|
$750.000
|
$500.000
|
$904.000
|
|
|
RAIL (TY SSTR)
|
LF
|
202.000
|
$105.000
|
$155.000
|
$340.000
|
$200.000
|
$166.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
56.000
|
$210.000
|
$335.000
|
$303.000
|
$400.000
|
$339.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
3.000
|
$12,500.000
|
$9,400.000
|
$8,540.000
|
$15,000.000
|
$9,440.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$12,500.000
|
$8,475.000
|
$7,705.000
|
$15,000.000
|
$8,610.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
1.000
|
$2,900.000
|
$6,535.000
|
$5,940.000
|
$12,500.000
|
$6,635.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
1.000
|
$2,100.000
|
$4,855.000
|
$4,415.000
|
$5,000.000
|
$4,935.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$750.000
|
$1,510.000
|
$1,375.000
|
$1,600.000
|
$1,540.000
|
|
|
REMOV STR (PIPE)
|
LF
|
24.000
|
$45.000
|
$77.500
|
$70.500
|
$220.000
|
$79.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$275,000.000
|
$250,000.000
|
$152,655.000
|
$310,000.000
|
$223,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$20,000.000
|
$2,500.000
|
$2,800.000
|
$40,000.000
|
$38,800.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
625.000
|
$5.000
|
$8.000
|
$3.300
|
$6.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
625.000
|
$2.000
|
$1.000
|
$1.300
|
$2.000
|
$2.250
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
1,709.000
|
$70.000
|
$109.000
|
$200.000
|
$150.000
|
$116.000
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
123.000
|
$250.000
|
$322.500
|
$330.000
|
$250.000
|
$613.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$38.000
|
$37.500
|
$50.000
|
$46.000
|
$52.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$3,000.000
|
$2,925.000
|
$3,900.000
|
$3,300.000
|
$3,966.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
12,155.000
|
$16.000
|
$21.250
|
$28.000
|
$22.000
|
$25.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
6.000
|
$5,000.000
|
$6,000.000
|
$8,100.000
|
$10,225.000
|
$5,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,690.000
|
$6,450.000
|
$4,600.000
|
$3,950.000
|
$4,415.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$28,500.000
|
$31,500.000
|
$42,000.000
|
$40,000.000
|
$40,300.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
11.000
|
$1,150.000
|
$1,127.500
|
$1,300.000
|
$1,025.000
|
$1,150.000
|
|
|
IN RD IL (TY ST) 40T-8 (250W EQ) LED
|
EA
|
19.000
|
$7,800.000
|
$5,100.000
|
$6,300.000
|
$4,665.000
|
$5,220.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
4,120.000
|
$14.500
|
$18.500
|
$22.000
|
$16.750
|
$19.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
930.000
|
$33.000
|
$33.000
|
$41.000
|
$30.360
|
$34.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
5,360.000
|
$2.200
|
$2.350
|
$2.700
|
$2.140
|
$2.400
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
10,720.000
|
$2.250
|
$2.500
|
$3.000
|
$2.260
|
$2.550
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
14.000
|
$1,800.000
|
$1,600.000
|
$2,000.000
|
$1,500.000
|
$1,680.000
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
$600.000
|
$135.000
|
$170.000
|
$125.000
|
$140.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
14.000
|
$940.000
|
$975.000
|
$1,300.000
|
$1,400.000
|
$1,225.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
6.000
|
$39.000
|
$47.000
|
$60.000
|
$44.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
6.000
|
$39.000
|
$38.000
|
$50.000
|
$41.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
34.000
|
$36.000
|
$38.000
|
$50.000
|
$41.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$45.000
|
$38.000
|
$50.000
|
$41.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
7.000
|
$140.000
|
$150.000
|
$200.000
|
$100.000
|
$176.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
3.000
|
$140.000
|
$150.000
|
$200.000
|
$100.000
|
$180.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
7.000
|
$150.000
|
$150.000
|
$200.000
|
$100.000
|
$185.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
4,060.000
|
$1.100
|
$3.300
|
$4.000
|
$3.000
|
$3.350
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
8,885.000
|
$2.000
|
$1.100
|
$1.300
|
$1.000
|
$1.150
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
75.000
|
$15.000
|
$16.500
|
$20.250
|
$15.000
|
$17.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
4.000
|
$10.500
|
$22.000
|
$27.100
|
$20.000
|
$22.350
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
662.000
|
$5.750
|
$5.500
|
$6.500
|
$5.000
|
$5.600
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
935.000
|
$250.000
|
$229.460
|
$208.600
|
$210.000
|
$235.000
|
|
|
TACK COAT
|
GAL
|
552.000
|
$7.000
|
$10.250
|
$9.400
|
$5.000
|
$10.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$7,500.000
|
$16,000.000
|
$20,000.000
|
$8,400.000
|
|
|
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
|
LF
|
8,539.000
|
$0.800
|
$0.800
|
$1.000
|
$0.730
|
$0.850
|
|
|
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
|
LF
|
38,607.000
|
$0.800
|
$0.770
|
$0.900
|
$0.700
|
$0.800
|
|
|
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
|
LF
|
38,607.000
|
$0.800
|
$0.770
|
$0.900
|
$0.700
|
$0.800
|
|
|
TMA (STATIONARY)
|
DAY
|
85.000
|
$300.000
|
$250.000
|
$300.000
|
$150.000
|
$475.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$90.000
|
$50.000
|
$125.000
|
$95.000
|
$132.000
|
|
Totals: |
$2,548,524.550
|
$2,622,116.830
|
$2,985,636.450
|
$3,118,070.670
|
$3,144,651.100
|