REMOVING CONC (DRIVEWAYS)
|
SY
|
110.000
|
$15.000
|
$21.000
|
$25.000
|
$20.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
891.000
|
$6.000
|
$6.430
|
$5.000
|
$25.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
480.000
|
$25.000
|
$45.650
|
$38.000
|
$30.000
|
|
|
BACKFILL (TY A)
|
STA
|
445.300
|
$190.000
|
$192.150
|
$380.000
|
$150.000
|
|
|
BACKFILL (TY B)
|
STA
|
445.300
|
$190.000
|
$88.020
|
$275.000
|
$125.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
98,901.000
|
$0.100
|
$0.030
|
$0.030
|
$0.040
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
98,901.000
|
$0.100
|
$0.030
|
$0.030
|
$0.040
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
197,801.000
|
$0.250
|
$0.170
|
$0.160
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
1,186.000
|
$10.000
|
$21.190
|
$25.000
|
$7.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
7,806.000
|
$70.000
|
$56.000
|
$63.100
|
$68.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
8,457.000
|
$1.500
|
$2.210
|
$1.950
|
$3.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
428,381.000
|
$2.750
|
$1.500
|
$1.800
|
$3.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
234.000
|
$415.000
|
$525.000
|
$500.000
|
$450.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
1,395.000
|
$30.000
|
$25.200
|
$31.000
|
$40.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
1,915.000
|
$225.000
|
$204.960
|
$245.000
|
$200.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$809,152.000
|
$75,000.000
|
$429,200.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$6,500.000
|
$12,500.000
|
$8,250.000
|
$8,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,800.000
|
$2.500
|
$2.630
|
$2.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,800.000
|
$0.650
|
$0.110
|
$0.100
|
$0.150
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
750.000
|
$20.000
|
$8.000
|
$25.000
|
$25.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
5,850.000
|
$15.000
|
$5.000
|
$20.000
|
$8.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
750.000
|
$25.000
|
$8.000
|
$25.000
|
$15.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
110.000
|
$85.000
|
$105.000
|
$115.000
|
$110.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,560.000
|
$35.000
|
$41.790
|
$38.750
|
$30.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,462.000
|
$18.500
|
$30.880
|
$29.400
|
$12.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
177,274.000
|
$0.300
|
$0.190
|
$0.100
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
86,577.000
|
$0.200
|
$0.180
|
$0.090
|
$0.250
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,650.000
|
$25.000
|
$26.780
|
$29.000
|
$30.000
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
22.000
|
$2,250.000
|
$1,837.500
|
$1,875.000
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,650.000
|
$2.500
|
$2.100
|
$2.000
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
22.000
|
$2,500.000
|
$2,782.500
|
$2,850.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
22.000
|
$300.000
|
$210.000
|
$200.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
20.000
|
$1,450.000
|
$1,575.000
|
$2,100.000
|
$2,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$850.000
|
$735.000
|
$800.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,000.000
|
$9,870.000
|
$9,400.000
|
$10,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$95.000
|
$26.250
|
$250.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
61.000
|
$26.000
|
$29.400
|
$22.000
|
$40.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
17,400.000
|
$0.210
|
$0.210
|
$0.200
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
74,408.000
|
$0.200
|
$0.210
|
$0.200
|
$0.220
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
4,672.000
|
$3.750
|
$3.150
|
$3.000
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
6,672.000
|
$2.000
|
$2.100
|
$2.000
|
$2.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,950.000
|
$0.650
|
$1.510
|
$2.000
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,321.000
|
$0.750
|
$0.790
|
$0.750
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
103.000
|
$6.000
|
$6.300
|
$6.000
|
$7.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
2.000
|
$145.000
|
$157.500
|
$150.000
|
$200.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
2.000
|
$150.000
|
$157.500
|
$150.000
|
$200.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
41.000
|
$35.000
|
$42.000
|
$40.000
|
$45.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
738.000
|
$3.500
|
$3.680
|
$3.500
|
$4.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
222,386.000
|
$0.300
|
$0.340
|
$0.320
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
22,590.000
|
$2.750
|
$0.420
|
$0.400
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
88,647.000
|
$0.300
|
$0.340
|
$0.320
|
$0.350
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,449.000
|
$2.850
|
$3.360
|
$3.200
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
19,429.000
|
$0.300
|
$0.260
|
$0.250
|
$0.300
|
|
|
D-GR HMA TY-C PG64-22 (LEVEL-UP)
|
TON
|
7,612.000
|
$90.000
|
$86.000
|
$85.200
|
$102.000
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
45,140.000
|
$92.000
|
$90.000
|
$86.850
|
$102.000
|
|
|
BONDING COURSE
|
GAL
|
34,099.000
|
$3.800
|
$4.250
|
$4.500
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,250.000
|
$5,000.000
|
$8,750.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$170.000
|
$450.000
|
$360.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$70.000
|
$75.000
|
$80.000
|
$30.000
|
|
Totals: |
$9,286,772.100
|
$7,781,705.261
|
$8,440,639.260
|
$9,409,494.840
|